Loading...
Permit (25) CITY OF TIGARD MECHANICAL PERMIT N ...,_ ■ . COMMUNITY DEVELOPMENT Permit#: MEC2023-00799 Date Issued: 11/1/2023 T I(1 A p 1) 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Parcel: 2S113AC00103 Jurisdiction: Tigard Site address: 7204 SW DURHAM RD 800 Project: Clario Subdivision: None Lot: None Project Description: New 7.5-ton RTU and duct work. Contractor: EXCEL HVAC INC Owner: PACIFIC REALITY ASSOCIATES LP PO BOX 1188 ATTN: N PIVEN CANBY, OR 97013 15350 SE SEQUOIA PKWY#300 PORTLAND, OR 97224 PHONE: 971-930-7194 PHONE: FAX: FEES Specifics: Description Date Amount Type of Use: COM Permit Fee 11/01/2023 $970.01 Class of Work: ALT Type of Const: VB Plan Review 11/01/2023 $242.50 Occupancy Grp: B Occupancy Load: 12%State Surcharge-Mechanical 11/01/2023 $116.40 Stories: 1 Info Process/Archiving-Lg$2.00(over 11/01/2023 $4.00 11x17) Project Valuation: $34,500.00 Info Process/Archiving-Sm$0.50(up to 11/01/2023 $30.00 Fuel Air Handlers 11x17) Fuel Types: Natural Gas Units< 10000 cfm: Gas Pressure: Units> 10000 cfm: Furnaces Boilers&Compressors Furnaces<100K BTU: 0-3 HP: Furnaces>=100K BTU: 3-15 HP: Floor Furnaces: 15-30 HP: Unit Heaters: 30-50 HP: Vents w/o Appliances: 50 or Greater HP: Air Conditioning: Heat Pump: 1 Appliances Vent Fans: Vent Systems: Total $1,362.91 Hoods: Comm Incinerators: Woodstoves: Gas Fireplaces: Required Items and Reports(Conditions) Clothes Dryers: Other Mech Units: Gas Outlets: Other Desc: Duct Work: 1000 Fire/Smoke Dampers: This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR 952-001-0010 through OAR 952-001-0090. You may obtain a copy of the rules Issued By:A. Permittee Signature: Call 503.639.4175 by 7:00 a.m.for the next available inspection date. This permit card shall be kept in a conspicuous place on the job site until completion of the project. Approved plans are required on the job site at the time of each inspection. Mechanical Permit ApplicationCEIVED FOR OFFICE l'SGONIa City of Tigard OCT 0 5 2023 Received Date/By: ® , `�3 Permit G 13125 SW Hall Blvd.,Tigard,OR 97223 y Plan Review Other Permit: � Phone: 503.718.2439 Fax: 503.598.19(�JI�OF TIGARDDate/By: ,0 i� TIGARD Inspection Line: 503.639.4175 BUILDING DIVISION DateReadyBy: s: H SeePage2for Internet: www.tigard-or.gov l! V Notified/Method:I 7uri / I t i ap Supplemental Information g r. I"'�COIMI�� .",TYPE..OF WORK S S - RCIAL",", Ei75E(`.11>,CKLIST Mechanical permit fees*are basedon the value of the work ❑New construction Addition/alteration/replacement performed.Indicate the value(rounded to the nearest dollar)of all ❑Demolition ❑Other: mechanical materials,equipment,labor,overhead,and profit. Value:$ 341 ADD CATEGORY OF"CONSTRUCTION , ' ! = RESIDENTIAL EQUIPMENT I SYST FEES*' ❑ 1-and 2-family dwelling NrCommercial/industrial ❑Accessory building For special information use checklist. ❑Multi-family ❑Master builder ❑Other: Description Qty. Ea. Total JOB 1STTE INFORMATION AND LOCATION FFF, ' Heating/cooling: Air conditioning 46.75 Job site address: 7'2©4 5 w pv R W.t rvi g 0, STE 900 Furnace 100,000 BTU(ducts/vents) 46.75 City/State/ZIP: / , i LA,/V, a h"' `f 772 24 Fumace 100,000+BTU(ducts/vents) 54.91 Heat pump 61.06 Suite/bldg./apt.no.: 8 c,o Project name: G L 4 R t Q Duct work 23.32 Cross street/directions to job site: 5 ln/ (7U R/../An'( / 5IAA F2"cli 4 e V r Hydronic hot water system 23.32 Residential boiler(radiator or hydronic) 23.32 Unit heaters(fuel-type,not electric), in-wall,in-duct,suspended,etc. 46.75 Flue/vent for any of above 23.32 Subdivision: Lot no.: Other: 23.32 O Other fuel appliances: Tax map/parcel no.: h 2e- 5 er"'9, 7 c. Water heater 23.32 ,;;j 14t T- it Gas fireplace/insert 33.39 �IIESrCRIPTION 41�3'yORKF f, P Flue vent for water heater or gas A 2/;7 Il :(;4'.'f"L.) „y p,,,G y . %,"/4-• 2,t~ fireplace 23.32 Log lighter(gas) 23.32 Wood/pellet stove 33.39 Wood fireplace/insert 23.32 Chimney/liner/flue/vent 23.32 Other: 23.32 *;W PROPERTY OWNER „ ""r" f'TENMT !,,ro z, ;, Environmental exhaust and ventilation: Name: (94 G -T-,F v s r Range hood/other kitchen 5,....:, ,� w equipment 33.39 Address: i 5 5 E ©(A P K '1' Clothes dryer exhaust 33.39 City/State/ZIP: c Single-duct exhaust(bathrooms, tY i�o�'( GAP( G' 1 L. toilet compartments,utility rooms) 23.32 Phone:(`i o 3) e.2.4 V 3 coFax:( ) Attic/crawlspace fans 23.32 e ;l ,� 1PPL1yC'ANT s ;, '; ❑,CONTACTfPERSON Other: 23.32 /,riif/cif„� ... � :�.. :.,,., Fuel piping: Business name: r IC'(j L. //,,,r4°C,.. "/C . / f $14.15 for first four;$4.03 for each additional Contact name: /4 1 C,/' ' 1..