Loading...
Permit (3) IL CITY OF TIGARD MASTER PERMIT 'rl ' . COMMUNITY DEVELOPMENT Permit#: MST2023-00492 T I(i A R 1) 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Date Issued: 10/10/2023 Parcel: 2S 103DC05400 Jurisdiction: Tigard Site address: 13800 SW 115TH AVE Subdivision: VIEWMOUNT Lot: 42 Project: Rivera Project Description: Rooftop solar PV system 12.6 kW. BUILDING Floor Areas Required Setbacks Required Stories: 0 Bedrooms: 0 First: 0 sf Basement: 0 sf Left: 0 Parking Spaces: 0 Height: 0 Bathrooms: 0 Second: 0 sf Garage: 0 sf Front: 0 Smoke Dwelling Units: 0 Third: 0 sf Right: 0 Detectors: Total: 0 sf Value: $11,368.00 Rear: 0 PLUMBING Sinks: 0 Water Closets: 0 Washing Mach: 0 Laundry Trays: 0 Rain Drain: 0 Urinals: 0 Lavatories: 0 Dishwashers: 0 Floor Drains: 0 Sewer Lines: 0 SF Rain Drains: 0 Storm Sewer: 0 Tubs/Showers: 0 Garbage Disp: 0 Water Heaters: 0 Water Lines: 0 Catch Basins: 0 Footing Drain: 0 Ice Maker: 0 Hose Bib: 0 Backwater Value: 0 Bckflw Prevntr: 0 Drywell-Trench Drain: 0 Other Fixtures: 0 Other Fixture Units: MECHANICAL Fuel Types Air Conditioning: N Vent Fans: 0 Clothes Dryers: 0 Heat Pump: N Hoods: 0 Other Units: 0 Furn<100K: 0 Vents: 0 Woodstoves: 0 Gas Outlets: 0 Furn>=100K: 0 ELECTRICAL Residential Unit Service Feeder Temp Srvc/Feeders Branch Circuits 1000 sf or less: 0 0-200 amp: 0 0-200 amp: 0 W/Svc or Fdr: 0 Ea add l 500 sf: 0 201-400 amp: 0 201-400 amp: 0 W/O Svc/Fdr: 0 Mfd Home/Feeder/Svc: 0 401-600 amp: 0 401-600 amp: 0 601-1000 amp: 0 601+amp-1000v: 0 1000+amp/volt: 0 ELECTRICAL-RESTRICTED ENERGY SF Residential Audio&Stereo: N HVAC: N Security Alarm: N Vaccuum System: N Garage Opener: N All N Other: Y Other Description: Rooftop solar array 12.6 kW Ecompasing: BUILDING INFO Class of Work: Type of Use: Type of Constr: Occupancy Group: Square Feet: OTR SF VB R-3 0 Owner: Contractor: RIVERA,ROBERT K AND BRS FIELD OPS LLC Required Items and Reports(Conditions) GEORGENIA H 1403 NORTH RESEARCH WAY 13800 SW 115TH OREM,UT 84097 TIGARD,OR 97223 PHONE: PHONE: 855-205-2530 FAX: Total Fees: $351.19 This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days. ATTENT IN: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR ac ..nnLnnl n thrn.in..clA- 0c9-nnLnnonn�� '%vnni i nip,.rnnu of them re!lac nr iiirart no oactinne to rm M(:h,raiiinn 5n1 919 10A7 nr 1 Ann 2Z9 9144 Issued By: �/''1 Permittee Signature: 7 t' r`�p ( t G:'t l'rbr) joy Call 503.639. 75 by 7:00 a.m.for the next available inspection date. This permit card shall be kep in a conspicuous place on the job site until completion of the project. Approved plans are required on the job site at the time of each inspection. liAuildin2 Permit Application Residential FOR OFFICE USE ONLY City of Tigard Received (I I l ^ I 1 v Pt P PI SI Ui i 4' .1 DateBy: U� 1 (I Permit No.: �f 1hone SW Hall Blvd.,Tigard,OR toCEIVED Py�Review (JJ( Phone: 503.718.2439 Fax: 503. DateBy: `� Z/Z Other Permit: l !CARD Inspection Line: 503.639.4175 Date Ready/By: /// ® See Page 2 for Internet: www.tigard-or.gov Notified/Method: I I I if • g J is.p SupplementalInformation SEP 1 9 2021 1 ❑New construction SOIEBM`DIVISION Permit fees*are based on the value of the work