Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Permit
CITY OF TIGARD BUILDING PERMIT P COMMUNITY DEVELOPMENT Permit#: BUP2019-00161 T I ARD 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Date Issued: 08/05/2019 Parcel: 1S136DD05300 Jurisdiction: Tigard Site address: 11850 SW 67TH AVE, STE#100 Project: The Partners Group Subdivision: WEST PORTLAND HEIGHTS Lot: 9 Project Description: TI for new tenant: New partitions,doors,interior glazing,and millwork for suites 100 and 225. Contractor: SWINERTON BUILDERS INC Owner: PNWP LLC#2 342 SW SECOND AVE, SUITE 210 PNWP LLC PORTLAND, OR 97204 6600 SW 105TH AVE#175 BEAVERTON, OR 97008 PHONE: 503-224-6888 PHONE: FAX: Specifics: FEES Description Date Amount Type of Use: COM Class of Work: ALT Type of Const: IIIB Permit Fee-Additions,Alterations, 08/05/2019 $11,829.95 Demolition Occupancy Grp: B Occupancy Load: 250 12%State Surcharge-Building 08/05/2019 $1,419.59 Dwelling Units: 0 Plan Review 07/03/2019 $7,689.47 Stories: 0 Height: 0 ft Address Fee 07/03/2019 $50.00 Bedrooms: 0 Bathrooms: 0 DC Provision Review,COM TI-Ping 08/05/2019 $406.00 Value: $2,700,000 Info Process/Archiving-Lg$2.00(over 08/05/2019 $70.00 11x17) Metro Const.Excise Tax 08/05/2019 $3,240.00 Floor Areas: Plan Review-Fire Life Safety 08/05/2019 $4,731.98 Total Area: 0 Accessory Struct: 0 Basement: 0 Carport: 0 Covered Porch: 0 Deck: 0 Garage: 0 Mezzanine: 0 Total $29,436.99 Required: Required Items and Reports(Conditions) Fire Sprinkler: Parapet: Firs.Alarm:_ _-- Protected Corridors:_ _ Smoke Detectors: Manual Pull Stations: Accessible Parking: 0 This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other ap• cable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work 1. s spended for more the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Ce r. Th•s= les:are set forth in OAR 952-001-0010 through OAR 952-001-0090. You may obtain a copy of the rules or direct questions to OUNC by calling 503 r3 '87 or 1.8',0.. A.2 .4. Issued By: \\ ",...-- Permittee Signature: AP % ?c Call 503.639.4175 by 7:00 a.m.for the next available inspection date. This permit card shall be kept in a conspicuous place on the job site until completion of the project. Approved plans are required on the job site at the time of each inspection. • City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT Accessibility: Barrier Removal Improvement Plan Commercial & Multi-Family - Additions or Alterations -11 c'A 1t n 13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503.718.2439 • www.tigard-or.gov REQUIREMENT: OREGON REVISED STATUTE (ORS) 447.241. (1) Every project for renovation,alteration or modification to affected buildings and related facilities shall be made to insure that the path of travel to the altered area and the restroom, telephones and drinking fountains are readily accessible to individuals with disabilities unless such alterations are disproportionate to the overall alterations in terms of cost and scope. (2) Alterations made to the path of travel to an altered area may be deemed disproportionate to the overall alteration when the cost exceeds twenty-five percent(25%). VALUATION: Total of all renovation,alteration or modification being done, excluding painting and wallpapering: [1] $ MULTIPLIER(25%barrier removal requirement): x .25 TOTAL BUDGET FOR BARRIER REMOVAL: [2] $ ELEMENTS: In choosing which accessible elements to provide under this section,priority shall be given to those elements that will provide the greatest access. Elements shall be provided in the following order: (a) Parking $ (b) An accessible entrance: $ (c) An accessible route to the altered area: $ (d) At least one accessible restroom for each sex or a single unisex restroom: $ (e) Accessible telephones: $ (f) Accessible drinking fountains:and, $ (g) When possible,additional accessible elements such as storage and _ . . - - alarms: TOTAL(shall equal line [2] of Valuation Computation): $ I:\Building\Permits\BUP_COM_PermitApp.doc Rev.03/05/2019 City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT Plan Submittal Requirements Commercial & Multi-Family - New, Additions or Alterations r t G n[:D 13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503.718.2439 • www.tigard-or.gov 1. SITE PLAN (3) copies - fully dimensional, drawn to scale and labeled with: A. ❑ map&tax lot# El project name El site address El suite number El zoning El applicant name El phone number B. North arrow. C. Scale (architectural or engineering only). D. Street names. E. Setbacks. F. Parking,including disabled access. G. Finished floor elevations. 