(4>-r& Furnace,etc. Gas heat pump Address: l 5 L '%2 '.,1.n!' ()7 s;''6 • .`-(7,,', _ t e +,`'° •, t..,::. Wall/suspended/unit heater City/State/ZIP: ?;��'( ,./ C tt2, Z :"•1 d i= Water heater 5(..'''::Phone:( ) i^.2 ;x::' - 1" y:: ! Fax::( ) Fireplace Range E-mail :1- '} t' N, � k'cr.! 41`' [. , r,: ,,;, =- Barbecue r � f r�FN olo*.COIfe r ' n,1 , Clothes d r er(gas) Business name: l a 3 t A PP Other Address: i , Subtotal City/State/ZIP: I i Minimum permit fee($90.00) Plan review(25%of permit fee) _ Phone:( ) /1 Fax:( ) State surcharge(12%of permit fee) CCB lic.: 2, ( 4 3 .f5 TOTAL PERMIT FEE _ This permit application expires if a permit is not obtained within 180 days after it has been accepted as complete. Authorized signature: ® _ * Fee methodology set by Tri-County Building Industry Service Board Print name: H o-r z/ A l u t E". Date: W/5I2 t2 2 3 I:\Building\Permits\MEC_PermitApp_040113.doc 440-4617I(11/02/COM/WEB) City of Tigard COMMUNITY DEVELOPMENT DEPARTMENT I T 1 n R D Building Permit Review — Commercial - No Land Use Building Permit #: A7Ic?c3 007 7 Site Address: 12Oq ''J DJ(* own RA Suite/Bldg#: so° Project Name: Ctanrl D (Name of commercial business occupying the space. If vacant,enter Spec Space.) Planning Review Proposal: NAB tier-4e — V1QL4 owc-QS Existing Business Activity: way-el/o s`re Proposed Business Activity: -- .0" Verify site address/suite#exists and active in permit system. ,0-River Terrace Neighborhood: ❑ Yes 41.-No Zoning: t1- P Permitted Use: tin Yes ❑ No ❑ Spec Space e' Confirm no land use required. Business License: Exists: "Yes ❑ No,applicant was provided a business license application Notes: NO Jtc' �ird,r. ` t„A Ave R.o tnl Approved by Planning: `— Date: I 0 f S/ 3 Revisions (after Building Submittal only) Reviewer Date Revision 1: ❑ Approved ❑ Not Approved Revision 2: ❑ Approved ❑ Not Approved Revision 3: ❑ Approved ❑ Not Approved Building Permit Submittal Original Submittal Date: J 6 �7 Site Plans: # Building Plans: # Building Permit#: ,Enter building permit#above. Workflow Routing: [ /"lanning X Permit Coordinator VBuilding Workflow Sign-off: 1Ti,'Sign-off for Planning(include notes from planning review) Route Application Documents: Z Building: original permit application,site plans,building plans,engineer and beam calculations and trust details,if applicable,etc. Notes: By Permit Technician: Date: 1( /( /9 3 I:\Building\Fonns\BldgPermitRvw_COM NoLandUse_09072022.docx Engineering Review ❑ Slope at building pad: ❑ PFI Permit#: ❑ Conditions "Met"prior to issuance of per ❑ Easements (encroachments)per e eering conditions of approval and plat (not typical on SDR/CUP) ❑ Water Quality/Quantity F ty: Assess Water ty Fee in-lieu: _ID Yes ❑ No Assess er Quantity Fee in-lieu: ❑ Yes ❑ No LI Facility on lot: ❑ Yes ❑ No Add Fee: ❑ Yes ❑ No OT Approved by Engineering: Date Notes: Approved by Engineering: Date: Revisions (after Building Submittal only) Reviewer Date Revision 1: ❑ Approved ❑ Not Approved Revision 2: ❑ Approved ❑ Not Approved Revision 3: ❑ Approved ❑ Not Approved Permit Coordinator Review ❑ Conditions "Met"prior to issuance of permit ❑ Approved,NOT Released: Date: ❑ ENG Revisions Requ' • .: Date: Notes: ❑ SDC -mption ❑ Applied for ❑ Received ❑ Does not apply ❑ F--s Entered: Wash Co Trans Dev Tax: ❑ Yes ❑ N/A ❑ Deferred Tigard Trans SDC: ❑ Yes ❑ N/A ❑ Deferred Parks SDC: ❑ Yes ❑ N/A ❑ Deferred LIDA Fee: ❑ Yes ❑ N/A ❑ OK to Issue/Approved by Permit Coordinator: Date: Revisions (after Building Submittal only) Reviewer Date Revision 1: ❑ Approved ❑ Not Approved Revision 2: ❑ Approved ❑ Not Approved Revision 3: ❑ Approved ❑ Not Approved I:\Building\Forms\BldgPermitRvw_COM NoLandUse_08162022.docx