City of Tigard Water Advisory Board Agenda
SERVING TIGARD WATER SERVICE AREA
MEETING DATE: Wednesday, April 24, 2024, 5:30 p.m.
MEETING LOCATION: 10 mil Conference Room - PW
Public Dial-in Number for listen-only phone bridge (971) 256-0577
When prompted enter Conference ID 13125
1. Call to Order, Roll Call, and Introductions
2. Tigard Tyler (T2) Update – Utility Billing Communications Plan Rollout
o Guests: Nichole Hendryx, Darren Black & Torri Porter
3. Water Supply Updates – Brian Rager
4. Proposed Water CIP – City Engineer Joe Wisniewski
5. Proposed Water Operations Budget – Brian Rager
6. Approval of Minutes – December 13, 2023, and February 15, 2024
Action: Motion to approve the December 13, 2023, updated minutes.
Action: Motion to approve the February 15, 2024, minutes.
7. Public Comments
Call for comments from the public.
8. Non-Agenda Items
Call for non-agenda items from the board.
WATER ADVISORY BOARD AGENDA – April 24, 2024
City of Tigard | 8777 SW Burnham St., Tigard, OR 97223 | 503-718-2688 | www.tigard-or.gov | Page 2 of 2
The City of Tigard tries to make all reasonable modifications to ensure that people with disabilities have an equal
opportunity to participate in all city meetings.
Upon request, the city will do its best to arrange for the following services/equipment:
Assistive listening devices.
Qualified sign language interpreters.
Qualified bilingual interpreters.
Because the city may need to hire outside service providers or arrange for specialized equipment, those requesting
services/equipment should do so as far in advance as possible, but no later than 3 city workdays prior to the meeting.
To make a request, call 503-718-2591 (voice) or 503-684-2772 (TDD - Telecommunications Devices for the Deaf).
9. Next Meeting
June 12, 2024
Location: 10 mil PW
Time: 5:30 pm
10. Adjournment
Action: Motion for adjournment.
Executive Session
The Water Advisory Board may go into Executive Session. If an Executive Session is called to order, the
appropriate ORS citation will be announced identifying the applicable statute. All discussions are confidential
and those present may disclose nothing from the Session. Representatives of the news media are allowed to
attend Executive Sessions, as provided by ORS 192.660(4), but must not disclose any information discussed.
No Executive Session may be held for the purpose of taking any final action or making any final decision.
Executive Sessions are closed to the public.
Water Advisory Board (WAB) Minutes
SERVING TIGARD WATER SERVICE AREA
Page 1 of 8
MEETING DATE: Wednesday, April 24, 2024, 5:30 p.m.
MEETING LOCATION: 10 mil – Public Works
Members Present:
Commissioner Marie Walkiewicz TWD
Councilor Jeanette Shaw City of Tigard
Commissioner Joshua Drake City of Durham
Commissioner Ken Henschel WAB At-Large Member
Commissioner Michael Brewin WAB At-Large Member
Members Absent: N/A
Members of the Public Present: None
City of Tigard Staff Present:
Brian Rager Public Works Director
Shauna Large WAB Coordinator/Recorder
COT Guests:
Darren Black Utility Billing Supervisor
Torri Porter Management Analyst
Joe Wisniewski City Engineer
1. Call to Order, Roll Call, and Introductions
Commissioner Marie Walkiewicz called the meeting to order at 5:30 p.m.
2. Tigard Tyler (T2) Update – Utility Billing Communications Plan Rollout
Darren Black shared an overview of the Tyler Utility Billing Communication Plan which
consists of four phases. This includes a summary of materials, outreach strategy and
intended goals.
The Tyler project is being framed under the City Council of Modernize and Improve City
Services. There will be common color themes and visual themes to help direct the public to
Tyler communication messaging. There are a lot of people who see these communications,
but never touch utility billing, and the City does not want to give them the sense there is
Water Advisory Board (WAB) Minutes
SERVING TIGARD WATER SERVICE AREA
Page 2 of 8
something they need to be doing right now. In terms of messages there are some key points,
one of which is the goal to get people to eventually switch to on-line billing. The emphasis
will not be on Tyler, at most it will be mentioned that it is powered by Tyler.
Web Content: This phase has already been completed, as of the end of March. The team
created a webpage that will act as the source of truth for any and all information related to
utility billing and Tyler upgrades. The page is up now.
Points of Contact and Communications: The idea is this would be a place where residents
could pay their utility bills manually. There are posters at the mail drop off locations; two
located at City Hall and there will be one in King City. There will be a phone recording set
up stating this change is coming in September. On the utility bill itself there will be a note
letting residents know this September there will be changes to their utility bill, and a message
directing them to the webpage if they have questions. That same note will be written in both
English and Spanish.
Outward Communications: The team is just getting started on this phase. The idea here is
this would be for the residents who pay their bill using the auto-pay option. The team is
putting together a mass email that will go out to anyone that does on-line bill pay. There will
be a tent set up at the farmers’ market to answer any questions. Over the summer the team
hopes to do a newsletter column, social media posts and another email blast.
Education and Training: will happen right around release time and a little bit afterwards. The
city cannot assume that new technology is intuitive so ample resources will be provided for
people to get any questions they have answered. There will be an instructional video up on
the webpage on how to set up accounts. The team is hoping to have a library session for
people who want to come in person and hope to soon have a user guide on the webpage.
Overall timeline essentially runs from March to September. March is phase one and most of
phase two and into April. Next month is phase three mostly rolling out social media posts,
reporting, etc. Over the summer, the team has not quite nailed down the dates for
communications, newsletter, mailer, and social media posts. Around August and September,
they will start pushing the educational content and anything else referenced here.
Mr. Black then talked about how the team will be measuring the success of this project. They
will have a focus group for the big-ticket utility bill payers, the ones who have huge utility
bills, probably business owners. They are also providing QR codes on information posters
and will track how often each QR code gets scanned. Each QR code is unique so they can
Water Advisory Board (WAB) Minutes
SERVING TIGARD WATER SERVICE AREA
Page 3 of 8
tell where each one is being scanned from. Most importantly we are counting views on the
webpage itself. The main goal is to get as many residents as possible to see that webpage.
Mr. Drake stated a lot of people out there do not know the City of Tigard bills for King
City. He asked if there is a way to have on the notice that utility billing covers City of Tigard,
Durham, King City, and the unincorporated area. Torri Porter responded that this made
sense. Mr. Brewin stated that all the other utilities have phone staff working Monday
through Friday. Tigard does not have staff working in Utility Billing on Friday’s and noted
that if a customer had their water turned off, or if they have billing questions, there is no one
available for them to talk to on Fridays. He asked if there is anyway someone at City Hall
can cover these issues on Fridays. Chair Walkiewicz stated that while this is a point to raise,
it is a question that cannot be answered in the WAB meeting. Darren Black mentioned,
besides Public Works the entire city works Monday through Thursday. A decision of that
magnitude would need to be addressed by City Manager, Steve Rymer. Councilor Shaw
stated that Steve Rymer is aware of that situation, and he is working through how they can
accommodate Fridays.
Darren Black mentioned he is available to answer questions regarding billing in Tyler. He is
making sure bills are accurate, making sure each one of the rates are being applied as they
should be and that the bills are matching as they should. Chair Walkiewicz asked if residents
would need to set up a new account. Torri Porter stated they will have to set up a new
account for the new portal, but they will keep the same account number. If they are currently
set up for autopay, they will need to sign up for that again in the new system.
3. Water Supply Updates
Brian Rager briefly went over the February and March supply updates, and noted the report
was typical for this time of year. Councilor Shaw noted that usage has gone up in the last
couple of months, is it showing a possible trend. Mr. Rager stated this could be due to
population growth and less rainfall. Chair Walkiewicz stated that it is too early to label this as
a trend. Mr. Rager stated he would check into this and get back to the WAB with his
findings. Chair Walkiewicz mentioned the WAB might want to go on the tour with the
Clackamas River Water Providers. She found this extremely helpful. Councilor Shaw
suggested that this could be set up to include the entire board. Mr. Rager agreed and will
watch for the opportunity when announced by the Clackamas River Water Providers.
Water Advisory Board (WAB) Minutes
SERVING TIGARD WATER SERVICE AREA
Page 4 of 8
4. Proposed Water CIP
Joe Wisniewski discussed the Capital Improvement Plan budget projects for the next 6 years.
The FY25 outlook for projects shows what he believes can reasonably be accomplished.
Total cost for CIP projects is 280 million dollars, which includes all the projects in the
Water, Parks, Transportation, Facilities, Stormwater and Sanitary Sewer systems. The water
portion of the 6-year CIP is a total of 55.8 million dollars, and of that is a proposed amount
of 20 million dollars in FY25. It is a significant amount of work, but there are some very
large projects underway and coming up in FY25.
Some of the projects to highlight that are underway or funded for next fiscal year is the
completion of Reservoir 18 and Pump Station. This is to help with a lot of the growth in the
Bull Mountain area. The Engineering team is also starting the planning of reservoir 19,
which will serve the lower elevation portions of the southern side of Bull Mountain and the
expansion areas of River Terrace, as well as Kingston Terrace, which is within the King City
urban growth boundary expansion. For FY25, the focus will be to complete a siting and
feasibility study. The land purchase is budgeted, so once an ideal site is found, the purchase
can be made. The team will also watch for any opportunity where they can coordinate with a
land developer for the siting of the reservoir. Mr. Brewin asked if it would be an above
ground tank. Mr. Wisniewski stated the city prefers tanks to be at or below grade, seismic
requirements must be addressed regardless. Mr. Brewin asked instead of purchasing land, is
it feasible to put it in this unused park plan at Roy Rogers. Mr. Wisniewski stated the
elevation there is substantially lower than where the tank would have to be sited. The tanks
must be sited within the pressure zone range that it will serve. This tank will require an
elevation of between 380-410 feet. There is a significant elevation change there. The ideal
elevation band is near Orchard Park and some of the developed area off of 150th and it kind
of follows just behind the Art Rutkin school. The team is looking for approximately 2-5
acres to site the reservoir.
Mr. Wisniewski then talked about system plan addendums. The last water system plan was
adopted in 2020. With all the urban growth boundary expansions the city must complete
addendums to the system plan to address those areas. The addendum for Kingston Terrace
is under way, the King City site. The next addendum will address River Terrace 2.0. That
addendum will show the true needs of the system to serve that area. It will include a
financing plan, the System Development Charges (SDCs), the reservoir sizing, demand on
Water Advisory Board (WAB) Minutes
SERVING TIGARD WATER SERVICE AREA
Page 5 of 8
the treatment plant, and the role that aquifer storage and recovery (ASR) wells might play in
serving the area. The addendum should be complete by the end of FY25.
Mr. Wisniewski next talked about the Water Treatment Plant and the Raw Water Intake
Pump Station (RIPS) Generator project. He referenced the ice storm that took place a few
years ago, where power was lost at both facilities. This project will provide emergency
backup power. Lake Oswego is leading that project; Tigard is a partner through our IGA,
this is basically the funding for our ownership for that project. The ideal solution is a “plug
and play” where a portable generator can be deployed when needed. Lake Oswego is
looking at vendors that would be supplying the generator. Mr. Henschel asked if they have
looked at the PGE program, they have a fleet of 93 generators around the area that can be
deployed. Mr. Brewin asked if the backup is rechargeable, and if so, how is it charged. He
also asked if a solar array could charge it. Mr. Wisniewski stated they are still in design and
penciling out the ideal set up. The generators are mobile so they will likely be diesel-
powered. For the size of generator needed, solar would not be an option.
The next project discussed was the Water System Service Line Inventory, which is a
requirement of the Lead and Copper Rule revisions. The inventory work is almost finished.
If desired, Project Manager Ross Horton can provide a final wrap-up report to the WAB.
Mr. Brewin asked about the Rotary Plaza restroom project and, how many restrooms are
impacted by the project. Mr. Wisniewski stated there is just one restroom behind the coffee
shop. This project will address a problem where the city maintenance crews have to clean
the line multiple times per month. Mr. Brewin asked why the project will cost $360,000. Mr.
Wisniewski explained some details of the project and that it is also expensive to send the
sewer cleaning truck out so frequently to address the issue.
5. Proposed Water Operations Budget
Brian Rager discussed the Public Works water operations budget starting with an overview.