2. EROSION CONTROL PLANS AND DETAILS. 3. BUILDING PLANS: See the "Plan Submittal Requirement Matrix" for the number of plans required based on submittal type (no redlines or tape-ons accepted). All details listed below shall be incorporated into the plans: A. Scale (architectural or engineering only). B. Foundation plan. C. Floor plan(s). D. Cross sections. E. Reflective ceiling plan. F. Seismic bracing detail for suspended ceiling. G. Roof plan. H. Exterior elevations. I. Structural calculations,plans, details and specifications. J. Accessibility barrier removal worksheet. K. Deposit- based on valuation of project. I:\Building\Permits\BUP_COM_PermitApp.doc Rev.03/05/2019 City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT ._ . Plan Submittal Requirements Matrix Commercial & Multi-Family - New, Additions or Alterations D 13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503.718.2439 • www.tigard-or.gov ,,, �� 'o � tib ,;��� p�, '���P���, ►; ��,'�. �, � Aso: : N Demolition Permit 2 (site plan is required showing location and square footage of all buildings to be demolished,erosion control plan and tree protection,if applicable) Site Work 3 (must include location of all accessible parking) Plumbing (site utilities) 2 Building 3 Fire Protection System 3 Mechanical 2 Plumbing(building fixtures) 2 Electrical 2 Solar Photovoltaic 2 (Requires check list for prescriptive installation. If not prescriptive installation,engineering is required.) Plan review is dependent upon submittal_ofa completed application nd plans. - After plan review approval, the Plans Examiner will contact the applicant to request additional sets of plans for distribution purposes (for contractor, City of Tigard,Washington County, and Tualatin Valley Fire &Rescue), if applicable. I:\Building\Permits\BUP_COM_PermitApp.doc Rev.03/05/2019 City of Tigard 'l COMMUNITY DEVELOPMENT DEPARTMENT III1 TICARD Building Permit Review — Commercial - No Land Use Building Permit #: ee'e. ltj -6016 l Site Address: 11 S ti/ Cab Atx, Suite/Bldg#: 100 Project Name: 16 Par-INws G a1 (Name of commercial business occupying the space. If vacant,enter Spec Space.) Planning Review } Proposal: T^ r IL 104,3 -1.-LLaell.n3 df- f1I.�..f n,o1 AvrAl esu-- +-cans ti.verS� ;n'��-51a/inn n 141 t rk. Existing Business Activity: V Proposed Business Activity: O( st. 1 Verify site address/suite# exists and active in permit syste . Q River Terrace Neighborhood: El Yes LJ No [ Zoning: T d r ,_ ' rmitted Use: 17Yes C7 No Spec Space LY CLtd Confirm no land use required. Lfd Business License: _/ Exists: El Yes Lid" No,applicant notified to obtain business license Notes: [&M W.Cut(. C4'.(41��,'1't r, A rty S'14 11) OSCar or 1"3 VI hint h,a adult t1"" t` i3 s.iA . _.v �-�, 7 Approved by Planning: )VL2_ CCole--N Date: 7---3-11 Revisions (after Building Submittal only) Reviewer Date Revision 1: ❑ Approved ❑ Not Approved Revision 2: ❑ Approved ❑ Not Approved Revision 3: ❑ Approved El Not Approved Building Permit Submittal Original Submittal Date: 7/'� 1 y iS�e Plans:_.. -______ _ _. _�._.N Building Plans: # Building Permit#: -int 'ding permit#-above. Workflow Routing: 1L�YP anning� K� rtzu 'Pet Coordinator ©:..lding Workflow Sign-off: S gn-off for Planning(include notes from planning review) Route Application Documents: [ gullding: original permit application, site plans,building plans, engineer and beam calculations and trust details,if applicable,etc. Notes: By Permit Technician: _ _ Date: 78 f'/�/, I:\Building\Forms\B1dgPermitRvw COM NoLandUse 060116.docx Permit Coordinator Review ❑ Conditions "Met"prior to issuance of building permit ❑ Approved,NOT Released: Date: Notes: Revisions (after Building Submittal only) Revision Notice 1: Date Sent to Applicant: Revision Notice 2: Date Sent to Applicant: vision Notice 3: Date Sent to Applicant: W/ Ail N/A Fees Entered: Wash Co Trans Dev Tax: 0 Yes CX N/A Tigard Trans SDC: 0 YesC�/ /A Parks SDC: 0 Yes N/A OK to Issue Permit Approvedby Permit Coordinator: Date: 07i I:\BuildineForms\BldgPermitRvw_COM NoLandUse_070915.docx