Loading...
Report 212 034405 Portland,Oregon V 1 5 TA Kansas City, Missouri —STRUCTURAL— September 7, 2023 Mr. Derek Wood RECEIVED Mountainwood Homes SEP 12 2023 Re: Letter in Response to Structural Alterations at the Single-Family Residence at CITY OF TIGARD 14357 SW 168t'Ave BUILDING DIVISION Tigard,OR 97224 Derek, At the single-family residence listed in the subject line above,there are proposed alterations to the back exterior wall on the upper level adjacent to the proposed 'Office'and 'Bedroom 2.' Please implement the following structural requirements: 1. At the new 3ft wide window, install a new 4x8 header w/single 2x king studs and trimmers each end.Where cut for the new window,fasten the existing wall sheathing panel edges with 8d @ 6"o.c. 2. Where the 6ft wide window is being replaced with a new 3ft wide window, partially infill frame the opening w/2x studs @ 16"o.c.and install new plywood or OSB wall sheathing with the same thickness as the existing sheathing(7/16" min.). Fasten the sheathing with 8d @ 6"o.c. along panel edges and 8d @ 12"o.c. at intermediate framing. See the attached calculations justifying the modifications. Our firm appreciates the opportunity to serve you. If you have any questions or if you need anything further, please feel free to contact us. At PROF. oj 459r 85273 e'\ _J OREGON ,,, IL 31, `v/ A 9/7/23 Sincerely, EXPIRES:8/30P204 Vista Structural Engineering, LLC Dennis Heier, P.E. Avery Morris, P.E.,S.E. VISTA STRUCTURAL ENGINEERING, LLC 11575 SW PACIFIC HWY#2262 PHONE: 971.233.6099 TIGARD, OREGON 97223 - 1 - VISTASTRUCTURAL.COM fi.,FORTEWER MEMBER REPORT PASSED Level,Wall: Header 1 piece(s)4 x 8 DF No.2 • Overall Length:3'3" t 0 p 3 I+ All locations are measured from the outside face of left support(or left cantilever end).All dimensions are horizontal. Design Results Actual 6/Location Allowed Result LDF Load:Combination(Pattern) System:Wall Member Reaction(Ibs) 815 @ 0 3281(1.50") Passed(25%) -- 1.0 D+0.75 L+0.75 S(All Spans) Member Type:Header Shear(Ibs) 449 @ 8 3/4" 3502 Passed(13%) 1.15 1.0 D+0.75 L+0.75 S(All Spans) Building Use:Residential Building Code:IBC 2021 Moment(Ft-Ibs) 662 @ 1'7 1/2" 3438 Passed(19%) 1.15 1.0 D+0.75 L+0.75 S(All Spans) Design Methodology:ASD Live Load Defl.(in) 0.004 @ 1'7 1/2" 0.108 Passed(L/999+) -- 1.0 D+0.75 L+0.75 S(All Spans) Total Load Defl.(in) 0.007 @ 1'7 1/2" 0.162 Passed(L/999+) -- 1.0 D+0.75 L+0.75 S(All Spans) • Deflection criteria:LL(L/360)and TL(L/240). •Allowed moment does not reflect the adjustment for the beam stability factor. •Applicable calculations are based on NDS. Bearing Length Loads to Supports(Ibs) Supports Total Available Required Dead Floor Live Snow Factored Accessories 1-Trimmer-DF 1.50" 1.50" 1.50" 303 195 488 815 None 2-Trimmer-DF 1.50" 1.50" 1.50" 303 195 488 815 None Lateral Bracing Bracing Intervals Comments Top Edge(Lu) 3'3"o/c Bottom Edge(Lu) 3'3"o/c •Maximum allowable bracing intervals based on applied load. Dead Floor Live Snow Vertical Loads Location Tributary Width (0.90) (1.00) (1.15) Comments 