Loading...
Specifications (9) • JOB NAME: Tigard Triangle Commons Parking Garage CITY OF TIGARD JOB ADDRESS: 11850 SW 67th, Tigard, OR FRE COPY B IL HAL DEPARTMENT DATE: June 1, 2006 MCE Project No.: 060594 TIGARD, OR 97223 SHEET 1 OF 2 Tigard Building Permit BUP- 2006 -00207 STRUCTURAL PLAN REVIEW #1 Plans Dated 3/21/06; Calculations Dated 3/21/06 Corr. Item Page No. Comments Code Section Made No. 1 S1.0 Seismic criteria, site class 'C' to be verified by soils 106.1.1 report. • 2 S1.0 Concrete structural note calls for 5,500 PSI concrete 106.1.1 for P.T. slab. Drawing S2.2 calls for F' = 5,000 PSI for P/T flat plate. Clarify which strength is required. 3 S1.0 Tension LAP splice tables for top bars are shown for 106.1.1 5,000 and 6,000 PSI concrete. P.T. slab appears to be 5,500 PSI and note 3 says to "interpolate for splice length as necessary." Explain and /or give an example. 4 S2.3 Please provide finish floor elevations on drawing S2.3 106.1.1 and accommodate slopes for drainage. Drawings C2.0 indicate diagonal grade contours. Drawing C2.0 indicates diagonal grade contour lines: coordinate. 5 Calculations Structural calculations indicate that the concrete is 106.1.1 overstressed in shear at d/2 from the face of column. The added shear value from the stud rails is not shown. Please provide. 6 There does not appear to be a height restriction for 106.1.1 the P/T slab entry from adjacent grade. If vehicle size, height, or weight is not restricted, P/T slab must meet the requirements of IBC Section 1607.6 (50 PSF L.L.). 7 Calculation Submit calculation for moment with 6,000 pound Toad 106.1.1 • P -1 at 18 inches above slab. 8 Calculation Submit calculations and details for material used, 106.1.1 P -1 brick or CMU, with loads taken into slab. 9 Sht. S5.1 Clarify tie spacing. 106.1.1 Detail 5/S5.1 10 Sht. S5.2 Submit calculations for loads and method of 106.1.1 Detail distribution. 14/S5.2 • 11 Sht. S5.1 Submit calculations for parapet. 106.1.1 Detail 9/S5.1 12 Sht. S5.3 Submit calculations and details for steel decking. 106.1.1 Details 4/S5.3, • 9/S5.3, 12/S5.3 JOB NAME: Tigard Triangle Commons Parking Garage CITY OF TIGARD JOB ADDRESS: 11850 SW 67th, Tigard, OR BUILDING DEPARTMENT DATE: June 1, 2006 13125 HALL BOULEVARD MCE Project No.: 060594 TIGARD, OR 97223 • SHEET 2 OF 2 Tigard Building Permit BUP- 2006 -00207 STRUCTURAL PLAN REVIEW #1 Plans Dated 3/21/06; Calculations Dated 3/21/06 Corr. Item Page No. Comments Code Section Made No. 13 Calculations, Submit calculations for eccentricity with east wall. 106.1.1 Page 3 14 General Submit one set of miscellaneous steel shop drawings, which have been reviewed and initialed by the project engineer, to be filed with the City of Tigard before placement. • 15 General Submit one set of steel stair framing drawings, which have been reviewed and initialed by the project engineer, to be filed with the City of Tigard before placement. 16 General Submit one set of steel decking shop drawings, which have been reviewed and initialed by the project engineer, to be filed with the City of Tigard before placement. 17 General Submit one set of P/T shop drawings, which have been reviewed and initialed by the project engineer, to be filed with the City of Tigard before placement. • 18 General Submit one set of reinforcing steel shop drawings, which have been reviewed and initialed by the project engineer, to be filed with the City of Tigard before placement. 19 Sht. S1.0 Submit when or how often for type of work listed as 1704 • Special periodic. Inspection 20 Special Special inspection is required for concrete, welding, 1704 Inspection reinforcing steel, bolting, welded studs, embed plates, 1705 bolts in concrete, masonry, soils, structural steel 1707 • fabrication and erection, adhesive and expansion 1708 anchor installation and P/T. 21 Structural Structural observation is required for concrete 1709 Observation foundation, retaining walls, reinforcing steel in shear walls or P/T slab, before concrete placement at second floor, and before stressing P/T slab. 22 General Approved resolution of the above items shall be incorporated into submittal plans before a permit will be issued. Submit four (4) sets of revised plans to the city of Tigard. JOB NAME: Tigard Triangle Commons Parking Garag 0 CITY OF TIGARD JOB ADDRESS: 11850 SW 67th, Tigard, OR �0 BUILDING DEPARTMENT DATE: August 7, 2006 r \\ ,. RO 13125 HALL BOULEVARD MCE Project No.: 060594 S�p� G O\ \J;\ TIGARD, OR 97223 ,N SHEET 1 OF 2 B Building Permit BUP- 2006 -00207 STRUCTURAL PLAN REVIEW #3 Plans Dated 6/23106; Calculations and Details Dated 7/31/06 Corr. Item Page No. Comments Code Section Made No. 7/28/06 1 S1.0 Seismic criteria, site class 'C' to be verified by soils 106.1.1 report. 