Loading...
Report (7) From: 09/07/2007 15:44 #010 P.003 /011 m:(503)620 -2748 ACS Testing Inc. To:Final Letter (15036396345) 17:16 09107107GMT -5:00 Pg 03-04 eo, 2 w — CZfZo 7409 SW Tech Center Dr. Ste. 145 Tigard. OR 97223 Ph: 503443-3799 Fax 503 -620 -2748 1LR[1LAL SPECIAL INSPECTION FINAL REPORT DATE: September 5, 2007 PROJECT: Tigard Triangle Building 2 PERMIT #: BP 2006 00207 ADDRESS: 11850 SW 67 Ave CITY: Tigard STATE: Oregon OFFICE Copy. To Whom It May Concern: ACS Testing, Inc_ attests that their inspectors performed special inspection(s) on a continuous and/or periodic basis as required by the specific jurisdiction and/or IBC. Special inspection(s) were performed for the following: Reinforced Concrete . Cast in place anchors Structural Steel (on-site & at fabrication shop) Structural Masonry Post Tension Based on personal observation, inspection and reports reviewed by me for the above project, I attest on behalf of ACS that work was performed to the best of my knowledge, in accordance with approved plans, specifications, and the applicable codes and standards for this jurisdiction. k Appro . � BOB BROWN E,CEN ED President (t (iii l SEP BB /cs Cit ®�D VlSI ®�� BU From 09/07/2007 15:44 #010 P.004/011 m:(503)620 -2748 ACS Testing Inc. To:Final Letter (15036396345) 17:16 09/07107GMT -5 :00 Pg 04-04 ecJ2 `Z�'' OO&/ ev 7409 SW Tech Center Dr. Ste. 145 Tigard, OR 97223 44411C1;644.* ..."17e'ThZ Ph: 503 -443 -3799 Fax: 503 - 620 -2748 SPECIAL INSPECTION FINAL REPORT DATE: September 5, 2007 FICEi Ca PROJECT: Tigard Triangle Building 3 Y PERMTT #: BP 2006 00207 ADDRESS: 11850 SW X Ave „ettAtLc_*<. /be,- CITY: Tigard . OreZon F To Whom It May Concern: ACS Testing, Inc. attests that their inspectors performed special inspection(s) on a continuous and/or periodic basis as required by the specific jurisdiction and/or IBC. Special inspection(s) were performed for the following: Reinforced Concrete Structural Masonry Based on personal observation, inspection and reports reviewed by me for the above project, I attest on behalf of ACS that work was performed to the best of my knowledge, in accordance with approved plans, specifications, and the applicable codes and standards for • this jurisdiction . l Approved by: BOB BROWN President * E CE ED Er) BB /cs F. CITY OF ► IGARD B U L G O I S G ISIOF • •