Loading...
Permit (51) INCITY OF TIGARD SEWER CONNECTION PERMIT = COMM UNITY DEVELOPMENT Permit#: SWR2023-00256 T r[;A la I) 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Date Issued: 10/20/2023 Parcel: 2S 107AD05400 Site address: 14664 SW 165TH AVE Jurisdiction: Tigard Project: South River Terrace,Building 22,Unit 3 of 3 Project Description: Sewer connection for new attached dwelling. Subdivision: SOUTH RIVER TERRACE Lot: J Contractor: Owner: TAYLOR MORRISON NORTHWEST LLC 703 BROADWAY ST STE 710 VANCOUVER,WA 98660 PHONE: PHONE: FAX: FEES Description Date Specifics: Amount Sewer Connection Fee 10/19/2023 $6,824.00 Type of Use: SF Sewer Inspection-Residential 10/19/2023 $35.00 Class of Work: NEW Install Type: Line Tap and Building Sewer Fixture Units: Number of Dwelling Units: Total $6,859.00 Required Items and Reports(Conditions) This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR 952-001-0010 through OAR 952-001-0090. You may obtain a copy of the rules Issued By: Permiftee Signature: C;P Call 503.639.417 , y 7:00 a.m.for the next available inspection date. lief This permit card shall be kept in a conspicuous place on the job site until completion of the project. Approved plans are required on the job site at the time of each inspection.