He discussed what the key accomplishments were for FY24 and the key investments and
goals for upcoming FY25. He briefly discussed some division overhead budgets, and big-
ticket items. Councilor Shaw asked if the personal services section included the FTEs for
vacant positions. Mr. Rager confirmed it does. Mr. Brewin asked how much of the total is
for benefits. Mr. Rager stated it is about 30%, which is all calculated by the finance
Department.
Water Advisory Board (WAB) Minutes
SERVING TIGARD WATER SERVICE AREA
Page 6 of 8
Mr. Rager went over water costs, which are based on anticipated usage and what the city will
pay to Lake Oswego. These costs are covered by the water rates.
Professional/Contractual budget costs. This line item is used to pay for consultants. It is also
used to pay for water testing, which is outsourced to another company. The Repair and
Maintenance line item is for water meters and replacement of water meters. Electricity, PGE
continues to raise rates, so we have to keep raising our costs. Mr. Henschel asked what
happen with the fire hydrant replacement every year, it seems to have stopped. Mr. Rager
stated there are some best management practices that are not being met right now, mostly
due to a few vacancies. We are not showing an increase in FTEs currently.
Special department expenses include franchise fee to the city, which every utility pays for
water sales within city limits. This also includes the rebates to King City, Durham, and
Tigard Water District for respective sales in those boundaries.
Indirect charges for overhead budgets. Every division has to pay certain percentages for
other services in the city. Finance is making some adjustments to the algorithm that
calculates these. Councilor Shaw asked Mr. Rager to confirm if the utilities were paying a
disproportionate share of the overhead costs. Mr. Rager confirmed that there were some
issues, one of which was in the Streets Division. There is a whole cost allocation plan that
finance controls which is based on a number of employees in each division. Because some of
the percentages were disproportionate in many divisions, they are working on fixing that.
Mr. Rager stated he was not sure if these were the final numbers or if things could change.
Overall, the indirect charges for water is going down 15%.
6. Approval of Minutes – December 13, 2023, and February 15, 2024
The WAB discussed the amendments for the December 13, 2023, meeting minutes which
include updating Councilor Shaw’s title. Chair Walkiewicz stated the primary changes for
December 13th minutes were to correct the meeting notes showing that Ken Henschel was
not yet an At-Large member (commissioner) of the WAB. Mr. Brewin mentioned #2 needs
to be updated to reflect Ken Henschel was not an At-Large member at that meeting. He also
mentioned #8 the adjournment portion needs to be amended to reflect Ken Henschel was
not an At-Large member at that meeting.
Water Advisory Board (WAB) Minutes
SERVING TIGARD WATER SERVICE AREA
Page 7 of 8
Commissioner Joshua Drake moved to approve the amended December 13, 2023, minutes,
Commissioner Ken Henschel seconded the motion. The motion passed unanimously, with
Commissioners Marie Walkiewicz, Jeanette Shaw, Joshua Drake, Ken Henschel and Michael
Brewin voting yes.
The WAB also discussed the amendments for the February 15, 2024, meeting minutes which
include updating Councilor Shaw’s title. Mr. Brewin mentioned #4 needs to be amended to
reflect the vote for a new chair and vice chair. Mr. Brewin also stated a change is needed
regarding who noted the turbidity in #6. He also stated a change needs to be made in #7
regarding who asked the question regarding the annual water meter inspection.
Commissioner Ken Henschel moved to approve the amended February 15, 2024, minutes,
Commissioner Joshua Drake seconded the motion. The motion passed unanimously, with
Commissioners Marie Walkiewicz, Jeanette Shaw, Joshua Drake, Ken Henschel and Michael
Brewin voting yes.
7. Public Comments
There were no Public Comments.
8. Non-Agenda Items – Review of Future Agenda Topics
Mr. Brewin asked if the backflow topic will be on the agenda for our next meeting. Mr.
Rager stated yes, we will be discussing that topic at the next meeting. Mr. Brewin asked who
the person is that will be handling that. Mr. Rager stated Hung Nguyen and Aaron Beattie
from Water. Councilor Shaw asked if the board received the State of the City invitation
which is happening on May 13, 2024, at Broadway Rose Theater at 6:00 pm. Shauna Large
will forward the email to the WAB group. Chair Walkiewicz asked Ms. Large if she had
created the potential future agenda topics spreadsheet. Ms. Large stated that she would ask
IT to set up a WAB Teams channel, which is where the spreadsheet will be saved. Chair
Walkiewicz stated she would like to see an overview of the Water Conservation Program as a
future agenda item. Chair Walkiewicz also mentioned the need to add the amounts of time
for each topic in the agenda and the meeting shouldn’t be longer than an hour and 15
minutes. Mr. Brewin mentioned the Emergency Management Plan, the water curtailment
plan in conjunction with our partners at Lake Oswego. Mr. Rager stated that the city has
that, and he will bring that to a future meeting. It is referenced as the Water management
Conservation Plan, and it was developed in partnership with Lake Oswego.
Water Advisory Board (WAB) Minutes
SERVING TIGARD WATER SERVICE AREA
Page 8 of 8
9.Next Meeting
June 12, 2024
Location: 10 mil – PW
Time: 5:30 pm
10.Adjournment
At 6:49 p.m., Commissioner Joshua Drake moved to adjourn the meeting, and
Commissioner Ken Henschel seconded the motion. The meeting adjourned by unanimous
vote of the commissioners present, with Commissioners Marie Walkiewicz, Jeanette Shaw,
Ken Henschel, Joshua Drake, and Michael Brewin voting yes.
____________________________ ____________________________
Marie Walkiewicz, WAB Chair Shauna Large, WAB Coordinator/Recorder
Date: _______________________ Date: ________________________ 6/20/20246/21/2024
A summary of materials, outreach strategy, and intended goals
Tyler-Utility Billing
Communication Plan
The 5 E’s –Tigard’s Community Promise: Equity ⚫Environment ⚫Economy ⚫Engagement ⚫Excellence
Table of Contents
•Themes and Messaging
•Phase 1: Web Content
•Phase 2: Points of Contact
•Phase 3: Outbound Comms
•Phase 4: Training & Education
•Project Timeline
•Measuring Engagement
The 5 E’s –Tigard’s Community Promise: Equity ⚫Environment ⚫Economy ⚫Engagement ⚫Excellence
Themes and Messaging
-Modernization of City Services
-Framing the project within this city council goal helps residents understand why we’re doing
this
-Color Theme
-A standardized color theme will be used across Tyler Utility Billing (UB) communications
-Language
-Consideration of unaffected residents who will see these comms, as well as possible
confusion with the unrelated planned rate increases
-Key Messages
-Switch to Online
-Powered by Tyler
The 5 E’s –Tigard’s Community Promise: Equity ⚫Environment ⚫Economy ⚫Engagement ⚫Excellence
Phase 1: Web Content
Tyler UB updates web page
-A City of Tigard web page, updated over time, will act as the source of truth for all Tyler and Tigard UB communications.
-All communications both physical and virtual will direct residents to this page.
-Information will include our partnership with
Tyler, the project itself, expected changes, and more.
The 5 E’s –Tigard’s Community Promise: Equity ⚫Environment ⚫Economy ⚫Engagement ⚫Excellence
Phase 2: Points of Contact
-UB web page and banner
-Along with the previously mentioned web page, a banner feature on portal access page is available
-Bill drop off locations
-Posters (see right) placed at the 3 drop boxes will show a link/QR for the Tyler UB updates page
-Phone
-A recording will greet callers with a friendly reminder of the upcoming changes, and to check the website
-Utility bill note
-A short note is included on every utility bill until release date. The note will be in English and Spanish. See below.
NOTICE: This September, you’ll see some changes to the look of your utility bill
and new features available online. To learn more visit www.tigard -or.gov/ub
The 5 E’s – Tigard’s Community Promise: Equity ⚫ Environment ⚫ Economy ⚫ Engagement ⚫ Excellence
Phase 3: Outward Communications
To fill gaps in customer awareness
-Newsletters
-Social Media Posts
-Print media/Mail
-Educational and promotional videos
-Outreach at events
-Email to online bill payers
The 5 E’s – Tigard’s Community Promise: Equity ⚫ Environment ⚫ Economy ⚫ Engagement ⚫ Excellence
Phase 4: Education & Training
We shouldn't assume the new system will be intuitive for residents
-Instructional video
-Library Sessions
-Website FAQ
-Phone for help
-User Guide for bill
The 5 E’s – Tigard’s Community Promise: Equity ⚫ Environment ⚫ Economy ⚫ Engagement ⚫ Excellence
Timeline
* - Exact schedule for outwards comms is still in progress
The 5 E’s – Tigard’s Community Promise: Equity ⚫ Environment ⚫ Economy ⚫ Engagement ⚫ Excellence
Measuring Engagement
-Focus Groups
-Around go-live we’ll get feedback from high usage UB customers.
-QR code tracking
-Physical comms will have QR codes that will tell us how often residents
view them.
-Web page view tracking
-All customers are pointed to visit this page, primary measure of comms
effectiveness
Questions?
Water Advisory Board Water Supply Update
February 2024 Update
Tigard Usage
Current
(Feb 24)
Prior Yr
(Feb 23)
Avg Daily Use (MGD)4.4 4.28
Avg Temp 53°48°
Peak Use (MGD)4.68 4.58
Peak Temp 63°57°
Tigard Storage
Stored Water (ASR)305.0 344.1
Days of Supply 168.5 192.9
4.4
Average
4.00
0
2
4
6
8
10
Average Daily Demand (ADD)
February Usage
Average daily water use for the month of February was 4.4
million gallons per day (mgd). Peak daily use was 4.68 mgd.
Last year, average daily water use was 4.28 mgd for the same
time period, with a peak day of 4.58 mgd. The average daily
and peak use for February were typical, just above the
historic averages of 4.00 mgd and 4.41 mgd respectively.
4.68Peak 4.41
0
2
4
6
8
10
Peak Daily Demand (PDD)
The chart above shows Tigard's average daily water use and peak use for the current fiscal year (YTD), as well as
two years prior. This usage is compared to the average and peak air temperatures during that time, displayed as
the shaded areas. The bar chart is displaying precipitation in inches (using left axis). The chart is intended to
display the seasonality of water usage and the close relationship with weather patterns.
0
20
40
60
80
100
120
0
2
4
6
8
10
12
14
Jul 2021Aug 2021Sep 2021Oct 2021Nov 2021Dec 2021Jan 2022Feb 2022Mar 2022Apr 2022May 2022Jun 2022Jul 2022Aug 2022Sep 2022Oct 2022Nov 2022Dec 2022Jan 2023Feb 2023Mar 2023Apr 2023May 2023Jun 2023Jul 2023Aug 2023Sep 2023Oct 2023Nov 2023Dec 2023Jan 2024Feb 2024TemperatureMillion Gallons Per Day (MGD)Tigard Water Usage Compared to Air Temperature and Precipitation
Peak Temperature Average Temperature Precipitation (In)Average Daily Use (MGD)Peak Use (MGD)
Water Advisory Board Water Supply Update
Stored Water (ASR)
Lake Oswego-Tigard Water Treatment Plant & Bonita Pump Station
Data Metrics
Current
(Feb 24)
Prior Yr
(Feb 23)
Chlorine Residual 1.18 1.13
Alkalinity 22.44 23.66
pH 7.68 7.82
Temperature 7.69 6.02
0
50
100
150
200
250
0
50
100
150
200
250
300
350
400
Jan
2021
Mar
2021
May
2021
Jul
2021
Sep
2021
Nov
2021
Jan
2022
Mar
2022
May
2022
Jul
2022
Sep
2022
Nov
2022
Jan
2023
Mar
2023
May
2023
Jul
2023
Sep
2023
Nov
2023
Jan
2024 Days of SupplyStored Water (MG)Stored Water (ASR)
ASR #1 ASR #2 Days of Supply
The chart above shows Tigard's current stored water (ASR levels) as well as 12 months of prior histoy.
The storage levels of ASR #1 and ASR #2 are stacked to show total combined stored water. The days
of supply, based on the amount of stored water, is displayed on the right axis and as the gray line.
0
0.5
1
1.5
2
2.5
3
3.5
4
Chlorine Residual (0.2-4.0ppm boundary)Chlorine Residual: 1.18 ppm
Chlorine is a disinfectant used to
protect the public from virus,
bacteria, and other micro-
organisms. The maximum level
for chlorine in drinking water is 4
ppm and the minimum level
required is 0.2 ppm (indicated by
the yellow shaded area in the
chart above). The average
chlorine residual from July 2020
to current is 1.10 ppm.
