Report (5) From 09/07/2007 15:44 #010 P.002 /011
m:(503)620 -2748 ACS Testing Inc. To:Final Letter (15036396345) 17:16 09 /07 /07GMT-55:00 Pg 02-04
60.pI —60266
7409 SW Tech Center Dr. Ste. 145
Tigard, OR 97223
Ph: 503-443 -3799 Fax 503-620-2748
SPECIAL INSPECTION i ECEIVEC
FINAL REPORT
SEP
DATE: September 5, 2007 CITY 01- + swim,
PROJECT: Tigard Triangle Building 1 BUOLD tip' D!I /!SInr
PERMrT #: BP 2006 00206
ADDRESS: 11850 SW 67 Ave
CITY: Tigard STATE: Oregon OFFICE COPY
To Whom It May concern:
ACS Testing, Inc. attests that their inspectors performed special inspection(s) on a
continuous and/or periodic basis as required by the specific jurisdiction and/or IBC. Special
inspection(s) were performed for the following:
Reinforced Concrete
Cast in place anchors
Structural Steel (an -site & at fabrication shop)
Structural Masonry
Fabricated Stairs
Based on personal observation, inspection and reports reviewed by me for the above project,
1 attest on behalf of ACS that work was performed to the best of my knowledge, in
accordance with approved plans, specifications, and the applicable codes and standards for
this jurisdiction.
Appro e �— 11
BOB BROWN
President
RE(IBVED
BB /cs sEP 1 r1 %11U/
CITY OF TIGARD
BUILDING DIVISION