7/28/06 2 S1.0 Concrete structural note calls for 5,500 PSI concrete 106.1.1 for P.T. slab. Drawing S2.2 calls for F' = 5,000 PSI for P/T flat plate. Clarify which strength is required. 7/28/06 3 S1.0 Tension LAP splice tables for top bars are shown for 106.1.1 5,000 and 6,000 PSI concrete. P.T. slab appears to be 5,500 PSI and note 3 says to Interpolate for splice length as necessary! Explain and /or give an example. 7/28/06 4 S2.3 Please provide finish floor elevations on drawing S2.3 106.1.1 and accommodate slopes for drainage. Drawings C2.0 indicate diagonal grade contours. Drawing C2.0 indicates diagonal grade contour lines: coordinate. 7/28/06 5 Calculations Structural calculations indicate that the concrete is 106.1.1 overstressed in shear at d/2 from the face of column. The added shear value from the stud rails is not shown. Please provide. 7/28/06 6 There does not appear to be a height restriction for the 106.1.1 P/T slab entry from adjacent grade. If vehicle size, height, or weight is not restricted, P/T slab must meet the requirements of IBC Section 1607.6 (50 PSF L.L.). 8/4/06 7 Calculation Submit calculation for moment with 6,000 pound load 106.1.1 P -1 at 18 inches above slab. NOTE: Submit masonry and steel stresses. 8/4/06 8 Calculation Submit calculations and details for material used, brick 106.1.1 P -1 or CMU, with Toads taken into slab. NOTE: Submit masonry and steel stresses. 7/28/06 '9 Sht. S5.1 Clarify tie spacing. 106.1.1 Detail 5/S5.1 8/4/06 10 Sht. S5.2 Submit calculations for Toads and method of 106.1.1 Detail distribution. 14/S5.2 8/4/06 11 Sht. S5.1 Submit calculations for parapet. 106.1.1 Detail 9/S5.1 7/28/06 12 Sht. S5.3 Submit calculations and details for steel decking. 106.1.1 Details 4/S5.3, 9/S5.3, 12/S5.3 Ls\ JOB NAME: Tigard Triangle Commons Parking Garage , C, CITY OF TIGARD JOB ADDRESS: 11850 SW 67th, Tigard, OR BUILDING DEPARTMENT DATE: August 7, 2006 �,p 13125 HALL BOULEVARD MCE Project No.: 060594 �;� NC) S \0'1 TIGARD, OR 97223 SHEET 2 OF 2 �tp�N Tigard Building Permit BUP- 2006 -00207 STRUCTURAL PLAN REVIEW #3 Plans Dated 6/23/06; Calculations and Details Dated 7/31/06 Corr. Item Page No. Comments Code Section Made No. 7/28/06 13 Calculations, Submit calculations for eccentricity with east wall. 106.1.1 Page 3 14 General Submit one set of miscellaneous steel shop drawings, (Shop which have been reviewed and initialed by the project Drawings) engineer, to be filed with the City of Tigard before placement. 15 General Submit one set of steel stair framing drawings, which (Deterred have been reviewed and initialed by the project Submittal as t engineer, to be filed with the City of Tigard before indicated on 9 ty g drawings) placement. 16 General Submit one set of steel decking shop drawings, which (Shop have been reviewed and initialed by the project Drawings) engineer, to be filed with the City of Tigard before placement. 17 General Submit one set of P/T shop drawings, which have (Shop been reviewed and initialed by the project engineer, to Drawings) be filed with the City of Tigard before placement. 18 General Submit one set of reinforcing steel shop drawings, (Shop which have been reviewed and initialed by the project Drawings) engineer, to be filed with the City of Tigard before placement. 19 Sht. S1.0 Submit when or how often for type of work listed as 1704 Special periodic. Inspection 20 Special Special inspection is required for concrete, welding, 1704 Inspection reinforcing steel, bolting, welded studs, embed plates, 1705 bolts in concrete, masonry, soils, structural steel 1707 fabrication and erection, adhesive and expansion 1708 anchor installation and P/T. 21 Structural Structural observation is required for concrete 1709 Observation foundation, retaining walls, reinforcing steel in shear walls or P/T slab, before concrete placement at ��. second floor, and before stressing P/T slab. 22 General Approved resolution of the above items shall be incorporated into submittal plans before a permit will be issued. Submit four (4) sets of revised plans to the city of Tigard. _