Definitions:
LOTWTP: Lake Oswego-Tigard Water Treatment Plant
mg/L: millograms per liter, also expressed as ppm
ppm: parts per million, a measurement of the mass of a
chemical per unit volume of water.
cfs: cubic feet per second, measurement of rate of flow
Water Advisory Board Water Supply Update
0
10
20
30
40
50
60
70 Finished Water Alkalinity (ppm)
4
5
6
7
8
9
10
pH (Raw & Finished)
Clackamas River pH Bonita pH Neutral
0
5
10
15
20
25
Water Temperature C (Raw & Finished)
Clackamas River LOTWTP
Alkalinity: 22.44 ppm
Alkalinity is water's capacity
(buffering) to resist acidic
changes in pH or to neutralize
acid. A normal range for
alkalinity in finished drinking
water is 20-200 mg/L (indicated
by the blue shaded area). The
EPA Secondary Drinking Water
Regulations limit alkalinity only
in terms of total dissolved solids
not to exceed 500ppm.
pH: 7.68
pH is a numerical measure of
the acidity or alkalinity (base) of
a solution, measured on a scale
of 0 to 14. Neutral on the scale
is 7 (indicatd by the gray line in
the chart), below 7 is acidic and
above 7 is alkaline. For drinking
water, slighly base chemistry
(alkaline) provides anti-
corrosion properties to protect
water supply plumbing and
reduces the risks associated
with lead solder and copper
plumbing.
Water Temperature: 7.69C
(46F)
While water temperature can
have a major influence on
biological activity and organic
life in bodies of water, there is
not an EPA standard for the
temperature of finished
drinking water.
As you can see in the chart
above, the temperature of the
finished drinking water
fluctuates in tandem with the
temperature of the source water
(Clackamas River).
Water Advisory Board Water Supply Update
USGS Clackamas River Water Data
The following charts contain U.S. Geological Survey data collected from the Clackamas River. The charts on this
page show a comparison of the current month of data to that same month in the prior years, as well as an average
over those years. On the second page, those charts show the historical trends of each metric from January 2014
to current. Turbidity, a metric not yet defined in this report, is the relative clarity of a liquid. It is an optical
characteristic, measuring the amount of light scattered by material in the water, measured in nephelometric
turbidity units (NTU).
6.2
Average
5.7
0.0
1.0
2.0
3.0
4.0
5.0
6.0
7.0
8.0
2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024
Temperature for Current Month
4,691
Average
4,833
0
2,000
4,000
6,000
8,000
10,000
2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024
Flow for Current Month
7.3
Average
7.4
6.6
6.8
7.0
7.2
7.4
7.6
7.8
2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024
pH for Current Month
3.8
Average
3.9
0.0
2.0
4.0
6.0
8.0
10.0
12.0
2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024
Turbidity for Current Month
Water Advisory Board Water Supply Update
0
2
4
6
8
10
12
14
16
18
20
Jan
2014
Jul
2014
Jan
2015
Jul
2015
Jan
2016
Jul
2016
Jan
2017
Jul
2017
Jan
2018
Jul
2018
Jan
2019
Jul
2019
Jan
2020
Jul
2020
Jan
2021
Jul
2021
Jan
2022
Jul
2022
Jan
2023
Jul
2023
Jan
2024
Turbidity of Clackamas River (NTUs)
5.0
5.5
6.0
6.5
7.0
7.5
8.0
8.5
9.0
Jan
2014
Jul
2014
Jan
2015
Jul
2015
Jan
2016
Jul
2016
Jan
2017
Jul
2017
Jan
2018
Jul
2018
Jan
2019
Jul
2019
Jan
2020
Jul
2020
Jan
2021
Jul
2021
Jan
2022
Jul
2022
Jan
2023
Jul
2023
Jan
2024
pH of Clackamas River
0
2,000
4,000
6,000
8,000
10,000
12,000
Jan
2014
Jul
2014
Jan
2015
Jul
2015
Jan
2016
Jul
2016
Jan
2017
Jul
2017
Jan
2018
Jul
2018
Jan
2019
Jul
2019
Jan
2020
Jul
2020
Jan
2021
Jul
2021
Jan
2022
Jul
2022
Jan
2023
Jul
2023
Jan
2024
Discharge (Flow) of Clackamas River (cfs)
0
5
10
15
20
25
Jan
2014
Jul
2014
Jan
2015
Jul
2015
Jan
2016
Jul
2016
Jan
2017
Jul
2017
Jan
2018
Jul
2018
Jan
2019
Jul
2019
Jan
2020
Jul
2020
Jan
2021
Jul
2021
Jan
2022
Jul
2022
Jan
2023
Jul
2023
Jan
2024
Temperature of Clackamas River (c)
Water Advisory Board Water Supply Update
March 2024 Update
Tigard Usage
Current
(Mar 24)
Prior Yr
(Mar 23)
Avg Daily Use (MGD)4.37 4.18
Avg Temp 58°53°
Peak Use (MGD)4.69 4.36
Peak Temp 77°68°
Tigard Storage
Stored Water (ASR)305.0 365.5
Days of Supply 168.5 203.5
4.37
Average
4.04
0
2
4
6
8
10
Average Daily Demand (ADD)
March Usage
Average daily water use for the month of March was 4.37
million gallons per day (mgd). Peak daily use was 4.69 mgd.
Last year, average daily water use was 4.18 mgd for the same
time period, with a peak day of 4.36 mgd. The average daily
and peak use for March were typical, just above the historic
averages of 4.04 mgd and 4.47 mgd respectively.
4.69Peak 4.47
0
2
4
6
8
10
Peak Daily Demand (PDD)
The chart above shows Tigard's average daily water use and peak use for the current fiscal year (YTD), as well as
two years prior. This usage is compared to the average and peak air temperatures during that time, displayed as
the shaded areas. The bar chart is displaying precipitation in inches (using left axis). The chart is intended to
display the seasonality of water usage and the close relationship with weather patterns.
0
20
40
60
80
100
120
0
2
4
6
8
10
12
14
Jul 2021Aug 2021Sep 2021Oct 2021Nov 2021Dec 2021Jan 2022Feb 2022Mar 2022Apr 2022May 2022Jun 2022Jul 2022Aug 2022Sep 2022Oct 2022Nov 2022Dec 2022Jan 2023Feb 2023Mar 2023Apr 2023May 2023Jun 2023Jul 2023Aug 2023Sep 2023Oct 2023Nov 2023Dec 2023Jan 2024Feb 2024Mar 2024TemperatureMillion Gallons Per Day (MGD)Tigard Water Usage Compared to Air Temperature and Precipitation
Peak Temperature Average Temperature Precipitation (In)Average Daily Use (MGD)Peak Use (MGD)
Water Advisory Board Water Supply Update
Stored Water (ASR)
Lake Oswego-Tigard Water Treatment Plant & Bonita Pump Station
Data Metrics
Current
(Mar 24)
Prior Yr
(Mar 23)
Chlorine Residual 1.13 1.07
Alkalinity 22.00 23.26
pH 7.72 7.93
Temperature 8.36 7.11
0
50
100
150
200
250
0
50
100
150
200
250
300
350
400
Jan
2021
Mar
2021
May
2021
Jul
2021
Sep
2021
Nov
2021
Jan
2022
Mar
2022
May
2022
Jul
2022
Sep
2022
Nov
2022
Jan
2023
Mar
2023
May
2023
Jul
2023
Sep
2023
Nov
2023
Jan
2024
Mar
2024 Days of SupplyStored Water (MG)Stored Water (ASR)
ASR #1 ASR #2 Days of Supply
The chart above shows Tigard's current stored water (ASR levels) as well as 12 months of prior histoy.
The storage levels of ASR #1 and ASR #2 are stacked to show total combined stored water. The days
of supply, based on the amount of stored water, is displayed on the right axis and as the gray line.
0
0.5
1
1.5
2
2.5
3
3.5
4
Chlorine Residual (0.2-4.0ppm boundary)Chlorine Residual: 1.13 ppm
Chlorine is a disinfectant used to
protect the public from virus,
bacteria, and other micro-
organisms. The maximum level
for chlorine in drinking water is 4
ppm and the minimum level
required is 0.2 ppm (indicated by
the yellow shaded area in the
chart above). The average
chlorine residual from July 2020
to current is 1.10 ppm.
Definitions:
LOTWTP: Lake Oswego-Tigard Water Treatment Plant
mg/L: millograms per liter, also expressed as ppm
ppm: parts per million, a measurement of the mass of a
chemical per unit volume of water.
cfs: cubic feet per second, measurement of rate of flow
Water Advisory Board Water Supply Update
0
10
20
30
40
50
60
70 Finished Water Alkalinity (ppm)
4
5
6
7
8
9
10
pH (Raw & Finished)
Clackamas River pH Bonita pH Neutral
0
5
10
15
20
25
Water Temperature C (Raw & Finished)
Clackamas River LOTWTP
Alkalinity: 22.0 ppm
Alkalinity is water's capacity
(buffering) to resist acidic
changes in pH or to neutralize
acid. A normal range for
alkalinity in finished drinking
water is 20-200 mg/L (indicated
by the blue shaded area). The
EPA Secondary Drinking Water
Regulations limit alkalinity only
in terms of total dissolved solids
not to exceed 500ppm.
pH: 7.72
pH is a numerical measure of
the acidity or alkalinity (base) of
a solution, measured on a scale
of 0 to 14. Neutral on the scale
is 7 (indicatd by the gray line in
the chart), below 7 is acidic and
above 7 is alkaline. For drinking
water, slighly base chemistry
(alkaline) provides anti-
corrosion properties to protect
water supply plumbing and
reduces the risks associated
with lead solder and copper
plumbing.
Water Temperature: 8.36C
(47F)
While water temperature can
have a major influence on
biological activity and organic
life in bodies of water, there is
not an EPA standard for the
temperature of finished
drinking water.
As you can see in the chart
above, the temperature of the
finished drinking water
fluctuates in tandem with the
temperature of the source water
(Clackamas River).
Water Advisory Board Water Supply Update
USGS Clackamas River Water Data
The following charts contain U.S. Geological Survey data collected from the Clackamas River. The charts on this
page show a comparison of the current month of data to that same month in the prior years, as well as an average
over those years. On the second page, those charts show the historical trends of each metric from January 2014
to current. Turbidity, a metric not yet defined in this report, is the relative clarity of a liquid. It is an optical
characteristic, measuring the amount of light scattered by material in the water, measured in nephelometric
turbidity units (NTU).
6.9
Average
6.8
0.0
2.0
4.0
6.0
8.0
10.0
2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024
Temperature for Current Month
4,893
Average
5,073
0
2,000
4,000
6,000
8,000
10,000
12,000
2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024
Flow for Current Month
7.5
Average
7.5
6.8
7.0
7.2
7.4
7.6
7.8
8.0
2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024
pH for Current Month
3.0
Average
4.1
0.0
2.0
4.0
6.0
8.0
10.0
2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024
Turbidity for Current Month
Water Advisory Board Water Supply Update
0
2
4
6
8
10
12
14
16
18
20
Jan
2014
Jul
2014
Jan
2015
Jul
2015
Jan
2016
Jul
2016
Jan
2017
Jul
2017
Jan
2018
Jul
2018
Jan
2019
Jul
2019
Jan
2020
Jul
2020
Jan
2021
Jul
2021
Jan
2022
Jul
2022
Jan
2023
Jul
2023
Jan
2024
Turbidity of Clackamas River (NTUs)
5.0
5.5
6.0
6.5
7.0
7.5
8.0
8.5
9.0
Jan
2014
Jul
2014
Jan
2015
Jul
2015
Jan
2016
Jul
2016
Jan
2017
Jul
2017
Jan
2018
Jul
2018
Jan
2019
Jul
2019
Jan
2020
Jul
2020
Jan
2021
Jul
2021
Jan
2022
Jul
2022
Jan
2023
Jul
2023
Jan
2024
pH of Clackamas River
0
2,000
4,000
6,000
8,000
10,000
12,000
Jan
2014
Jul
2014
Jan
2015
Jul
2015
Jan
2016
Jul
2016
Jan
2017
Jul
2017
Jan
2018
Jul
2018
Jan
2019
Jul
2019
Jan
2020
Jul
2020
Jan
2021
Jul
2021
Jan
2022
Jul
2022
Jan
2023
Jul
2023
Jan
2024
Discharge (Flow) of Clackamas River (cfs)
0
5
10
15
20
25
Jan
2014
Jul
2014
Jan
2015
Jul
2015
Jan
2016
Jul
2016
Jan
2017
Jul
2017
Jan
2018
Jul
2018
Jan
2019
Jul
2019
Jan
2020
Jul
2020
Jan
2021
Jul
2021
Jan
2022
Jul
2022
Jan
2023
Jul
2023
Jan
2024
Temperature of Clackamas River (c)
FY 2024-2025
P R O P O S E DBUDGET
Page 151CITY OF TIGARD • PROPOSED BUDGET FY 2024 2025
PUBLIC WORKS
Overview
The Water division works hard to ensure that reliable and high-quality drinking water flows 24/7, 365 days a year.
