Loading...
Permit (48) CITY OF TIGARD SEWER CONNECTION PERMIT 14 ! COMMUNIT Y DEVELOPMENT Permit#. SWR2023-00254 T r[;,1,R.D 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Date Issued: 10/20/2023 Parcel: 2S107AD05400 Jurisdiction: Tigard Site address: 14668 SW 165TH AVE Project: South River Terrace,Building 22,Unit 1 of 3 Subdivision: SOUTH RIVER TERRACE Project Description: Sewer connection for new attached dwelling. Lot: J Contractor: Owner: TAYLOR MORRISON NORTHWEST LLC 703 BROADWAY ST STE 710 VANCOUVER,WA 98660 PHONE: PHONE: FAX: • FEES Description Date Amount Specifics: Sewer Connection Fee Sewer Inspection-Residential 10/19/2023 $6,824.00 Type of Use: SF p 10/19/2023 $35.00 Class of Work: NEW Install Type: Line Tap and Building Sewer Fixture Units: Number of Dwelling Units: 1 Total $6,859.00 Required Items and Reports(Conditions) This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR 952-001-0010 through OAR 952-001-0090. You may obtain a copy of the rules Issued By: Permittee Signature: Call 5 3.639.4175 b :00 a.m.for the next available inspection date. This permit card shall be kept in a conspicuous place on the job site until completion of the project. Approved plans are required on the job site at the time of each inspection.