0-Self Weight(PLF) 0 to 3'3" N/A 6.4 -- -- 1-Uniform(PSF) 0 to 3'3" 12' 15.0 10.0 25.0 Roof Load Weyerhaeuser Notes Weyerhaeuser warrants that the sizing of its products will be in accordance with Weyerhaeuser product design criteria and published design values.Weyerhaeuser expressly disclaims any other warranties related to the software.Use of this software is not intended to circumvent the need for a design professional as determined by the authority having jurisdiction.The designer of record,builder or framer is responsible to assure that this calculation is compatible with the overall project.Accessories(Rim Board,Blocking Panels and Squash Blocks)are not designed by this software.Products manufactured at Weyerhaeuser facilities are third-party certified to sustainable forestry standards.Weyerhaeuser Engineered Lumber Products have been evaluated by ICC-ES under evaluation reports ESR-1153 and ESR-1387 and/or tested in accordance with applicable ASTM standards.For current code evaluation reports,Weyerhaeuser product literature and installation details refer to - www.weyerhaeuser.com/woodproducts/document-library. The product application,input design loads,dimensions and support information have been provided by AAM ForteWEB Software Operator Job Notes 9/7/2023 6:58:33 PM UTC Avery Morris Vista Structural Engineering,LLC ForteWEB v3.6,Engine:V8.3.1.5,Data:V8.1.4.1 (503)702-1393 avery@vistastructuraLmm Weyerhaeuser File Name: Dimastrodonato(Mtn Wd) Page 1/1 This is analysis of the original shear wall as a PSW with a i000#load applied. The demand to Perforated Shear Wall the wall is 79p1f. Job: 14357 SW 168th Ave • Client: Mountain wood Homes Area of house: Original Condition ▪ Tributary Area(Seismic) " Seismic Force(ELF,LRFD) Lateral Force(ASD Wind) 1000# 7/16"Panel w/Edge Fastener Spacing as noted with 12"intermediate spacing " Lateral Force(ASD Seismic-before irreg.factor)Fro=0.7*AEo*C,C,"W= # Irreg.Factor? (8d common or galvanized box nails)ASD Capacities Lateral Force(ASD Seismic) 0# 1.00 Seismic Wind Seismic Design Category D Edge nailing v Edge nailing v Sos 0.676 g 6 in. 240#/ft 6 in. 335#/ft MaximumAllowable H/W Wall Segment ratio: 3.5:1 ............_..._.__......_..._.._........__........_..............__......_..._..__..._........__................._..._......_..._..._.... ... 4 in. 350#/ft ........ 4 in...._"._... 0_#/ft,.,_.__.... Maximum Allowable Shear per sheathed face(Wind): 1218#/ft "- •"'•••••••"""'"'"" -..._. 2 in. 585#/ft 2 in. 63 820#/ft Maximum Allowable Shear per sheathed face(Seismic): 870#/ft ••••••••••"•_..........._.._.__.__._..._.__..._.__......_.._..._.._..._..._..._.._....._..._._..._..._..........._..._.... 2 in. 585#/ft 2 in. 820#/ft Faces of wall with APA-Rated sheathing: 1 Sheathed both faces Sheathed both faces Nominal width of wood wall: 6 in 6 in. 480#/ft 6 in. 670#/ft ................_._.......i....._..._.._._.._..._..._..._.__._.._..._..._..._..._..._._...._..._..._9._.._/f................ Width of stem wall: 6 in 4 in. 700#/ft 4 in. 80#/ft Verify3 in._._..._..._.._._ .._..........._._._........._......