This service is delivered to customers thanks to hundreds of miles of pipe, thousands of watts of electricity, and a
dedicated team of professionals working around the clock. A key part of this service delivery involves proper operations,
maintenance, and rehabilitation of the water system as needed.
The Tigard Water Service Area includes the cities of Durham, King City, two-thirds of Tigard, and the unincorporated
areas to the south and west of Tigard. The service area has over 20,000 service connections supplying approximately
62,500 customers.
Division activities include 24/7 emergency response; water line, hydrant, and meter maintenance and installation;
water treatment; water quality; backflow; and water conservation. The division provides water that meets or exceeds
all Environmental Protection Agency and State of Oregon standards for water quality. The Water division holds to these
standards under normal, peak, and emergency situations.
Key Accomplishments in Fiscal Year 2024
• Continued to protect community health and safety by meeting our key performance indicators:
{100% compliance with drinking water standards.
{Zero boil water notices.
{365 days of adequate pressure for fire flow.
• Continued to implement several money-saving measures:
{Expanding the use of new technology that uses acoustic sensors to “listen” for water leaks, and new water
meters that are fitted with a radio device that can transmit readings and data remotely.
{Data from each meter is downloaded as teammates drive through the city.
{Provided uninterrupted water service regardless of outside pressures.
{Continue cooperation with our regional partners, City of Lake Oswego and the Lake Oswego Tigard Water
Partnership, to ensure the e ectiveness of our emergency plans.
Key Investments and Goals for Fiscal Year 2025
• Continue to development a full Pipe Renewal and Replacement Program.
• Grow the leak detection program with modern technological advancements.
• Provide support to the Capital Improvement Plan projects.
• Complete installation of Advanced Meter Infrastructure.
• Work on Aquifer Storage and Recovery improvements.
• Continue expansion of asset management to build, maintain and operate the City’s infrastructure with targeted
resource allocation and in an e cient, data driven way.
WATER
CITY OF TIGARD • PROPOSED BUDGET FY 2024 2025 Page 152
PUBLIC WORKS
WATER BUDGET UNIT: 6500
FY 2022 FY 2023 2024 2025 2025
Actual Actual Revised Budget Resource Summary Proposed vs FY 24
13.80 13.80 13.80 Total FTE 14.00
1,108,623 1,130,422 1,630,535
Total Personnel Services - Salary &
Benefits 1,784,843 9.46%
778 903 2,500 53001 - Office Supplies 1,250 -50.00%
15,673 31,520 50,000 53002 - Small Tools & Equipment 38,850 -22.30%
24,326 24,528 30,000 53003 - Fuel 30,000 0.00%
429 823 0 53006 - Technology Equipment 0 0.00%
1,787,040 1,892,114 2,260,000 53530 - Water Costs: L.O. & Ptld 2,260,000 0.00%
1,828,246 1,949,888 2,342,500 Total Supplies 2,330,100 -0.53%
274,431 555,829 372,000 54001 - Professional/Contractual 370,166 -0.49%
44,313 31,343 50,000 54002 - Water Costs: Sampling 55,000 10.00%
63 25,030 30,000 54003 - Legal Fees 0 -100.00%
4,435 18,978 25,000 54006 - Software Licensing 35,600 42.40%
2,893 7,021 10,000 54101 - R & M - Facilities 10,000 0.00%
21,904 -418,787 40,000 54102 - R & M - Water Lines 40,000 0.00%
31,075 32,246 30,000 54103 - R & M - Control Valves 30,000 0.00%
16,154 22,030 15,000 54104 - R & M - Reservoir 20,000 33.33%
6,083 110 15,000 54105 - R & M - Grounds 10,000 -33.33%
24,151 47,313 45,000 54106 - R & M - Pump Station 40,000 -11.11%
15,336 4,485 20,000 54107 - R & M - SCADA 20,000 0.00%
11,094 3,262 15,000 54108 - R & M - Wells 15,000 0.00%
166,191 306,372 225,000 54109 - R & M - Meters 225,000 0.00%
61,192 32,592 40,000 54110 - R & M - Service Lines 40,000 0.00%
145 0 0 54111 - R & M - Regulators 0 0.00%
47,592 136,156 160,000 54112 - R & M - Fire Hydrant 160,000 0.00%
64,823 97,038 70,000 54113 - R & M - Vehicles 75,000 7.14%
50 196 0 54114 - R & M - Office Equipment 0 0.00%
384,620 397,019 454,550 54201 - Utilities - Electric 517,310 13.81%
19,364 24,537 26,000 54202 - Utilities - Water/Sewer/SWM 26,000 0.00%
13,824 14,872 22,280 54205 - Utilities - Phone/Pager/Cells 25,160 12.93%
25,298 9,867 55,000 54300 - Advertising & Publicity 53,000 -3.64%
3,100 17,791 5,250 54301 - Fees and Charges 5,250 0.00%
1,793 2,589 15,000 54302 - Dues & Subscriptions 15,000 0.00%
9,517 7,230 20,000 54303 - Professional Development 32,000 60.00%
500 1,553 10,000 54305 - Conservation Expenses 10,000 0.00%
0 0 1,000 54306 - Credit Card Fees 1,000 0.00%
0 0 15,000 54308 - Property Damage 15,000 0.00%
18 0 10,000 54309 - Rents and Leases 5,000 -50.00%
-100 -16 5,000 54310 - Bad Debt Expense 5,000 0.00%
1,248,626 960,966 1,347,824 54311 - Special Dept Expenses 1,438,350 6.72%
16,035 40,000 20,000 54402 - Contributions to Community 20,000 0.00%
2,514,520 2,377,622 3,168,904 Total Services 3,313,836 4.57%
Page 153CITY OF TIGARD • PROPOSED BUDGET FY 2024 2025
PUBLIC WORKS
WATER BUDGET UNIT: 6500 CONTINUED
FY 2022 FY 2023 2024 2025 2025
Actual Actual Revised Budget Resource Summary Proposed vs FY 24
106,860 165,175 0 56003 - Vehicles 0 0.00%
1,120 0 0 56004 - Hardware/Software 0 0.00%
34,361 41,699 40,000 56006 - Equipment 0 0.00%
142,341 206,874 40,000 Total Capital Improvement 0 0.00%
81,385 151,977 103,676 58100 - Ind. Chrg. - City Mgmt 72,698 -29.88%
68,623 42,405 48,669 58110 - Ind. Chrg. - HR 75,666 55.47%
88,056 180,531 216,885 58120 - Ind. Chrg. - Risk Mgmt 431,299 98.86%
40,875 36,576 38,450 58130 - Ind. Chrg. - Design & Comm 40,280 4.76%
33,744 23,551 32,862 58150 - Ind. Chrg. - Records 21,419 -34.82%
20,271 19,058 16,569 58160 - Ind. Chrg. - City Attorney 15,614 -5.76%
0 0 19,138 58170 - Ind. Chrg. - DEIB 11,416 -40.35%
49,670 63,491 76,347 58200 - Ind. Chrg. - Finance Admin 206,165 170.04%
168,402 90,412 147,276 58210 - Ind. Chrg. - Finance Ops 213,795 45.17%
1,248,900 1,200,316 1,260,841 58220 - Ind. Chrg. - Utility Billing 1,270,565 0.77%
625,689 756,418 854,932 58230 - Ind. Chrg. - Technology 237,848 -72.18%
0 118,817 143,875 58231 - Ind. Chrg. - IT Replacement 57,909 -59.75%
28,437 34,351 20,145 58250 - Ind. Chrg. - Contracts & Purch 36,478 81.08%
767,392 840,962 690,163 58600 - Ind. Chrg. - PW Admin 776,490 12.51%
321,568 263,503 435,918 58625 - Ind. Chrg. - PW Eng 0 -100.00%
41,985 25,056 24,836 58630 - Ind. Chrg. - Fleet Maintenance 25,754 3.70%
0 58,157 323,801 58631 - Ind. Chrg. - Fleet Replmnt 283,558 -12.43%
75,031 91,145 67,052 58640 - Ind. Chrg. - Facilities 66,921 -0.20%
0 0 40,874 58641 - Ind. Chrg. - Facilities Repl 27,672 -32.30%
3,660,028 3,996,726 4,562,309 Total Internal Services 3,871,547 -15.14%
9,253,758 9,661,532 11,744,248 Total Water 11,300,326 -3.78%
Page 183CITY OF TIGARD • PROPOSED BUDGET FY 2024 2025
Development of the Capital Improvement Plan (CIP) typically occurs over the first two quarters of each fiscal year as input
to the annual city budgeting process. Lists of potential projects are informed by systems plans, Council and community
feedback, sta -identified needs, as well as from prior CIPs where projects lacked su cient funds.
Priority projects align with Strategic Plan goals, solve existing system operations and maintenance issues, create needed
infrastructure to serve existing or new customer demand, and provide reliable, sustainable systems.
Prioritization of potential projects occurs as follows:
1. Sta and subject matter experts evaluate potential projects
2. Advisory Committees review confirmed projects
3. Community feedback is received during Budget Committee hearings prior to CIP recommendation to City Council for
final budget adoption
All projects shown in the city’s six-year CIP represent high priorities, where funding is or likely will be available, and
where sta project management and delivery capacity is expected. Funding sources include city fees, taxes and charges,
as well as grants and other partner organization contributions. Funding availability assumptions are based on projected
revenues and rates, and the known or anticipated likelihood of acquiring outside grants and contributions. Projects listed
early in the six-year CIP, in fiscal year 2025 in this case, have the most secure funding, while projects in out-years have
less funding assurance; lists for these out-years may be revised in future CIPs based on best available information.
Grants and partnerships are important to funding and delivering city infrastructure. Resources provided through these
programs allow the city to address high-priority needs that they are unable to fund on their own. Unfunded and prioritized
projects may be selected for future grant or partnership opportunities.
The following pages show the CIP by system. Unfunded projects, shown at the end of each system table, are listed in
priority order. Project ranking, informed by strategic priorities such as safety, equity, opportunity, and funding available,
factor into project selection. The Projected Cost column is an estimate and will be updated as resources become
available.
CAPITAL IMPROVEMENT PLAN
PRIORITIZATION &
DEVELOPMENT
CITY OF TIGARD • PROPOSED BUDGET FY 2024 2025 Page 184
PRIORITIZATION & DEVELOPMENT OF THE CAPTIAL IMPROVEMENT PLAN
PRIORITIZATION & DEVELOPMENT
OF THE CAPTIAL IMPROVEMENT PLAN An updated Water System Plan was completed and adopted in fiscal year 2021. The funded projects in the following table
represent priorities as defined by the System Plan and informed by Council and community vision.
