Loading...
Permit CITY OF TIGARD MECHANICAL PERMIT COMMUNITY DEVELOPMENT Permit#: MEC2023-00849 TIGARD 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Date Issued: 11/21/2023 Parcel: 2S101AB03100 Jurisdiction: Tigard Site address: 12115 SW 70TH AVE Project: Tigard Triangle Partners Subdivision: 2012-009 PARTITION PLAT Lot: 3 Project Description: Mechanical for TI:(1)new 2-ton ductless RTU. Contractor: OREGON AIRE INC Owner: TIGARD TRIANGLE PARTNERS LLC 7715 NE 33RD DR STE A BY DEERING MANAGEMENT GROUP PORTLAND, OR 97211 4800 SW MACADAM AVE STE 120 PORTLAND, OR 97239 PHONE: 503-335-2222 PHONE: FAX: 360-423-1978 FEES Specifics: Description Date Amount Type of Use: COM Permit Fee 11/16/2023 $288.70 Class of Work: ALT Type of Const: VB Plan Review 11/16/2023 $72.18 Occupancy Grp: B Occupancy Load: 12%State Surcharge-Mechanical 11/16/2023 $34.64 Stories: Info Process/Archiving-Sm$0.50(up to 11/16/2023 $2.50 11x17) Project Valuation: $7,875.00 Fuel Air Handlers Fuel Types: Electricity Units<10000 cfm: Gas Pressure: Units>10000 cfm: Furnaces Boilers&Compressors Furnaces<100K BTU: 0-3 HP: Furnaces>=100K BTU: 3-15 HP: Floor Furnaces: 15-30 HP: Unit Heaters: 30-50 HP: Vents w/o Appliances: 50 or Greater HP: Air Conditioning: Heat Pump: 1 Appliances Vent Fans: Vent Systems: Total $398.02 Hoods: Comm Incinerators: Required Items and Reports(Conditions) Woodstoves: Gas Fireplaces: Clothes Dryers: Other Mech Units: Gas Outlets: Other Desc: Duct Work: Fire/Smoke Dampers: This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR 952-001-0010 through OAR 952-001-0090. You may obtain a copy of the rules 1 Issued By: .j /�,G Permittee Signature: 4 e f 'f r G<� ( —t Call 503.639.417 by7:00 a.m.for the next available inspection date. p This permit card shall be kept in a conspicuous place on the job site until completion of the project. Approved plans are required on the job site at the time of each inspection. Mechanical Permit Application FOR OFFICE USE ONLY City of Tigard Received [ - q 13125 SW Hall Blvd.,Tigard,OR 97ECEIVEC Date/By: \'136\1,vb3 . yip Permit No.: M C 1,'�nti3 0 g�tq Phone: 503.718.2439 Fax: 503.598. 9 Plan Review DateBy: •J 9r Other Permit: T 1 G A R D Inspection Line: 503.639.4175 Date Ready/By: h Internet: www.tigard-or.gov p C T i o 2023 I H See Pagel for Notified/Method: /fi/ii/r3 „1 Supplemental Information ,),`, r",... , ,_,., .. TiE OF WOJI ``y y� ,` [� C fj' UJ)FEE:"SCHEI)i]LE USE CHECKLIST ❑New construction ❑■ Addition/altera 1 � r'nth 1 � Mechanical permit fees*are based on the value of the work performed.Indicate the value(rounded to the nearest dollar)of all ❑Demolition ❑Other: mechanical materials,equipment,labor,overhead,and profit. CATEGORY OF CONSTRUCTION Value $7 875J OO RESIDENTIAL EQ JIPMENT/SYSTEMS FEES* ❑ 1-and 2-family dwelling Q Commercial/industrial ❑Accessory building For special information use checklist ❑Multi-family 0 Master builder 0 Other: Description Qty. Ea. Total JOB SIT1 INFORMATION='AND LOCATION Heating/cooling: Job site address:12115 SW 70th Ave Air conditioning 46.75 Furnace 100,000 BTU(ducts/vents) 46.75 City/State/ZIP:Tigard/Oregon/97223 Fumace 100,000+BTU(ducts/vents) 54.91 Suite/bldg./apt.no.: I Project name:Tigard Triangle Poor-5 Duct pump 21.32 Duct work 23.32 Cross street/directions to job site: Hydronic hot water system 23.32 Residential boiler(radiator or hydronic) 23.32 Unit heaters(fuel-type,not electric), in-wall,in-duct,suspended,etc. 46.75 Flue/vent for any of above 23.32 Subdivision: I Lot no.: Other: 23.32 Other fuel appliances: Tax map/parcel no.: Water heater 23.32 DESCRIPTION OF WORK( " Gas fireplace/insert 33.39 Flue Install a new 2-Ton ductless unit for the 2nd floor electrical room firepla et for water heater or gas 23.32 Log lighter(gas) 23.32 Wood/pellet stove 33.39 Wood fireplace/insert 23.32 Chimney/liner/flue/vent 23.32 (].,PROPERTY OWNER I 0 TENS Other: 23.32 Environmental exhaust and ventilation: Name:Deering Management Range hood/other kitchen Address:4800 S Macadam Ave I#120 — equipment 33.39 Clothes