February 9,2024
Project 3403.23(10975)
Foundation First NW,LLC
Attn: Joe Smith
Re: Footing underpinning with helical pile @ 10975 SW Hall Blvd.,Portland,OR,97223
Subject: Final Summary Report of Soil Special Inspections.
The purpose of this letter is to provide final summary of soil special inspections completed for the above
referenced project. As required in Part A of the Soils Special Inspection Program,the following soils
special inspections were completed in accordance with IBC Chapter I 7 Section
I 705.6 Soils for the above referenced project:
I. Helical piles installation for stabilization of existing footings
HUE previously submitted inspection report for the above-required special inspections to the client
representative.Based on our field inspections and test results,the project was constructed in general
accordance with design specifications and our recommendations.
We appreciate the opportunity to assist you on this project.If you have any questions or would like
additional information,please feel free to contact the undersigned at 503-892-2000.
Hydro Geo&Environmental,Inc.
Mikhail P.Golberg,C.E.G
Principal Engineering Geologist
•(or i
ji
klitiPil
cc: Washington County
IAS
sna.oar. ACCREDITED" Expansion Anchors Special Inspection
Report Date 1/30/2024
�zs�
Date Inspected 1/25/2024
Client FOUNDATIONS FIRST Project No 24-4111
Address FOUNDATIONS FIRST-NO WES Client Reference No Permit#MST2023-00602
16869 65TH RD
Lake Oswego OR, 97035 Code Inspected To IBC
Permit Number MST2023-0060
Project Sherwood, Larry 24-4111
Item Inspected Location(s) Elevation
1 Wedge anchors
2
Area of Concern Accept Comments
Report
ANCHOR QUALITY/DOCUMENTATION•Approved submittals•MFG ACCEPT 1/2"Simpson strong bolt2
cert
HOLE PREPARATION•Diameter and Depth•Cleanliness-Blown ACCEPT Hole diameter 1/2"
Brushed Blown w/Compressed air Hole depth 3-1/2"
INSERTION/SEATING PROCESS•Torque Testing ACCEPT Torque tested to ESR requirements.
Weather Inspection Duration
Temperature Acceptance Decision Pass
Schedules/Details Details on S1.01
/RFI Referenced
Remarks ACS representative arrived onsite to perform installation torque inspection of wedge anchors installed into
brackets.The anchors are installed per the approved plans and ESR specifications.
Also observed load testing on two helical anchors on wall 1 and one anchor on wall 2.All helical anchors proof
tested displayed no movement during the test.
Inspector Wesley Brown Manager Fred Puckett
Digital Signature By User Login Digital Signature By User Login
Inspector Cert Wesley Brown AWS QC1 Manager Cert Jerry Frampton ICC Master
System Link http://acstesting.vahalo.com/assignments/1DEB5CAE-ADA8-4E77-72C3-04F1A9C902D6
System Path Sherwood,Larry 24-4111/EXPANSION/SCREW ANCHORS/24-4111 InspExpanAnchors WB240125-1
1/30/2024 8:07:57 AM 1
•
• Hydro Geo&Environmental,Inc
• 8525 SW 671h Ave.,
• Portland,OR 97223
••
Phone:503.892.2000
• Fax:503.246.6021
• e-mail:hydrogeo@comcast.net
Hydro Geo & Environmental Inc.
February 9,2024
Project 3403.23(10975)
Foundation First NW,LLC
Attn: Joe Smith
Re: Footing underpinning with helical pile @ 10975 SW Hall Blvd.,Portland,OR,97223
Subject: Final Summary Report of Soil Special Inspections.
The purpose of this letter is to provide final summary of soil special inspections completed for the above
referenced project. As required in Part A of the Soils Special Inspection Program,the following soils
special inspections were completed in accordance with IBC Chapter I 7 Section
I 705.6 Soils for the above referenced project:
I. Helical piles installation for stabilization of existing footings
HGE previously submitted inspection report for the above-required special inspections to the client
representative.Based on our field inspections and test results,the project was constructed in general
accordance with design specifications and our recommendations.
We appreciate the opportunity to assist you on this project. If you have any questions or would like
additional information,please feel free to contact the undersigned at 503-892-2000.
Hydro Geo& Environmental,Inc.