WATER PROJECTS
Project Number Project Name Funding Source Total Project Cost
96030 560-East Pressure Zone Consolidation
Project (Formerly Bull Mountain Pipeline)Water, Water SDC 16,975,000
96040 Reservoir 18 and Pump Station Water, Water SDC 33,993,000
96046 Red Rock Creek Waterline Relocation Water 1,192,000
96053 Aquifer Storage & Recovery Well #2 and
Well #3 Water, Water SDC 10,770,000
96058 Pipeline Renewal and Replacement Program
(PRRP)Water Program
96059 Water System Major Maintenance Program Water Program
96060 Generator Replacement at Pump Station 1 Water 1,243,000
96062 Water System Plan Addendums Water SDC 245,000
96063 Pressure Zone Consolidation – Zones 560C
and D Water 710,000
96064 Reservoir 8-1 Structural Improvements Water 2,420,000
96065 Water Meter Modernization Water 15,200,000
96066 Water Treatment Plant & RIPS Generator Water, Lake Oswego 5,500,000
96067 Water System Service Line Inventory Water 195,000
96069 Pump Station 8 Rebuild Water 5,425,000
96070 ASR Expansion Feasibility Study Water 1,360,000
96071 Water Management and Conservation Plan Water 125,000
96072 Water System Plan Water 780,000
96075 Lake Oswego/Tigard Water Supply
Extension Water, Lake Oswego 8,500,000
96076 Reservoir 19 Water SDC 30,000,000
96077 2027 Water System Plan SDC Analysis Water SDC 150,000
96008 Water Main Line Oversizing Program Water SDC Program
96050 Fonner Street/121st Avenue Valve and
Piping Improvements Water, Water SDC 1,211,000
96057 Abandon Reservoirs 9-1 and 9-2 and Pump
Station 11 Water 288,000
Page 185CITY OF TIGARD • PROPOSED BUDGET FY 2024 2025
PRIORITIZATION & DEVELOPMENT OF THE CAPTIAL IMPROVEMENT PLAN
Potential Funding
Source(s)Projected Cost
Water, Water SDC 703,000
Water, Water SDC 662,000
Water, Water SDC 3,988,000
Water, Water SDC 1,525,000
Water, Water SDC 192,000
Water 110,000
Water 540,000
Water 250,00096074 - Isolate Reservoir 4
Unfunded Projects
Pressure Zone Consolidation – Zones 560D and E
Pressure Zone Consolidation – Zones 560F and G
Pressure Zone Consolidation – Zones 560F and 530
Pressure Zone Consolidation – Zones 560G and H
Pressure Zone Consolidation – Zones 560H and A
96068 - Isolate Reservoir 2
96073 - Isolate Reservoirs 1-1 and 1-2
Priorities for budgeted projects were based upon sta recommendations as well as those from the Sanitary Sewer Plan
and the Stormwater System Plan. In addition to the projects listed below, the list of Stormwater projects include several
stream stabilization and restoration projects that will help protect exposed and vulnerable Sanitary Sewer lines and
therefore, funding will come from both Sanitary Sewer and Stormwater funds.
SANITARY SEWER PROJECTS
Project Number Project Name Funding Source Total Project Cost
93003 Sanitary Sewer Major Maintenance Program Sanitary Sewer Program
93060 Sanitary Sewer System Plan Update Sanitary Sewer 200,000
93061 Cured-In-Place Pipe (CIPP) Project Sanitary Sewer,
Stormwater 1,100,000
93062 Leron/Tigard Trunk Sewer Replacement Sanitary Sewer 1,355,000
93063 Bonita Trunk Line Sanitary Sewer, Clean
Water Services 3,000,000
93064 Rotary Plaza Restroom Sanitary Sewer 360,000
Potential Funding
Source(s)Projected Cost
Sanitary Sewer Program
Sanitary Sewer Program
Unfunded Projects
Sewer Rehabilitation Program
Citywide Sanitary Sewer Extension Program
Page 201CITY OF TIGARD • PROPOSED BUDGET FY 2024 2025
WATER
CAPITAL IMPROVEMENT PLAN
WATER CIP PROJECT LOCATIONS
N
CITY OF TIGARD • PROPOSED BUDGET FY 2024 2025 Page 202
WATER CAPITAL IMPROVEMENT PLAN
Project
No.Project Name Actual
through 2023
Projected
2024 2025 2026 2027 2028 2029 2030 Project Total
96030 560-East Pressure Zone
Consolidation Project
(Formerly Bull Mountain
Water Pipeline)
0 100,000 1,775,000 6,000,000 9,100,000 0 0 0 16,975,000
96040 Reservoir 18 and Pump
Station
6,939,000 20,700,000 6,350,000 0 0 0 0 0 33,989,000
96046 Red Rock Creek Waterline
Relocation
467,000 10,000 170,000 545,000 0 0 0 0 1,192,000
96053 Aquifer Storage and
Recovery Well #2 and
Well #3
3,615,000 3,980,000 3,175,000 0 0 0 0 0 10,770,000
96058 Pipeline Renewal and
Replacement Program
(PRRP)
0 940,000 4,880,000 4,965,000 6,225,000 6,225,000 6,725,000 6,725,000 36,685,000
96059 Water System Major
Maintenance Program
0 150,000 180,000 230,000 230,000 280,000 280,000 330,000 1,680,000
96060 Generator Replacement at
Pump Station 1
143,000 135,000 665,000 300,000 0 0 0 0 1,243,000
96062 Water System Plan
Addendums
28,000 60,000 122,000 35,000 0 0 0 0 245,000
96063 Pressure Zone
Consolidation - Zones
560C and D
0 0 0 150,000 560,000 0 0 0 710,000
96064 Reservoir 8-1 Structural
Improvements
0 0 785,000 1,635,000 0 0 0 0 2,420,000
96065 Water Meter
Modernization
0 140,000 310,000 105,000 105,000 7,340,000 7,200,000 0 15,200,000
96066 Water Treatment Plant &
RIPS Generator
0 660,000 1,610,000 700,000 0 0 0 0 2,970,000
96067 Water System Service Line
Inventory
0 90,000 105,000 0 0 0 0 0 195,000
96069 Pump Station 8 Rebuild 0 0 0 1,155,000 4,270,000 0 0 0 5,425,000
96070 ASR Expansion Feasibility
Study
0 0 275,000 0 0 0 1,085,000 0 1,360,000
96071 Water Management and
Conservation Plan
0 0 0 125,000 0 0 0 0 125,000
96072 Water System Plan 0 0 0 0 780,000 0 0 0 780,000
96075 Lake Oswego / Tigard
Water Supply Expansion
0 0 0 1,095,000 7,280,000 0 0 0 8,375,000
96076 Reservoir 19 0 115,000 150,000 3,050,000 0 0 0 0 3,315,000
96077 2027 Water System Plan
SDC Analysis
0 0 0 0 0 150,000 0 0 150,000
Total Funded 11,192,000 27,080,000 20,552,000 20,090,000 28,550,000 13,995,000 15,290,000 7,055,000 143,804,000
Page 203CITY OF TIGARD • PROPOSED BUDGET FY 2024 2025
WATER CAPITAL IMPROVEMENT PLAN
Total Project Cost:
Actual
through
2023
Projected
2024 2025 2026 2027 2028 2029 2030
Project
Total
EXPENSES
Internal Expenses
Project Management 0 20,000 125,000 100,000 100,000 0 0 0 345,000
Total Internal 0 20,000 125,000 100,000 100,000 0 0 0 345,000
External Expenses
Design and Engineering 0 50,000 1,150,000 1,000,000 400,000 0 0 0 2,600,000
Construction 0 0 0 3,200,000 6,000,000 0 0 0 9,200,000
Contingency 0 30,000 500,000 1,700,000 2,600,000 0 0 0 4,830,000
Total External 0 80,000 1,650,000 5,900,000 9,000,000 0 0 0 16,630,000
Total Project Expense 0 100,000 1,775,000 6,000,000 9,100,000 0 0 0 16,975,000
REVENUES
Revenue Funding Source
530 - Water Fund 0 65,000 1,155,000 3,900,000 5,915,000 0 0 0 11,035,000
531 - Water SDC Fund 0 35,000 620,000 2,100,000 3,185,000 0 0 0 5,940,000
Total Revenue Funding 0 100,000 1,775,000 6,000,000 9,100,000 0 0 0 16,975,000
Total Revenues 0 100,000 1,775,000 6,000,000 9,100,000 0 0 0 16,975,000
96030 - 560-East Pressure Zone Consolidation Project (Formerly Bull Mountain Water Pipeline)
Project Need: Due to topographic limitations of Bull Mountain and varying times of past development, the 560-foot
pressure zone (PZ) is comprised of eight independent subzones around Bull Mountain: 560A-H. A 640-foot PZ also
serves customers on the west side of Bull Mountain. With the exception of the 560G subzone, water is supplied to the
640-foot PZ and 560-foot subzones from the upper pressure zone (713-foot PZ) via pressure reducing valves (PRVs).
The PRVs require regular maintenance and specialized training in order to operate them. Therefore, the 2020 Water
System Plan (WSP) recommended consolidating these subzones as much as possible. Additionally, the 2020 WSP also
identified a firefighting water deficiency in the 530-foot PZ and poor condition of Reservoirs 1-1 and 1-2.
Project Description: To improve water system operation and resiliency, portions of pressure zones will be
consolidated into a new 560-East Pressure Zone. Work will include installation of new piping on Bull Mountain Road
and across SW Pacific Highway to connect the different pressure zones. The project will also abandon Pump Station 1,
prepare a site plan for replacement of Reservoirs 1-1 and 1-2, and isolate obsolete equipment at Water Site 2.
Operations and Maintenance Impact: Minor increase in operations costs for new water line.
Prioritization: System Enhancement or Regulatory Requirement
$16,975,000
CITY OF TIGARD • PROPOSED BUDGET FY 2024 2025 Page 204
WATER CAPITAL IMPROVEMENT PLAN
Total Project Cost:
Actual
through
2023
Projected
2024 2025 2026 2027 2028 2029 2030
Project
Total
EXPENSES
Internal Expenses
Project Management 442,000 200,000 100,000 0 0 0 0 0 742,000
Total Internal 442,000 200,000 100,000 0 0 0 0 0 742,000
External Expenses
Design and Engineering 3,223,000 500,000 1,000,000 0 0 0 0 0 4,723,000
Construction 3,274,000 20,000,000 4,225,000 0 0 0 0 0 27,499,000
Environmental Compliance 0 0 25,000 0 0 0 0 0 25,000
Contingency 0 0 1,000,000 0 0 0 0 0 1,000,000
Total External 6,497,000 20,500,000 6,250,000 0 0 0 0 0 33,247,000
Total Project Expense 6,939,000 20,700,000 6,350,000 0 0 0 0 0 33,989,000
REVENUES
Revenue Funding Source
530 - Water Fund 5,540,000 16,146,000 703,000 0 0 0 0 0 22,389,000
531 - Water SDC Fund 1,399,000 4,554,000 5,647,000 0 0 0 0 0 11,600,000
Total Revenue Funding 6,939,000 20,700,000 6,350,000 0 0 0 0 0 33,989,000
Total Revenues 6,939,000 20,700,000 6,350,000 0 0 0 0 0 33,989,000
$33,989,000
96040 - Reservoir 18 and Pump Station
Project Need: System improvements are required to address storage and pumping deficiencies identified in the River
Terrace Water System Plan Addendum that was completed in conjunction with the planning for the development of
River Terrace 1.0.
Project Description: The project is for the design of a new water reservoir, associated new water lines, and
replacement of a temporary pump station for the city's 560-foot service area. The reservoir will be constructed on city-
owned Sunrise Park on the west side of Bull Mountain. A new permanent pump station will replace an existing
temporary pump station on the Reservoir 13 site to move water from the 410-foot to both the 560- and 713-foot
service areas. The project will provide additional storage and pumping facilities to address system deficiencies and
development demand in River Terrace.
Operations and Maintenance Impact: Significant increase in operation and maintenance for new reservoir and pump
station.
Prioritization: System Enhancement or Regulatory Requirement
Page 205CITY OF TIGARD • PROPOSED BUDGET FY 2024 2025
WATER CAPITAL IMPROVEMENT PLAN
Total Project Cost:
Actual
through
2023
Projected
2024 2025 2026 2027 2028 2029 2030
Project
Total
EXPENSES
Internal Expenses
Project Management 168,000 10,000 20,000 25,000 0 0 0 0 223,000
Total Internal 168,000 10,000 20,000 25,000 0 0 0 0 223,000
External Expenses
Design and Engineering 142,000 0 100,000 20,000 0 0 0 0 262,000
Construction 157,000 0 0 350,000 0 0 0 0 507,000
Contingency 0 0 50,000 150,000 0 0 0 0 200,000
Total External 299,000 0 150,000 520,000 0 0 0 0 969,000
Total Project Expense 467,000 10,000 170,000 545,000 0 0 0 0 1,192,000
REVENUES
Revenue Funding Source
530 - Water Fund 467,000 10,000 170,000 545,000 0 0 0 0 1,192,000
Total Revenue Funding 467,000 10,000 170,000 545,000 0 0 0 0 1,192,000
Total Revenues 467,000 10,000 170,000 545,000 0 0 0 0 1,192,000
$1,192,000
96046 - Red Rock Creek Waterline Relocation
Project Need: This project will be constructed after the Wall Street / Tech Center Drive connection project and will
provide domestic and fire services to properties served by the existing waterline currently located in Red Rock Creek.
