Loading...
Permit (3) 111 CITY OF TIGARD BUILDING PERMIT COMMUNITY DEVELOPMENT Permit#: BUP2021-00248 Date Issued: 12/20/2021 TIGARD 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Parcel: 2S101 BB01300 Jurisdiction: Tigard Site address: 11958 SW GARDEN PL Project: Zoom+Care Subdivision: CROW PARK 217 Lot: 1 Project Description: TI-Interior partition walls,finishes and new restroom. Contractor: NORWEST CONTRACTORS INC Owner: BKM PARK BC 252 LLC PO BOX 25305 BY SLK GLOBAL SOLUTIONS AMERICA PORTLAND, OR 97298-0305 2727 LBJ FREEWAY STE 806 DALLAS, TX 75234 PHONE: 503-291-6986 PHONE: FAX: 503-291-7036 FEES Specifics: Description Date Amount Type of Use: COM Class of Work: ALT Type of Const: IIIB Permit Fee-Additions,Alterations, 11/08/2021 $729.45 Occupancy Grp: B Occupancy Load: 41 Demolition 12%State Surcharge-Building 11/08/2021 $87.53 Dwelling Units: 0 Plan Review 10/14/2021 $474.14 Stories: 0 Height: 0 ft DC Provision Review,COM TI-Ping 11/08/2021 $110.00 Bedrooms: 0 Bathrooms: 0 Plan Review-Fire Life Safety 11/08/2021 $291.78 Value: $50,000 Info Process/Archiving-Lg$2.00(over 11/08/2021 $28.00 11x17) Floor Areas: Total Area: 0 Accessory Struct: 0 Basement: 0 Carport: 0 Covered Porch: 0 Deck: 0 Garage: 0 Mezzanine: 0 Total $1,720.90 Required: Required Items and Reports(Conditions) Fire Sprinkler: Parapet: Fire Alarm: Protected Corridors: Smoke Detectors: Manual Pull Stations: Accessible Parking: 0 This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR 952-001-0010 through OAR 2-001-0090. Y may obtain py of the rules or direct questions to OUNC by calling 503.232.1987 or 1.800.332.2344. Issued By: Permittee Signature: .. /7/7/ 7V3 Call 503.639.4175 by 7:00 a.m.for the next available inspection date. This permit card shall be kept in a conspicuous place on the job site until completion of the project. Approved plans are required on the job site at the time of each inspection. City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT Accessibility: Barrier Removal Improvement Plan Commercial & Multi-Family - Additions or Alterations TIGARD 13125 SW Hall Blvd. • Tigard, Oregon 97223-• 503.718.2439 • www.tigard-or.gov REQUIREMENT: OREGON REVISED STATUTE (ORS) 447.241. (1) Every project for renovation,alteration or modification to affected buildings and related facilities shall be made to insure that the path of travel to the altered area and the restroom, telephones and drinking fountains are readily accessible to individuals with disabilities unless such alterations are disproportionate to the overall alterations in terms of cost and scope. (2) Alterations made to the path of travel to an altered area may be deemed disproportionate to the overall alteration when the cost exceeds twenty-five percent(25%). VALUATION: Total of all renovation,alteration or modification being done, excluding painting and wallpapering: [1] $ 50,000 MULTIPLIER(25%barrier removal requirement): x .25 TOTAL BUDGET FOR BARRIER REMOVAL: [2] $ 12,500 ELEMENTS: In choosing which accessible elements to provide under this section,priority shall be given to those elements that will provide the greatest access. Elements shall be provided in the following order: (a) Parking $ N/A (b) An accessible entrance: $ N/A (c) An accessible route to the altered area: $ N/A (d) At least one accessible restroom for each sex or a single unisex restroom: $ N/A (e) Accessible telephones: $ N/A (t) Accessible drinking fountains:and, $ N/A (g) When possible,additional accessible elements such as storage and alarms: $ N/A TOTAL(shall equal line [2] of Valuation Computation): $ * * Existing facility is completely accessible. No barrier removal is applicable. I:\Building\Permits\BUP_COM_PermitApp.doc Rev.03/05/2019 City of Tigard COMMUNITY DEVELOPMENT DEPARTMENT C TIGARD Building Permit Review — Commercial - No Land Use Building Permit #: 8UP202/-002L1 Site Address: If t 5'8 SW Ga VI `P[aC' Suite/Bldg#: Project Name: .7-COM-1-651, (Name of commercial business occupying the space. If vacant,enter Spec Space.) Planning Review Proposal: Oil 420t/i/cPiV10I,� . W -GY.Sfi rl '-v- . b l L' Crvl e-- co A 0vt. C • Z(/1.d-e rt.or Jtarot, (S l‘vl��(.�-�5 _(At r s I-v- v-1 Existing Business Activity: pk.C.e_ t ce Proposed Business Activity: � v`f.. .p �lm/�lM rti/l. (vu C e J) ( Verify site address/suite# exists and active in permit system. E River Terrace Nei hborhood: ❑ Yes 21' No Zoning: i G �pl Permitted Use: Yes ❑ No ❑ Spec Space Confirm no land use required. Business License: Exists: ® Yes ❑ No,applicant was provided a business license application Notes: Approved by Planning: .4Date: d O//el f Z Z/ Revisions (after Building Submittal only) Reviewer Date Revision 1: ❑ Approved ❑ Not Approved Revision 2: ❑ Approved ❑ Not Approved Revision 3: ❑ Approved ❑ Not Approved Building Permit Submittal Original Submittal Date: /O/12/2627 Site Plans: # Building Plans: # 3 Building Permit#: Enter building permit#above. Workflow Routing: [Planning [ 1 ermit Coordinator Er Building Workflow Sign-off: C9'Sign-off for Planning(include notes from planning review) Route Application Documents: li Building: original permit application, site plans,building plans,engineer and beam calculations and trust details,if applicable,etc. Notes: By Permit Technician: ] Date: 14/4/24024 1:\Building\Forms\BldgPermitRvw_COM_NoLandUse_l 11819.docx A Permit Coordinator Review Conditions "Met"prior to issuance of building permit ❑ Approved,NOT Released: Date: Notes: Revisions (after Building Submittal only) Revision Notice 1: Date Sent to Applicant: Revision Notice 2: Date Sent to Applicant: Revision Notice 3: Date Sent to Applicant: SDC Fees Entered: Wash Co Trans Dev Tax: ❑ Yes /A Tigard Trans SDC: ❑ Yes /N/A Nl/A Parks SDC: ❑ Yes OK to Issue Permit Approved by Permit Coordinator: Date: ID(p-4 I C-rl2`I � I:\Building\Forms\BldgPermitRvw_COM NoLandUse 111819.docx