_......._..._...._.._____...._........1.._..._..._._..._..._.... 900#/ft 3 in. 1260#/ft 1)Full-width segment without opening at each end of shear wall? y "••••••_.__..........._..._......._..._......_..._..._..._......_......._..._...._............._...._..._.___..._......_..._..._._. 2 in. 1170#/ft 2 in. 1640#/ft 2)H/W Ratio of all segments within limitations? y 3)Top and bottom of entire wall have uniform elevations? YShear Wall Callout o on Plans: SE 4)Lateral force does not exceed maximum allowable shear? Y Hold-down Callout on Plans: N/A 5)Wall height is less than or equal to 20 feet Y Wall Height 8 ft Maximum Opening Clear Height 4 ft Reduced Length Overall Wall Length,Lid 22 ft H/W Ratio per SPDWS 4.3.4.3. Wall Segment#1 Length 2.92 ft 2.74 OK 2.13 ft Wall Segment#2 Length 13.08 ft 0.61 OK 13.08 ft Wall Segment#3 Length ft N/A OK N/A ft Wall Segment#4 Length ft N/A OK N/A ft Wall Segment#5 Length ft N/A OK N/A ft Wall Segment#6 Length ft N/A OK N/A ft EL. 16 ft 15.21 ft Unfactored Floor&Roof Dead Load: 180#/ft Unfactored Self Weight Wall Dead Load: 80#/ft OK TO PROCEED WITH DESIGN ASD Shear Capacity(Wind): V,=vCoEL, ASD Shear Capacity(Seismic): V,=vC01L, Anchor Bolts/Nails Required %full-height sheathing 69% %full-height sheathing 69% Minimum sill plate thickness: 2 x opening ratio: 50% opening ratio: 50% 1/2"dia.Anchor bolt capacity: 1040# Co 0.83 Co 0.83 5/8"dia.Anchor bolt capacity: 1488# Vw(from wall above) VEo(from wall above) # 16d common nail capacity: 226# q(Unadjusted ASD unit shear): -6#'. q(Unadjusted ASD unit shear): 0#/ft q'(=q/Co) 79#/ft q'(..q/Co) 0#/ft Total no.of 1/2"dia.Anchor bolts required: 1 Wind Shear Analysis: Total no.of 5/8"dia.Anchor bolts required: 1 7/16"APA-Rated Sheathing with 8d common or galvanized box nails at: All Panel Edges: 6"O.C. 1/2"dia.Anchor bolt spacing: 72"O.C. Intermediate Framing Members: 12"O.C. 5/8"dia.Anchor bolt spacing: 72"O.C. Wall Sheathing On: ONE FACE 16d common nail spacing: 43"O.C. Seismic Shear Analysis: Gross uplift force at ends of perforated shear wall: 634# 7/16"APA-Rated Sheathing with 8d common or galvanized box nails at: Applicable uplift force from wall above? # All Panel Edges: 6"O.C. Net uplift force at ends of perforated shear wall: -1082# Intermediate Framing Members: 12"O.C. Note:a negative net uplift force at ends denotes no hold-down required Wall Sheathing On: ONE FACE Hold-down required at ends on new foundation: None Required Capacity of 5/8"dia F1554 w/SET-XP,8"embed: 1330 # *Note:For walls sheathed on both faces with edge nail spacing less than Hold-down required at ends on existing foundation: None Required 6"OC,edge framing members shall be 3x or(2)2x nominal Floor-to-Floor strap required at ends: None Required Table 4.3.3.5(American Wood Council SDPWS) Number of 2x4's required at each end of wall: 2 Co Number of 2x6's required at each end of wall: 2 %full-height h/3 h/2 2h/3 5h/6 h 10% 1.00 0.69 0.53 0.43 0.36 over.,,%Mr,w,O,,, • 20% 1.00 0.71 0.56 0.45 0.38 30% 1.00 0.74 0.59 0.49 0.42 . " 40% 100 .............