Mikhail P. Golberg, C.E.G
Principal Engineering Geologist
N.,,G
cc: Washington County
- O U N COATI O N S
I Rs Tit,
�.a.n \ r,R I It H t:n 1
t
Drive Log
Name Address
Larry Sherwood 10975 Southwest Hall Boulevard Tigard OR 97223
Sold By Engineer
Todd Hammond Miller Consulting Engineers
Installer Permit#
Connor Robinson
Lead Depth PSI Extension Depth PSI Extension Depth PSI Extension Depth PSI Extension Depth PSI Extension Depth PSI
Pile 5 1700 10 1750 15 1750 20 1750 25 1750 30 1750
Pile2 35 1750 40 1750 45 1750 50 1750 55 1750
Pile3 60 1800 65 1800 70 2000
Pile 5 1700 10 1700 15 1700 20 1700 25 1700 30 1700
Piles 35 1700 40 1700 45 1700 Si) 1700 55 1700
Abe 60 1700 65 1800 70 2000
Pile? 5 1700 10 1700 15 1750 20 1750 25 1800 30 1800
Abe 35 2000
Pile e
Pile 10
Pik 11
Pik 12
1+== OUNDATIONS
IRST \ (.ArtiIft , ,
Drive Log
Name Address
Larry Sherwood 10975 Southwest Hall Boulevard Tigard OR 97223
Sold By Engineer
Todd Hammond Miller Consulting Engineers
Installer Permit#
Connor Robinson
Lead Depth PSI Extension Depth PSI Extension Depth PSI Extension Depth PSI Extension Depth PSI Extension Depth PSI
Pilot 5 1700 10 1700 15 1700 20 1700 25 1700 30 1700
Pile 35 1700 40 1700 45 1700 50 1700 55 1700
Pea 60 1700 65 1700 70 1700 75 1700 80 1700
Plea 85 1700 90 1800 95 1900 100 2000
Piles 5 1700 10 1700 15 1700 20 1700 25 1700 30 1700
Piles 35 1700 40 1700 45 1700 50 1700 55 1700
Pile? 60 1700 65 1700 70 1700 75 1700 80 1700
Pile8 85 1700 90 1800 95 2000
Pile 5 1700 10 1700 15 1700 20 1700 25 1700 30 1700
Pileme 35 1700 40 1700 45 1700 50 1700 55 1700
Pile 11 60 1700 65 1700 70 1700 75 1700 80 1700
Pilera 85 1700 90 1850 95 2000
=* C U N DAT I O N S
j_.. IRST0'�� 51Rhhtllt > f �'
t
Drive Log
Name
Address
Larry Sherwood 10975 Southwest Hall Boulevard Tigard OR 97223
Sold By Engineer
Todd Hammond Miller Consulting Engineers
Installer Permit#
Connor Robinson
lead Depth PSI Extension Depth Psi Extensor Depth PSI Extension Depth PSI Extension Depth PSI Extension Depth PSI
Pifer 5 1500 10 1700 15 1700 20 1700 25 1700 30 1700
Pile 40 1800 45 1700 50 1700 55 1700 60 1700
Pile3 65 1700 70 1800 75 1800 80 1700 85 1700
Pine 90 1800 95 1800 100 2000
PHs5 5 1700 10 1700 15 1700 20 1700 25 2000
Pima 5 7700 10 1700 15 1700 20 1700 25 2000
Pile 7 5 1700 10 1700 15 1700 20 1700 25 2000
Pilea 5 1700 10 1700 15 1700 20 1700 25 1700 30 1700
Pima 35 1700 40 1700 45 1700 50 1700 55 1700
Pinto 60 1900 65 2000
Pile it 5 1700 10 1700 15 1700 20 1700 25 1700 30 1700
Plm12 35 1700 40 1700 45 1700 50 1700 55 1700
60 1700 65 1700 70 1700 75 1800 80 2000
Inspection Report
Location: Inspection Date:
10973 SW HALL BLVD,TIGARD, OR 97223 26 January 2024 at 12:14 PM
Record Type: Record ID:
Residential-Master Permit MST2023-00602
Inspection Type: Inspector:
205 Footing Rick Stark
Result:
PASS
Comments:
Violation Summary:
Inspector Responsible party
•
8525 SW 67' Avenue
•
Portland,OR 97223
•
Phone:503.892.2000
•
Fax:503.246.6021
•
e-mail:hydrogeo@comcast.net
Hydro C & Environmental Inc.
,
FIELD REPORT PAGE 1 OF 1
DATE 1/22/24
PROJECT NAME CLIENT/OWNER HYDRO GEO PROJECT NO.
3403.23(10975)
Re: Existing duplex stabilization @ 10975 SW Larry Sherwood residence
Hall Blvd.,Tigard,Oregon 97223
GENERAL CONTRACTOR GENERAL CONTRACTOR SUPERINTENDENT HYDRO-GEO FIELD ENGINEER/AUTHOR
Foundation First NW,LLC Jacob Golsen Mike Golberg
GRADING CONTRACTOR GRADING CONTRACTOR FOREMAN HYDRO-GEO PROJECT MANAGER
Connor Mike Golberg
WORK DESCRIPTION EQUIPMENT
Hand digging of pits around the footing Hydraulic system station for pile installation
Helical Pile Installation WEATHER
Overcast,cold,windy
NOTES:DESCRIBE WORK COMPLETED FIELD OBSERVATIONS AND RECOMMENDATIONS
Left office at 8:30 am at General contractor request. Arrived on site at 10975 SW Hall Blvd, Tigard, OR at 9:00 am,to check
performance of helical pile installations.Meet Connor with the crew of 3 on site. They completed just one pile(pile# 1)by the
time I arrived on site. One of total of 12 piles was already installed at the northeast corner of the building,just next to the creek.
The fast running local creek full with water generating from recent heavy rain&snow events, evidently impacted driving of pile
# 1 to a depth of 100 feet below the sutface. The creek was running just 5 feet away from pile # 1. The spacing between two
piles is 6-7 as designed. The pothole for the next pile#2 was excavated to a depth of aprox 24"below the current grade. The
footing was exposed in the pothole at the depth of 10"below current grade. Witnessed the installation of pile#2 at the northern
wall of the builkding. The helical pile#2 was installed to a depth of 25 feet in my presence. The torque reading while driving
pile extensions was approx. 1700,but lockup has reached a maximum of 1950 ft-lb at the depth of 25 feet.
Returned to the office at 11:00 am.
HYDRO-GEO ENGINEERING REPRESENATIVE(PRINT) DATE HOURS HYDRO-GEO ENGINEERING REPRESENATIVE(SIGNATURE)
Mike Golberg 1/22/24 2.5