Project Description: Abandon the existing 12-inch waterline running parallel to Red Rock Creek in place and connect
the dead-end waterlines in Wall Street and Tech Center Drive to create a system loop. In doing so, this will delete a
waterline railroad crossing.
Operations and Maintenance Impact: None.
Prioritization: System Enhancement or Regulatory Requirement
CITY OF TIGARD • PROPOSED BUDGET FY 2024 2025 Page 206
WATER CAPITAL IMPROVEMENT PLAN
Total Project Cost:
Actual
through
2023
Projected
2024 2025 2026 2027 2028 2029 2030
Project
Total
EXPENSES
Internal Expenses
Project Management 241,000 100,000 75,000 0 0 0 0 0 416,000
Total Internal 241,000 100,000 75,000 0 0 0 0 0 416,000
External Expenses
Design and Engineering 1,184,000 130,000 100,000 0 0 0 0 0 1,414,000
Construction 2,190,000 3,750,000 2,500,000 0 0 0 0 0 8,440,000
Contingency 0 0 500,000 0 0 0 0 0 500,000
Total External 3,374,000 3,880,000 3,100,000 0 0 0 0 0 10,354,000
Total Project Expense 3,615,000 3,980,000 3,175,000 0 0 0 0 0 10,770,000
REVENUES
Revenue Funding Source
530 - Water Fund 1,085,000 1,194,000 953,000 0 0 0 0 0 3,232,000
531 - Water SDC Fund 2,530,000 2,786,000 2,222,000 0 0 0 0 0 7,538,000
Total Revenue Funding 3,615,000 3,980,000 3,175,000 0 0 0 0 0 10,770,000
Total Revenues 3,615,000 3,980,000 3,175,000 0 0 0 0 0 10,770,000
$10,770,000
96053 - Aquifer Storage and Recovery Well #2 and Well #3
Project Need: The Water System Plan has identified the need to expand the city’s Aquifer Storage and Recovery
program to meet its long-term water demands.
Project Description: The city’s Aquifer Storage and Recovery (ASR) program began in 2001 with the drilling of ASR 1.
In 2006, the city completed the construction of the ASR 2 facility and in 2007 the city drilled and tested ASR 3. This
project has three phases: (1) construction of new facilities to make ASR Well 3 operational; (2) replacement of electrical
devices with easier-to-maintain components in existing ASR 2 facilities; and (3) connection of two pressure zones to
improve storage and distribution from ASR 3.
Operations and Maintenance Impact: Operations staff will be able to manage summer peak demands more
efficiently in the future.
Prioritization: System Enhancement or Regulatory Requirement
Page 207CITY OF TIGARD • PROPOSED BUDGET FY 2024 2025
WATER CAPITAL IMPROVEMENT PLAN
Actual
through
2023
Projected
2024 2025 2026 2027 2028 2029 2030
Project
Total
EXPENSES
Internal Expenses
Project Management 0 100,000 100,000 100,000 100,000 100,000 100,000 100,000 700,000
Total Internal 0 100,000 100,000 100,000 100,000 100,000 100,000 100,000 700,000
External Expenses
Design and Engineering 0 550,000 800,000 945,000 1,125,000 1,125,000 1,125,000 1,125,000 6,795,000
Construction 0 290,000 3,980,000 3,920,000 5,000,000 5,000,000 5,500,000 5,500,000 29,190,000
Total External 0 840,000 4,780,000 4,865,000 6,125,000 6,125,000 6,625,000 6,625,000 35,985,000
Total Project Expense 0 940,000 4,880,000 4,965,000 6,225,000 6,225,000 6,725,000 6,725,000 36,685,000
REVENUES
Revenue Funding Source
530 - Water Fund 0 940,000 4,880,000 4,965,000 6,225,000 6,225,000 6,725,000 6,725,000 36,685,000
Total Revenue Funding 0 940,000 4,880,000 4,965,000 6,225,000 6,225,000 6,725,000 6,725,000 36,685,000
Total Revenues 0 940,000 4,880,000 4,965,000 6,225,000 6,225,000 6,725,000 6,725,000 36,685,000
96058 - Pipeline Renewal and Replacement Program (PRRP)
Project Need: The city’s water distribution system is comprised of approximately 276 miles of pipe, of which
approximately 25 percent is cast iron that can be at risk of leaks and breaks. The city has established the Pipeline
Renewal and Replacement Program (PRRP) because failure to proactively replace aging pipe can have catastrophic
financial implications. The 2020 Water System Plan recommended that the city address all distribution system pipes
within a 100-year timeframe.
Project Description: The PRRP was established in 2022. A desktop risk analysis of the water distribution system was
completed in 2023, identifying pipes with the highest breakage risk. The PRRP is also employing acoustic leak
detection to further refine the water distribution system risk assessment. In 2024, the PRRP will replace approximately
one mile of pipe. In 2025 and 2026, approximately two miles of pipe will be replaced annually. By 2027, it is anticipated
that the city will have built up the resources and efficiencies needed to replace approximately three miles of pipe per
year. At times, funds may be transferred from this program to individual capital projects to leverage opportunities to
replace water lines within other projects such as major street improvements.
Operations and Maintenance Impact: Increase in impact during annual construction activities; however, the program
will result in a net decrease in impact as older, leak-prone water lines are replaced.
Prioritization: System Enhancement or Regulatory Requirement
CITY OF TIGARD • PROPOSED BUDGET FY 2024 2025 Page 208
WATER CAPITAL IMPROVEMENT PLAN
Actual
through
2023
Projected
2024 2025 2026 2027 2028 2029 2030
Project
Total
EXPENSES
Internal Expenses
Project Management 0 30,000 30,000 30,000 30,000 30,000 30,000 30,000 210,000
Total Internal 0 30,000 30,000 30,000 30,000 30,000 30,000 30,000 210,000
External Expenses
Design and Engineering 0 20,000 50,000 50,000 50,000 50,000 50,000 50,000 320,000
Construction 0 100,000 100,000 150,000 150,000 200,000 200,000 250,000 1,150,000
Total External 0 120,000 150,000 200,000 200,000 250,000 250,000 300,000 1,470,000
Total Project Expense 0 150,000 180,000 230,000 230,000 280,000 280,000 330,000 1,680,000
REVENUES
Revenue Funding Source
530 - Water Fund 0 150,000 180,000 230,000 230,000 280,000 280,000 330,000 1,680,000
Total Revenue Funding 0 150,000 180,000 230,000 230,000 280,000 280,000 330,000 1,680,000
Total Revenues 0 150,000 180,000 230,000 230,000 280,000 280,000 330,000 1,680,000
96059 - Water System Major Maintenance Program
Project Need: Provide major maintenance and rehabilitation of water system and firefighting capacity elements that
are aging and in need of significant repair.
Project Description: This program is used for urgent projects to renew, repair, or replace elements of the water
system that have failed or are near failure.
Operations and Maintenance Impact: None. Reduces risk of future water line breaks.
Prioritization: System Enhancement or Regulatory Requirement
Page 209CITY OF TIGARD • PROPOSED BUDGET FY 2024 2025
WATER CAPITAL IMPROVEMENT PLAN
Total Project Cost:
Actual
through
2023
Projected
2024 2025 2026 2027 2028 2029 2030
Project
Total
EXPENSES
Internal Expenses
Project Management 23,000 15,000 15,000 15,000 0 0 0 0 68,000
Total Internal 23,000 15,000 15,000 15,000 0 0 0 0 68,000
External Expenses
Design and Engineering 120,000 30,000 20,000 20,000 0 0 0 0 190,000
Construction 0 80,000 480,000 200,000 0 0 0 0 760,000
Contingency 0 10,000 150,000 65,000 0 0 0 0 225,000
Total External 120,000 120,000 650,000 285,000 0 0 0 0 1,175,000
Total Project Expense 143,000 135,000 665,000 300,000 0 0 0 0 1,243,000
REVENUES
Revenue Funding Source
530 - Water Fund 143,000 135,000 665,000 300,000 0 0 0 0 1,243,000
Total Revenue Funding 143,000 135,000 665,000 300,000 0 0 0 0 1,243,000
Total Revenues 143,000 135,000 665,000 300,000 0 0 0 0 1,243,000
$1,243,000
96060 - Generator Replacement at Pump Station 1
Project Need: The current generator is approximately 35 years old. Because of its age, replacement parts are hard to
find, and maintenance costs are increasing. Additionally, a structural evaluation of the building in which the generator
is housed determined the building is not seismically resilient and likely to experience significant damage in the event
of an earthquake, likely rendering the generator useless. Aquifer Storage and Recovery Well #1 (ASR-1) is a critical
emergency source of drinking water and co-located with Pump Station 1. The current generator is not properly sized
to operate both ASR-1 and Pump Station 1. Electrical equipment needed to operate Pump Station 1 and ASR-1 is
approximately 50 years old and past its useful life.
Project Description: Critical electrical equipment will be replaced and moved to a new seismically-resilient location
adjacent to the ASR-1 wellhouse, including switchgear, automatic transfer switch, and generator. This will enhance
reliability and ensure this critical equipment is able to operate in case of emergency.
Operations and Maintenance Impact: Enhanced reliability and stability should reduce maintenance cost over time.
Prioritization: System Enhancement or Regulatory Requirement
CITY OF TIGARD • PROPOSED BUDGET FY 2024 2025 Page 210
WATER CAPITAL IMPROVEMENT PLAN
Total Project Cost:
Actual
through
2023
Projected
2024 2025 2026 2027 2028 2029 2030
Project
Total
EXPENSES
Internal Expenses
Project Management 6,000 20,000 30,000 15,000 0 0 0 0 71,000
Total Internal 6,000 20,000 30,000 15,000 0 0 0 0 71,000
External Expenses
Design and Engineering 22,000 40,000 82,000 15,000 0 0 0 0 159,000
Contingency 0 0 10,000 5,000 0 0 0 0 15,000
Total External 22,000 40,000 92,000 20,000 0 0 0 0 174,000
Total Project Expense 28,000 60,000 122,000 35,000 0 0 0 0 245,000
REVENUES
Revenue Funding Source
531 - Water SDC Fund 28,000 60,000 122,000 35,000 0 0 0 0 245,000
Total Revenue Funding 28,000 60,000 122,000 35,000 0 0 0 0 245,000
Total Revenues 28,000 60,000 122,000 35,000 0 0 0 0 245,000
96062 - Water System Plan Addendums
Project Need: Water System Plan Addendums are needed to incorporate the Urban Growth Expansion into the areas
known as Kingston Terrace and River Terrace 2.0 into the current Water System Plan.
Project Description: The Water System Plan is a comprehensive study of the city’s water source as well as storage
and delivery systems. It will be used to guide future water utility discussions. The current Water System Plan was
adopted in December 2020, and the next update is scheduled to commence in Fiscal Year 2026. These addendums are
needed prior to the next update occurring in Fiscal Year 2026.
Operations and Maintenance Impact: No impact associated with the System Plan Addendums.
Prioritization: System Enhancement or Regulatory Requirement
$245,000
Page 211CITY OF TIGARD • PROPOSED BUDGET FY 2024 2025
WATER CAPITAL IMPROVEMENT PLAN
Total Project Cost:
Actual
through
2023
Projected
2024 2025 2026 2027 2028 2029 2030
Project
Total
EXPENSES
Internal Expenses
Project Management 0 0 0 20,000 30,000 0 0 0 50,000
Total Internal 0 0 0 20,000 30,000 0 0 0 50,000
External Expenses
Design and Engineering 0 0 0 95,000 25,000 0 0 0 120,000
Construction 0 0 0 0 340,000 0 0 0 340,000
Contingency 0 0 0 35,000 165,000 0 0 0 200,000
Total External 0 0 0 130,000 530,000 0 0 0 660,000
Total Project Expense 0 0 0 150,000 560,000 0 0 0 710,000
REVENUES
Revenue Funding Source
530 - Water Fund 0 0 0 150,000 560,000 0 0 0 710,000
Total Revenue Funding 0 0 0 150,000 560,000 0 0 0 710,000
Total Revenues 0 0 0 150,000 560,000 0 0 0 710,000
96063 - Pressure Zone Consolidation - Zones 560C and D
Project Need: Due to topographic limitations of Bull Mountain and varying times of past development, the 560-foot
pressure zone (PZ) is comprised of eight independent subzones: 560A-H. Water is supplied to these subzones from
the upper pressure zone (713-foot PZ) via pressure reducing valves (PRVs). The PRVs require regular maintenance and
specialized training in order to operate them. Therefore, the 2020 Water System Plan recommended consolidating
these subzones as much as possible.