__077.._.._...__Ter-_.__._... 053 045 50% 1.00 0.80 0.67 0.57 0.50 ..._..._..._..._..._._...._..._..._....._...._.._.._.__.._.__._..._...__..._...._........_.._..._._."._.._..._..._..0._.__... ,SEGMENT 3.4.E., 60% 1.00 0.83 0.71 0.63 0.56 f S GM,"'' SI GM. '3 . •...70% 1.00 0.87 0.77 0.69 0.63 '. 80% 1.00 0.91 ,..._0:83_.._.._._ 7 0 0,71 90% 1.00 0.95 0.91 0.87 0.83 100% 1.00 1.00 1.00 too 1.00 Hold-down schedule -r.Noow..,,w Plan Mark Bracket Anchor Capacity(#) os enrc+c No hold-down N/A N/A 0 sLi HD-HDU2 HDU2-SDS2.5 SSTB24 3,075 _ ,,,4,1 HD-HDU4 HDU4-SDS2.5 SSTB24 4,565f.HD-HDU5 HDU5-SDS2.5 SSTB24 5,645 HD-HDU8 HDU8-SDS2.5 SB7/8x24 7,315 HD-HDQ8 HDQ8-SDS3 PAB7 9,230 HD-HHDQ11 HHDQ11-SDS2.5 PAB8 11,810 HD-HDU14 HDU14-SDS2.5 PAB8 14,445 e,,COmmRess,oN 31v_F-cawaRE,s cw xse • This is analysis of the proposed shear wall as a PSW with a 1000#load applied. The demand to Perforated Shear Wall Job: 14357 SW 168th Ave the wall is 83p1f. This increase is less than io%, Client: Mountainwood Homes , therefore the proposed window layout is Area of house: Proposed Condition + Tributary Area(Seismic) acceptable with no upgrades required. Seismic Force(ELF,LRFD) Lateral Force(ASD Wind) 1000# 7/16"Panel w/Edge Fastener Spacing as noted with 12"intermediate spacing • Lateral Force(ASD Seismic-before irreg.factor)FEo=0.7"AEa"C,C,,,W= # Irreg Factor? (8d common or galvanized box nails)ASD Capacities Lateral Force(ASD Seismic) 0# 1.00. Seismic Design Category DSeismic Wind Edge nailing v Edge nailing 9 v Sos 0.676 g 6 in. 240#/ft 6 in. 335#/ft Maximum Allowable H/W Wall Segment ratio: 3.5:1 4 ............_........_...._..._......._..._._...._.._._..._.............._..._...._..._.._..._.._._._..._................_.__..._.... 4 in. 350#/ft 4 in. 630#/ft Maximum Allowable Shear per sheathed face(Wind): 1218#/ft •••••--�_..._..............._.._......._..._..._................_......._.._...._.._._................_..._..._..._........_._.._..._ 2 in. 585#/ft 2 in. 820#/ft Maximum Allowable Shear per sheathed face(Seismic): 870#/ft ••••••..--. 2 in. 585#/ft 2 in. 820#/ft •••••••� Faces of wall with APA-Rated sheathing: 1 Sheathed both faces Nominal width of wood wall: Sheathed both faces 6 in 6 in. 480#/ft 6 in. 980#/ft 6 in Width of stem wall: ........................................................_..........._......._..._...._. _..............._...__._..._..........._..._....Venn/ ..........__..........-4in.........._.._700#/ft..._......_.._._...._...._..._4 in. 980#/ft 1)Full-width segment without opening at each end of shear wall? Y ...._. 