Loading...
Report (5) From 09/07/2007 15:44 #010 P.002 /011 m:(503)620 -2748 ACS Testing Inc. To:Final Letter (15036396345) 17:16 09 /07 /07GMT-55:00 Pg 02-04 60.pI —60266 7409 SW Tech Center Dr. Ste. 145 Tigard, OR 97223 Ph: 503-443 -3799 Fax 503-620-2748 SPECIAL INSPECTION i ECEIVEC FINAL REPORT SEP DATE: September 5, 2007 CITY 01- + swim, PROJECT: Tigard Triangle Building 1 BUOLD tip' D!I /!SInr PERMrT #: BP 2006 00206 ADDRESS: 11850 SW 67 Ave CITY: Tigard STATE: Oregon OFFICE COPY To Whom It May concern: ACS Testing, Inc. attests that their inspectors performed special inspection(s) on a continuous and/or periodic basis as required by the specific jurisdiction and/or IBC. Special inspection(s) were performed for the following: Reinforced Concrete Cast in place anchors Structural Steel (an -site & at fabrication shop) Structural Masonry Fabricated Stairs Based on personal observation, inspection and reports reviewed by me for the above project, 1 attest on behalf of ACS that work was performed to the best of my knowledge, in accordance with approved plans, specifications, and the applicable codes and standards for this jurisdiction. Appro e �— 11 BOB BROWN President RE(IBVED BB /cs sEP 1 r1 %11U/ CITY OF TIGARD BUILDING DIVISION