Project Description: In order to connect the 560C and D subzones, the following work must be performed: demolish
the existing PRV at Greenfield Drive and SW 132nd Avenue and install a new PRV at Greenfield Drive and Benchview
Terrace (to provide fire flow, if modeling indicates it is necessary), install necessary piping connections to connect the
subzones, and demolish the historic pump station on SW 132nd Avenue.
Operations and Maintenance Impact: Expect some reduction in time and cost of system operations and
maintenance.
Prioritization: System Enhancement or Regulatory Requirement
$710,000
CITY OF TIGARD • PROPOSED BUDGET FY 2024 2025 Page 212
WATER CAPITAL IMPROVEMENT PLAN
Total Project Cost:
Actual
through
2023
Projected
2024 2025 2026 2027 2028 2029 2030
Project
Total
EXPENSES
Internal Expenses
Project Management 0 0 60,000 120,000 0 0 0 0 180,000
Total Internal 0 0 60,000 120,000 0 0 0 0 180,000
External Expenses
Design and Engineering 0 0 500,000 80,000 0 0 0 0 580,000
Construction 0 0 0 970,000 0 0 0 0 970,000
Contingency 0 0 225,000 465,000 0 0 0 0 690,000
Total External 0 0 725,000 1,515,000 0 0 0 0 2,240,000
Total Project Expense 0 0 785,000 1,635,000 0 0 0 0 2,420,000
REVENUES
Revenue Funding Source
530 - Water Fund 0 0 785,000 1,635,000 0 0 0 0 2,420,000
Total Revenue Funding 0 0 785,000 1,635,000 0 0 0 0 2,420,000
Total Revenues 0 0 785,000 1,635,000 0 0 0 0 2,420,000
$2,420,000
96064 - Reservoir 8-1 Structural Improvements
Project Need: In fall of 2020, exposed rebar was noted in multiple areas of the roof of Reservoir 8-1. A structural
condition assessment of the roof was immediately completed. The assessment determined that while roof failure is
not thought to be imminent, the roof itself is nearing the end of its usable life as cracks were noted along the
reinforcing grid spacing (i.e., structural rebar) on both the roof exterior as well as the roof interior. Cracks and
efflorescence on the roof interior indicate that the intrusion of external water is occurring, which poses a potential
contamination risk. Cracks were also noted along the interior roof beams, which may indicate potential overstresses in
the beams. A waterproofing epoxy coating will be applied to the roof exterior in the near term to prevent further
water seepage; however, further structural analysis and improvements must be considered to address the sagging of
the roof and cracking in the beams.
Project Description: A structural analysis will first be performed to determine the best course of action to address the
sagging roof and cracked beams. Following the analysis and design, construction activities will occur. Construction can
only be started once Reservoir 18 is complete and must be completed within one Fiscal Year as Reservoir 8-1 cannot
be offline during the peak summer season.
Operations and Maintenance Impact: Slight impact during construction activities in fiscal year 2026 as the reservoir
will be offline, but none once the reservoir is back in service.
Prioritization: System Enhancement or Regulatory Requirement
Page 213CITY OF TIGARD • PROPOSED BUDGET FY 2024 2025
WATER CAPITAL IMPROVEMENT PLAN
Total Project Cost:
Actual
through
2023
Projected
2024 2025 2026 2027 2028 2029 2030
Project
Total
EXPENSES
Internal Expenses
Project Management 0 20,000 50,000 25,000 25,000 100,000 100,000 0 320,000
Total Internal 0 20,000 50,000 25,000 25,000 100,000 100,000 0 320,000
External Expenses
Design and Engineering 0 100,000 200,000 50,000 50,000 100,000 100,000 0 600,000
Construction 0 0 0 0 0 5,140,000 5,000,000 0 10,140,000
Contingency 0 20,000 60,000 30,000 30,000 2,000,000 2,000,000 0 4,140,000
Total External 0 120,000 260,000 80,000 80,000 7,240,000 7,100,000 0 14,880,000
Total Project Expense 0 140,000 310,000 105,000 105,000 7,340,000 7,200,000 0 15,200,000
REVENUES
Revenue Funding Source
530 - Water Fund 0 140,000 310,000 105,000 105,000 7,340,000 7,200,000 0 15,200,000
Total Revenue Funding 0 140,000 310,000 105,000 105,000 7,340,000 7,200,000 0 15,200,000
Total Revenues 0 140,000 310,000 105,000 105,000 7,340,000 7,200,000 0 15,200,000
$15,200,000
96065 - Water Meter Modernization
Project Need: The Tigard Water Service Area (TWSA) water meters require city staff to physically visit each to record
water usage. The existing water meters in Tigard are often beyond their expected lifespan and no longer record water
usage with sufficient accuracy. New water meter technology allows for more transparent and accurate water meter
readings, benefiting both the city and the customer. Implementing this project will increase customer service and
assist with leak detection reporting to reduce the waste of treated water and property damage resulting from leaks.
Project Description: The Water Meter Modernization Project will replace existing meters across the TWSA with new
meters that communicate electronically with Public Works and Utility Billing departments, streamlining the meter
reading process and allowing automated alerts to staff for potential meter issues or water leaks. The project will be
completed in phases. Phase one will include a pilot project with a small number of advanced water meters and a
thorough evaluation of available water meter technologies. An implementation plan will then be created based in part
on the results of the pilot project. Phase two will involve installing meters, radios, and communication equipment
across the TWSA.
Operations and Maintenance Impact: The impact is unknown at this time. Engineering and Operations staff are
currently undertaking a pilot project to understand better the full-scale project delivery method and resources
required to construct and operate the project. Depending on the pilot project recommendations, there could be
significant impacts on the operations and utility billing staff.
Prioritization: System Enhancement or Regulatory Requirement
CITY OF TIGARD • PROPOSED BUDGET FY 2024 2025 Page 214
WATER CAPITAL IMPROVEMENT PLAN
Total Project Cost:
City of Tigard Cost:
Actual
through
2023
Projected
2024 2025 2026 2027 2028 2029 2030
Project
Total
EXPENSES
External Expenses
Design and Engineering 0 250,000 250,000 100,000 0 0 0 0 600,000
Construction 0 350,000 900,000 400,000 0 0 0 0 1,650,000
Contingency 0 60,000 460,000 200,000 0 0 0 0 720,000
Total External 0 660,000 1,610,000 700,000 0 0 0 0 2,970,000
Total Project Expense 0 660,000 1,610,000 700,000 0 0 0 0 2,970,000
REVENUES
Revenue Funding Source
530 - Water Fund 0 660,000 1,610,000 700,000 0 0 0 0 2,970,000
Total Revenue Funding 0 660,000 1,610,000 700,000 0 0 0 0 2,970,000
Total Revenues 0 660,000 1,610,000 700,000 0 0 0 0 2,970,000
$2,970,000
96066 - Water Treatment Plant & RIPS Generator
Project Need: During an extensive winter storm event in early 2021, the Water Treatment Plant and River Intake Pump
Station lost their respective dual power feeds because of regional electrical outages.
Project Description: The project will provide the ability for the Water Treatment Plant and River Intake Pump Station
to have a back-up emergency power supply.
Project Funding: The City of Tigard and City of Lake Oswego will share project expense.
Operations and Maintenance Impact: Minimal impact to operations and maintenance as the generators will need to
be operated as part of ongoing maintenance to assure they are prepared for emergency need. Maintenance will be
provided by the Water Treatment Plant staff.
Prioritization: Strategic Vision or Community Promise (Equity)
$5,500,000
Page 215CITY OF TIGARD • PROPOSED BUDGET FY 2024 2025
WATER CAPITAL IMPROVEMENT PLAN
Total Project Cost:
Actual
through
2023
Projected
2024 2025 2026 2027 2028 2029 2030
Project
Total
EXPENSES
Internal Expenses
Project Management 0 60,000 50,000 0 0 0 0 0 110,000
Total Internal 0 60,000 50,000 0 0 0 0 0 110,000
External Expenses
Design and Engineering 0 10,000 25,000 0 0 0 0 0 35,000
Contingency 0 20,000 30,000 0 0 0 0 0 50,000
Total External 0 30,000 55,000 0 0 0 0 0 85,000
Total Project Expense 0 90,000 105,000 0 0 0 0 0 195,000
REVENUES
Revenue Funding Source
530 - Water Fund 0 90,000 105,000 0 0 0 0 0 195,000
Total Revenue Funding 0 90,000 105,000 0 0 0 0 0 195,000
Total Revenues 0 90,000 105,000 0 0 0 0 0 195,000
96067 - Water System Service Line Inventory
Project Need: The city is required to create an inventory of all water meter service lines in the Tigard Water Service
Area (TWSA) per the Environmental Protection Agency (EPA) Lead and Copper Rule Revisions (LCRR). The LCRR
were adopted in late 2021, and thus not addressed in the 2020 Water System Plan. This inventory must identify the
pipe material type of all water service lines in the TWSA, on both the public and private sides of the water meter.
The inventory is required to be submitted to the Oregon Health Authority (OHA) by October 2024 and updated
annually. If any service lines materials are unknown as of October 2024 or identified as being made of lead, a
service line replacement plan must be submitted to OHA for approval and then implemented.
Project Description: This project will create the inventory required by the LCRR and ensure compliance with EPA
and OHA regulations. The inventory creation will include review of historical records and physical investigations of
service lines connected to TWSA water meters. The project will also prepare the service line replacement plan as
necessary. All required documentation will be submitted to OHA by the October 2024 deadline.
Operations and Maintenance Impact: Physical investigations of water service lines will utilize Tigard water
maintenance crews to complete the work, temporarily increasing their workload during the physical investigation
period. Ongoing minor increase in operations staff workload to maintain and update the LCRR inventory.
Prioritization: System Enhancement or Regulatory Requirement
$195,000
CITY OF TIGARD • PROPOSED BUDGET FY 2024 2025 Page 216
WATER CAPITAL IMPROVEMENT PLAN
Total Project Cost:
Actual
through
2023
Projected
2024 2025 2026 2027 2028 2029 2030
Project
Total
EXPENSES
Internal Expenses
Project Management 0 0 0 75,000 125,000 0 0 0 200,000
Total Internal 0 0 0 75,000 125,000 0 0 0 200,000
External Expenses
Design and Engineering 0 0 0 750,000 150,000 0 0 0 900,000
Construction 0 0 0 0 2,775,000 0 0 0 2,775,000
Contingency 0 0 0 330,000 1,220,000 0 0 0 1,550,000
Total External 0 0 0 1,080,000 4,145,000 0 0 0 5,225,000
Total Project Expense 0 0 0 1,155,000 4,270,000 0 0 0 5,425,000
REVENUES
Revenue Funding Source
530 - Water Fund 0 0 0 1,155,000 4,270,000 0 0 0 5,425,000
Total Revenue Funding 0 0 0 1,155,000 4,270,000 0 0 0 5,425,000
Total Revenues 0 0 0 1,155,000 4,270,000 0 0 0 5,425,000
96069 - Pump Station 8 Rebuild
Project Need: The 2020 Water System Plan identified Pump Station 8 as being near the end of its usable life and
Reservoir 8-3 for abandonment due to its age and limited storage capacity. In addition, Pump Station 8 is currently
split between two sites, which is abnormal: two pumps are on the north site with Reservoir 8-3 and three pumps are
located on the south site with the remaining Reservoirs 8-1 and 8-2. It was also determined that rebuilding Pump
Station 8 on the north site would be the best use of the property and advantageous for operations and maintenance
staff as all pumps would be co-located in one pump station.
Project Description: Reservoir 8-3 will be demolished and a new Pump Station 8 will be built on the north site. The
existing pump station vaults on the north and south sides will be properly demolished as well. This project cannot be
completed until the Reservoir 8-1 Structural Improvements (CIP #96064) has been completed, which in turn cannot
begin until Reservoir 18 (CIP #96040) is fully online.