3 in. 70#/ft 3 in. 1640#/ft 2)H/W Ratio of all segments within limitations? Y 2 in. 1170#/ft 2 in. 1640#/ft 3)Top and bottom of entire wall have uniform elevations? Y Shear Wall Callout on Plans: r SS 4)Lateral force does not exceed maximum allowable shear? Y Hold-down Callout on Plans: N/A 5)Wall height is less than or equal to 20 feet Y - Wall Height 8 ft Maximum Opening Clear Height 4 ft Reduced Length Overall Wall Length,L,+ 22 ft H/W Ratio per SPDWS 4.3.4.3. Wall Segment#1 Length 2.92 ft 2.74 OK 2.13 ft Wall Segment#2 Length 10.17 ft 0.79 OK 10.17 ft Wall Segment#3 Length 2.92 ft 2.74 OK 2.13 ft Wall Segment#4 Length ft N/A OK N/A ft Wall Segment#5 Length ft N/A OK N/A ft Wall Segment#6 Length ft N/A OK N/A ft £L' 16.01 ft 14.43 ft Unfactored Floor&Roof Dead Load: 180#/ft Unfactored Self Weight Wall Dead Load: 80#/ft OK TO PROCEED WITH DESIGN ASD Shear Capacity(Wind): V.=vColL; ASD Shear Capacity(Seismic): V.=vCoE4 Anchor Bolts/Nails Required full-height sheathing 66% %full-height sheathing 66% Minimum sill plate thickness: 2 x opening ratio: 50% opening ratio: 50% 1/2"dia.Anchor bolt capacity: 1040# Co 0.83 Co 0.83 5/8"dia.Anchor bolt capacity: 1488# Vw(from wall above) # VE0(from wall above) # 16d common nail capacity: 226# q(Unadjusted ASD unit shear): q(Unadjusted ASD unit shear): 0#/ft Total no.of 1/2"dia.Anchor bolts required: 1 Wind Shear Analysis: Total no.of 5/8"dia.Anchor bolts required: 1 7/16"APA-Rated Sheathing with 8d common or galvanized box nails at: All Panel Edges: 6"O.C. 1/2"dia.Anchor bolt spacing: 72"O.C. Intermediate Framing Members: 12"O.C. 5/8"dia.Anchor bolt spacing: 72"O.C. Wall Sheathing On: ONE FACE 16d common nail spacing: 43"O.C. Seismic Shear Analysis: Gross uplift force at ends of perforated shear wall: 668# 7/16"APA-Rated Sheathing with 8d common or galvanized box nails at: Applicable uplift force from wall above? # All Panel Edges: 6"O.C. Net uplift force at ends of perforated shear wall: -1048# Intermediate Framing Members: 12"O.C. Note:a negative net uplift force at ends denotes no hold-down required Wall Sheathing On: ONE FACE Hold-down required at ends on new foundation: None Required "Note:For walls sheathed on both faces with ed a nail s acin less Capacity of 5/8"dia F1554 w/SET-XP,8"embed: 1330 # 9 P 9 than Hold-down required at ends on existing foundation: None Required 6"OC,edge framing members shall be 3x or(2)2x nominal Floor-to-Floor strap required at ends: None Required Table 4.3.3.5(American Wood Council SDPWS) Number of 2x4's required at each end of wall: 2 Co Number of 2x6's required at each end of wall: 2 %full-height h/3 10% 1.00 0.69 0.53 0.43 0.36 ovOa,uLw,,;.,.MO, 20% .....__...._.._..._..._.. ..._.._... 1.00 0.71 0.56 0.45 0.38 :. 30% 1.00 074 059 049 0.42 ,- ' + 40% 1.00 •0.77 063 0.53 0.45 .....___..._._.._..._.__....... ..._...__. 50% 1.00 0.80 0.67 0.57 0.50 + 60% 100 083 0.71 063 0.56 :- sec,+.eKr, r sea e. ...erc ..._......_. .._..._..._._.... ....._._... 70% 1.00 0.87 0.77 0.69 0 .63 .. 80% 1.00 0.91 0.83 0.77 0.71 90% 1.00 0 95 •0.91 0 87 • 0.83 100% 100 1.00 100 1.00 100 Hold-down schedule z _; wwo Plan Mark Bracket Anchor Capacity(#) it # c; No hold-down N/A N/A 0 HD-HDU2 HDU2-SDS2.5 SSTB24 3,075 "au .vvxx+ 2 ,w"c HD-HDU4 HDU4-SDS2.5 SSTB24 4,565 HD-HDU5 HDU5-SDS2.5 SSTB24 5,645 HD-HDUB HDU8-SDS2.5 SB7/8x24 7,315 0 HD-HDQ8 HDQ8-SDS3 PAB7 9,230 HD-HHDQ11 HHDQ11-SDS2.5 PAB8 11,810 HD-HDU14 HDU14-SDS2.5 PAB8 14,445 w.: cevaaess,vw _ ..___A cane ,JP,,,,CaA4erxess,w