dryer exhaust 33.39 City/State/ZIP:Portland/Oregon/97239 Single-duct exhaust(bathrooms, toilet compartments,utility rooms) 23.32 Phone:(503)225-1545 Fax:( ) Attic/crawlspace fans 23.32 ` ,I] APPLICANT ❑ CONTACT PERSON Other: 23.32 Business name:Oregon-Aire Inc. Fuel piping: $14.15 for first four;$4.03 for each additional Contact name:lan McDonald Furnace,etc. Address:7715 NE 33rd Drive I Suite A Gas heat pump Wall/suspended/unit heater City/State/ZIP:Portland/Oregon/97211 Water heater Phone:(503)335-2222 Fax::( ) n/a Fireplace E-mail:permits@oregon-aire.com Range Barbecue CONTRACTOR Clothes dryer(gas) Business name:Oregon-Aire Inc. Other: Address:7715 NE 33rd Drive I Suite A MECHANICAL PERMIT FEES* Subtotal City/State/ZIP:Portland/Oregon/97211 Minimum permit fee($90.00) Phone:(603)335-2222 Fax:( ) n/a Plan review(25%of permit fee) State surcharge(12%of permit fee) CCB lie.:64235 TOTAL PERMIT FEE This permit application expires if a permit is not obtained within 180 /J S days after it has been accepted as complete. Authorized signature: adi,kie.po _ x Fee methodology set by Tri-County Building Industry Service Board Print name:Ian McDonald Date: 10/16/23 L\Building\Permits\MEC PermitApp_040113.doc 440-4617T(11/02/COM/WEB) City of Tigard q COMMUNITY DEVELOPMENT DEPARTMENT III TiGARD Building Permit Review — Commercial - No Land Use Building Permit #: 1,AJ1,o13. 00 SA 4 Site Address: 1 Z I t A —7'Q' i\)E Suite/Bldg#: Project Name: •'1-' zp IIat ,L,e 13v, 1 , (Name of commercial business occupying the space. If vacant,enter Spec Space.) Planning Review Proposal: 12.7 U Existing Business Activity: f2f C e Pro�pos d Business Activity: i'FtC L� Verif site address/suite#exists and active inpermit s Y yste River Terrace Neighborhood: ❑ Yes 1J No Z tng: 'in U ,i/PerMitted Use: 1' Yes ❑ No ❑ Spec Space 1 - nnfirm no land use required. Business License: Exists: LJ Yes ❑ No,applicant was provided a business license application Notes: 1.5 M? Sc-o2et,:� •Tb S'` 1 Brim-vpAQD .,(_~I kr Approved by Planning: Date: 7 Oh ta/Z3 Revisions (after Building Submittal only) Reviewer Date Revision 1: ❑ Approved E Not Approved Revision 2: ❑ Approved ❑ Not Approved Revision 3: ❑ Approved ❑ Not Approved Building Permit Submittal Original Submittal Date: VI 11\O OAS Site Plans: # 1, Building Plans: # 'L Building Permit#: ES Enter building permit# above. Workflow Routing: Er Planning ❑ Permit Coordinator Building Workflow Sign-off: V Sign-off for Planning(include notes from planning review) Route Application Documents: IV Building: original permit application, site plans,building plans,engineer and beam calculations and trust details,if applicable,etc. Notes: y� • By Permit Technician: C' lM-&i Date: `0 130 ILL 3 I:\Building\Forms\BldgPermitRvw COM NoLandUse 09072022.docx Engineering Review W. Slope at building pad: ❑ 'FT Permit#: ❑ Co ..tions "Met"prior to issuance of permit ❑ Ease -nts (encroachments)per engineering conditions of approval and plat .t typical on SDR/CUP) ❑ Water Q : 'ty/Quantity Facility: Assess •-ter Quality Fee in-lieu: ❑ Yes ❑ No Assess Wate Quantity Fee in-lieu: ❑ Yes ❑ No LIDA Facility .. lot: ❑ Yes ❑ No Add Fee: ❑ Yes ❑ No ❑ NOT Approved by ngineering: Date Notes: Approved by Engineering: Date: Revisions (after Building Submittal on ) Reviewer Date Revision 1: ❑ Approved ❑ N. •pproved Revision 2: ❑ Approved ❑ N.t • .proved Revision 3: ❑ Approved ❑ of Ap. oved Permit Coordinator Review ❑ Conditions "Met"prior to issu• ce of permit ❑ Approved,NOT Relea -d: Date: ❑ ENG Revisions Req red: Date: Notes: ❑ SDC Exemption ❑ Applied for ❑ Receive ❑ Does not apply ❑ Fees Entered: Wash Co Trans Dev Tax: ❑ Yes ❑ N/A ❑ Deferred Tigard Trans SDC: ❑ Yes N/A ❑ Deferred Parks SDC: ❑ Yes ❑ /A ❑ Deferred LIDA Fee: El Yes 1\\A ❑ OK t. ssue/Approved by Permit Coordinator: Date: Revisi,,ns (after Building Submittal only) Reviewer Date ' -vision 1: ❑ Approved ❑ Not Approved 'evision 2: ❑ Approved ❑ Not Approved Revision 3: Cl Approved ❑ Not Approved I:\Building\Forms\BldgPermitRvw COM_NoLandUse_08162022.docx