1 "RIVER TERRACE TOWN CENTER"
LOT 82
HUB AND TACK CERTIFICATION
SE 1/4 SEC. 6, T 2 5, R 1 W. W.M.
CITY OF TIGARD, WASHINGTON COUNTY, OREGON
SURVEYED JANUARY 2, 2024
, PREPARED FOR:
I THE NEW HOME COMPANY
I 15455 NW GREENBRIER PKWY,
I SUITE 240
BEAVERTON, OR. 97006
I 81
I
-0
0
S r,i
•6'3.
..4", S89•59'44"E i 80.00'
Id
01 b D
0 Z
45 i— I csi 1 - --ri- C•i LI./
3- C.) rf) I r) >
1 cr< .o(:)'---•— ....__ < I
F— Lai
82 +•-19.00' . a I—
(•/ (0 in
I CO
‘-
cst 9
I 5)
csi 0 V)
cv 0
0 dors 1 0
e Z '""--/9.24
si I
0, t;SA.' N89•59'441'W t 80.00'
co P• -0
0
LJJ 3.00' PUBLIC ---...
lll t'i
X UTILITY 4,,,,--8.00' PUBLIC
tn
EASEMENT UTILITY
0) EASEMENT
3 I
-0
.0 1 1
15 " 83
o
t: I REGISTERED
a)
u i PROFESSIONAL
..- LAND SURVEYOR
x
vi -I
a. I N...___ I I
1 OREGON
JULY 9, 2002
>. L TRAVIS C. JANSEN
57751
_ —
y,
.0
o RENEWS: 6/30/2025
a
..E. I, TRAVIS C. JANSEN, A REGISTERED PROFESSIONAL LAND SCALE
??.. SURVEYOR IN THE STATE OF OREGON, HEREBY CERTIFY THAT 20 0 10 20
o I HAVE ACCURATELY SURVEYED AND STAKED THE P.MilliFielligillii.
9 FOUNDATION ENVELOPE FOR LOT 82 OF PLAT OF "RIVER 1 INCH = 20 FEET
L)3 TERRACE TOWN CENTER".
t f
7 DRAWN BY: TRK DATE:01/22/24
.15:. PACIFIC COMMUNITY DESIGN
a!. REVIEWED BY: FAM DATE:01/22/24
PLANNING - ENGINEERING - SURVEYING
Z
, PROJECT NO.: 148-005
._ (503) 941-9484
N V 5
FIELD REPORT
Page 1 of 1
Project: NewHome-5-02 Prepared By: Luke McClatchey
Project Name: River Terrace Town Center Date: 01/02/24
Location: SW Roy Rogers Road Report#: 134
Tigard, Oregon
Arrival: 0950 Departure: 1015
Weather: Raining, 40s Permit#:
Site Visit Requested By: Frank (New Home) Met With (on-site): Sam (New Home)
Purpose: Lots 82 Subgrade
Outstanding Issues:
Lot Subgrade
Upon arrival, I was informed by Frank with New Home that crews had prepared subgrade for lot 82. I probed
the exposed subgrade using a%-inch-diameter steel foundation probe. Exposed subgrade visually consisted of
brown silt with areas covered by approximately 2-3 inches of 3/4"-0 crushed rock. Resulting penetrations indicated
the exposed subgrade at probed locations is medium stiff to stiff. Some areas of the exposed lot subgrade had 1-3"
of standing water. At the time of observation, the subgrade in areas with standing water was stiff, but we
recommend prior to further development of the lot the areas should be dewatered and that any muck(soft and
saturated soil) should be scraped away to expose firm subgrade.
Conclusion
Based on our observations and probing, it is our opinion that subgrade observed today, as indicated on the
attached site plan, has been prepared in general accordance with project requirements and our geotechnical
recommendations.
Distribution:
Attachments: Site plan (1)
Reviewed by: HDG
This report presents opinions formed as a result of our observation of activities relating to geotechnical engineering or environmental services. We rely on the contractor to comply with the plans and
specifications throughout the duration of the project irrespective of the presence of our representative. Our work does not include supervision or direction of the contractor,the contractor's employees
or agents. Our firm is not responsible for site safety.This field report is a DRAFT representation of our field observations,testing,and preliminary recommendations. The report can only be
considered final upon review of the NV5 project manager,as indicated by initials in the"Reviewed By"section.
Signature: Luke McClatchey