Operations and Maintenance Impact: Slight decrease once Reservoir 8-3 is demolished. New pump station should
not impact operations and maintenance as same pumping capacity will be replaced.
Prioritization: System Enhancement or Regulatory Requirement
$5,425,000
Page 217CITY OF TIGARD • PROPOSED BUDGET FY 2024 2025
WATER CAPITAL IMPROVEMENT PLAN
Total Project Cost:
Actual
through
2023
Projected
2024 2025 2026 2027 2028 2029 2030
Project
Total
EXPENSES
Internal Expenses
Project Management 0 0 25,000 0 0 0 50,000 0 75,000
Total Internal 0 0 25,000 0 0 0 50,000 0 75,000
External Expenses
Design and Engineering 0 0 250,000 0 0 0 50,000 0 300,000
Construction 0 0 0 0 0 0 685,000 0 685,000
Contingency 0 0 0 0 0 0 300,000 0 300,000
Total External 0 0 250,000 0 0 0 1,035,000 0 1,285,000
Total Project Expense 0 0 275,000 0 0 0 1,085,000 0 1,360,000
REVENUES
Revenue Funding Source
530 - Water Fund 0 0 275,000 0 0 0 1,085,000 0 1,360,000
Total Revenue Funding 0 0 275,000 0 0 0 1,085,000 0 1,360,000
Total Revenues 0 0 275,000 0 0 0 1,085,000 0 1,360,000
96070 - ASR Expansion Feasibility Study
Project Need: Under the city’s aquifer storage and recovery (ASR) limited license, the city has the ability to drill and
install up to five ASR wells. Three ASR wells have been drilled since the limited license was obtained in 2000 and serve
as the city’s back-up resilient water source. With anticipated population growth and increasing water demand, the city
will will optimize operation of its existing ASR wells to meet increased water demand and evaluate if the development
of additional ASR wells is feasible.
Project Description: The first phase of this project will utilize the City’s hydrogeologist of record to perform an
evaluation of current ASR well operations and to prepare a new operational plan to meet projected increased water
demands. In the second phase of this project, the City’s hydrogeologist of record will assist staff in locating potential
sites for additional ASR wells. In addition, test wells will be drilled by a qualified driller in order for the hydrogeologist
to determine suitability of the well for ASR purposes. Therefore, the second phase study will include both consultant
and drilling services.
Operations and Maintenance Impact: None.
Prioritization: Strategic Vision or Community Promise (Equity)
$1,360,000
CITY OF TIGARD • PROPOSED BUDGET FY 2024 2025 Page 218
WATER CAPITAL IMPROVEMENT PLAN
Total Project Cost:
Actual
through
2023
Projected
2024 2025 2026 2027 2028 2029 2030
Project
Total
EXPENSES
Internal Expenses
Project Management 0 0 0 25,000 0 0 0 0 25,000
Total Internal 0 0 0 25,000 0 0 0 0 25,000
External Expenses
Design and Engineering 0 0 0 70,000 0 0 0 0 70,000
Contingency 0 0 0 30,000 0 0 0 0 30,000
Total External 0 0 0 100,000 0 0 0 0 100,000
Total Project Expense 0 0 0 125,000 0 0 0 0 125,000
REVENUES
Revenue Funding Source
530 - Water Fund 0 0 0 125,000 0 0 0 0 125,000
Total Revenue Funding 0 0 0 125,000 0 0 0 0 125,000
Total Revenues 0 0 0 125,000 0 0 0 0 125,000
96071 - Water Management and Conservation Plan
Project Need: The purpose of a Water Management and Conservation Plan (WMCP) is to serve as a guide for the
development and implementation of programs and policies to ensure sustainable use of water resources in the city.
The WMCP will provide a description of the water system, identify the water source(s) used, and explain how the city
will manage and conserve supplies to meet future demands.
Project Description: Prepare a WMCP that evaluates the management and conservation measures that the city can
undertake. The WMCP must consider water that can be saved through conservation practices as a source of supply to
meet growing demands if the water saved is less expensive than developing a new supply. The plan represents an
integrated resource management approach to securing the city’s long-term water supply.
Operations and Maintenance Impact: None.
Prioritization: System Enhancement or Regulatory Requirement
$125,000
Page 219CITY OF TIGARD • PROPOSED BUDGET FY 2024 2025
WATER CAPITAL IMPROVEMENT PLAN
Total Project Cost:
Actual
through
2023
Projected
2024 2025 2026 2027 2028 2029 2030
Project
Total
EXPENSES
Internal Expenses
Project Management 0 0 0 0 100,000 0 0 0 100,000
Total Internal 0 0 0 0 100,000 0 0 0 100,000
External Expenses
Design and Engineering 0 0 0 0 550,000 0 0 0 550,000
Contingency 0 0 0 0 130,000 0 0 0 130,000
Total External 0 0 0 0 680,000 0 0 0 680,000
Total Project Expense 0 0 0 0 780,000 0 0 0 780,000
REVENUES
Revenue Funding Source
530 - Water Fund 0 0 0 0 780,000 0 0 0 780,000
Total Revenue Funding 0 0 0 0 780,000 0 0 0 780,000
Total Revenues 0 0 0 0 780,000 0 0 0 780,000
96072 - Water System Plan
Project Need: The city conducts water system planning every five to ten years. The current Water System Plan was
adopted in December 2020. The 2020 Water System Plan identified a piping seismic backbone that would be used to
move water throughout the city if a major seismic event were to occur. A fifty-year water distribution system seismic
plan will develop a strategy for seismically hardening that backbone.
Project Description: The Water System Plan is a comprehensive study of the city’s water source as well as storage
and delivery systems and will be used to guide future water utility discussions. Develop a plan for seismically
hardening the backbone identified in the 2020 Water System Plan. The plan should also include further seismic
analyses of Pump Station 5 and Reservoir 13 and develop a fifty-year capital improvement plan. The Water System
Plan has a 20-year planning horizon and is predicated on the city’s projected population growth during that time.
Operations and Maintenance Impact: None.
Prioritization: Strategic Vision or Community Promise (Equity)
$780,000
CITY OF TIGARD • PROPOSED BUDGET FY 2024 2025 Page 220
WATER CAPITAL IMPROVEMENT PLAN
Total Project Cost:
City of Tigard Cost:
Actual
through
2023
Projected
2024 2025 2026 2027 2028 2029 2030
Project
Total
EXPENSES
Internal Expenses
Project Management 0 0 0 150,000 150,000 0 0 0 300,000
Total Internal 0 0 0 150,000 150,000 0 0 0 300,000
External Expenses
Design and Engineering 0 0 0 695,000 380,000 0 0 0 1,075,000
Construction 0 0 0 0 4,750,000 0 0 0 4,750,000
Contingency 0 0 0 250,000 2,000,000 0 0 0 2,250,000
Total External 0 0 0 945,000 7,130,000 0 0 0 8,075,000
Total Project Expense 0 0 0 1,095,000 7,280,000 0 0 0 8,375,000
REVENUES
Revenue Funding Source
530 - Water Fund 0 0 0 1,095,000 7,280,000 0 0 0 8,375,000
Total Revenue Funding 0 0 0 1,095,000 7,280,000 0 0 0 8,375,000
Total Revenues 0 0 0 1,095,000 7,280,000 0 0 0 8,375,000
96075 - Lake Oswego / Tigard Water Supply Extension
Project Need: The 2020 Water System Plan projected that as population increases, Tigard’s current supply allotment
from the Lake Oswego/Tigard (LOT) water partnership of 14 million gallons per day (MGD) will not be adequate to
continue to supply firm capacity to meet projected maximum daily demand (MDD) by 2029. Therefore, system
improvements must be complete and fully online by 2029 in order to continue to provide uninterrupted service to
customers.
Project Description: System improvements are needed to alleviate hydraulic restraints in the system in order to
increase the LOT supply from 14 MGD to 18 MGD. Work will include adding a finished water pump at the LOT water
treatment plant (cost share with Lake Oswego), installation of approximately 5,600 linear feet of 36-inch diameter pipe
from Waluga Reservoir to SW Bangy Road, installation of the sixth pump at Pump Station 5, and installation of
approximately 250 linear feet of 24-inch diameter pipe to cross under Fanno Creek.
Operations and Maintenance Impact: Minor increase in operational costs to maintain new pump at Pump Station 5.
Prioritization: Strategic Vision or Community Promise (Equity)
$8,500,000
$8,375,000
Page 221CITY OF TIGARD • PROPOSED BUDGET FY 2024 2025
WATER CAPITAL IMPROVEMENT PLAN
Total Project Cost:
Actual
through
2023
Projected
2024 2025 2026 2027 2028 2029 2030
Project
Total
EXPENSES
Internal Expenses
Project Management 0 30,000 50,000 50,000 0 0 0 0 130,000
Total Internal 0 30,000 50,000 50,000 0 0 0 0 130,000
External Expenses
Land/Right of Way 0 0 100,000 3,000,000 0 0 0 0 3,100,000
Design and Engineering 0 75,000 0 0 0 0 0 0 75,000
Construction 0 0 0 0 0 0 0 0
Contingency 0 10,000 0 0 0 0 0 0 10,000
Total External 0 85,000 100,000 3,000,000 0 0 0 0 3,185,000
Total Project Expense 0 115,000 150,000 3,050,000 0 0 0 0 3,315,000
REVENUES
Revenue Funding Source
531 - Water SDC Fund 0 115,000 150,000 3,050,000 0 0 0 0 3,315,000
Total Revenue Funding 0 115,000 150,000 3,050,000 0 0 0 0 3,315,000
Total Revenues 0 115,000 150,000 3,050,000 0 0 0 0 3,315,000
$3,315,000
96076 - Reservoir 19
Project Need: The 2020 Water System Plan identified the need for a new reservoir in the 410-pressure zone to serve
the growing southwestern portion of the water system and allow for aging reservoir infrastructure to be
decommissioned. In addition, the Water System Plan Addendum that is currently being completed for the Kingston
Terrace expansion area has indicated that the new reservoir must be constructed by 2029 to meet current
development timelines.
Project Description: The first part of this project includes a Siting Feasibility Study and Land Acquisition for the
proposed Reservoir 19. Due to the rapid development occurring in the 410 pressure zone elevation, the available
property for a reservoir is limited. The goal for this project is to acquire property for the reservoir prior to residential
development occurring which would cause displacement in the future if the acquisition phase were delayed. The
project scope will be adjusted to include Reservoir Design and Construction in later years.
Operations and Maintenance Impact: Minor impact for maintenance.
Prioritization: Strategic Vision or Community Promise (Equity)
CITY OF TIGARD • PROPOSED BUDGET FY 2024 2025 Page 222
WATER CAPITAL IMPROVEMENT PLAN
Total Project Cost:
Actual
through
2023
Projected
2024 2025 2026 2027 2028 2029 2030
Project
Total
EXPENSES
Internal Expenses
Project Management 0 0 0 0 0 10,000 0 0 10,000
Total Internal 0 0 0 0 0 10,000 0 0 10,000
External Expenses
Design and Engineering 0 0 0 0 0 100,000 0 0 100,000
Contingency 0 0 0 0 0 40,000 0 0 40,000
Total External 0 0 0 0 0 140,000 0 0 140,000
Total Project Expense 0 0 0 0 0 150,000 0 0 150,000
REVENUES
Revenue Funding Source
531 - Water SDC Fund 0 0 0 0 0 150,000 0 0 150,000
Total Revenue Funding 0 0 0 0 0 150,000 0 0 150,000
Total Revenues 0 0 0 0 0 150,000 0 0 150,000
96077 - 2027 Water System Plan SDC Analysis
Project Need: The city will engage a consultant to assist with an overall financial model for the Water system with
a focused lens on the long-term implementation plan. This project will focus on the projects from the Water
System Plan, which is expected to be completed in Fiscal Year 2026-27.
Project Description: Water SDC Analysis and Rate Setting – a consultant will be tasked with an analysis of the
city’s current Water SDC rates and incorporate the new system capital needs with the new system plan and
develop revised rates for the near future. The consultant will also help the city determine the appropriate use of
both SDC-Improvement and SDC-Reimbursement dollars for individual projects in the system plan.
Operations and Maintenance Impact: None.
Prioritization: System Enhancement or Regulatory Requirement
$150,000