performed. Indicate the value(rounded to the nearest dollar)of all ❑Addition/alteration/replacement ❑Other: equipment,materials,labor,overhead,and the profit for the 1 w a ; s •, r p �' work indicated on this application. ❑ 1-and 2-family dwelling ❑Commercial/industrial Valuation: $ $11,367.72 ClAccessory building ❑Multi-family Number of bedrooms: ❑Master builder ❑Other: Number of bathrooms: , �, ,t, Total number of floors: Job site address: 13800 SW 115th Ave,Tigard,Oregon,97223 New dwelling area: square feet City/State/ZIP: Garage/carport area: square feet Suite/bldg./apt.no.: Project name: Robert Rivera Covered porch area: square feet Cross street/directions to job site: Deck area: square feet Other structure area: square feet 1. Subdivision: Lot no.: Permit fees*are based on the value of the work performed. ` Tax map/parcel no.: Indicate the value(rounded to the nearest dollar)of all r• F -, a ,r r equipment,materials,labor,overhead,and the profit for the r x f ', *( , / 1" ° work indicated on this application. Rooftop Solar PV Valuation: $ Existing building area: square feet New building area: square feet ' ai • Number of stories: Name: Robert Rivera Type of construction: Address: 13800 SW 115th Ave,Tigard, Oregon,97223 Occupancy groups: City/State/ZIP: Existing: Phone:( ) Fax ( ) rr: rn % r f f New: 4. z ,,,f .a ✓':'''.. ;'''''' •j�'��,;.r�N",`,,.�'.;', a :4, 4 r>> .F'',`yyr ''''�' P ,,,,, `,Y''�i'`x,�iI'•" e7 ' '" „,, de, Business name: BRS Field Ops, LLC off = fx Contact name: Diana Sanchez Structural plan review fee(or deposit): Address: 1403 N Research Way FLS plan review fee(if applicable): City/State/ZIP: Orem, UT 84097 Total fees due upon application: Phone:( 385)482-0045 Fax::( ) Amount received: / ?r r 7 ? cp '•• •, r ' , 1, f , E-mail: permittingde arment@blueravensolarcom r `�, � yf•'.r Y, 11,t?rlf 1: ?.. . ','•,g..P: ,.r'�:.;;r't ,,•'6`f jee:, , /f"....' `,-n...',,'a' ,t'I ,r.� '�4��' � `��'r�r'�f ���r�� 'r ��� �� •�:; ��: � �.� �,� rr,r,,, s� �, ,,,�`, Commercial and residential rescri tive installation of ,r,`' 4.7, ` :mow •,,, , . ,,,,d p„.;o y ,i t `.r r mr04 roof-top mounted PhotoVoltaic Solar Panel System. Business name: BRS Field Ops, LLC Submit two(2)sets of roof plan with connection details Address: 1403 N Research Way and fire department access,along with the 2010 Oregon Solar Installation Specialty Code checklist. City/State/ZIP: Orem, UT 84097 Permit Fee(includes plan review $180.00 and administrative fees): Phone:( 385)482-0045 Fax:( ) State surcharge(12%of permit fee): $21.60 CCB lic.: 227185 Total fee due upon application: $201.60 Authorized signature: This permit application expires if a permit is not obtained .0taaa ISaat t e Permitting Coordinator within 180 days after it has been accepted as complete. Print name: Diana Sanchez Date: 09/18/2023 *Fee methodology set by Tri-County Building Industry Service Board. I:\Building\Permits\BUP-RESPennitApp.doc 02/24/2011 440-4613T(11/02/COM/WEB) Electrical Permit Application FOR OFFICE USE ONLY _ City of Tigard Received Date/By: Permit#: .,- ,t ll 13125 SW Hall Blvd.,Tigard.OR 97223 Plan Review Related Permit#: iC" Phone: 503.718.2439 Fax: 503.598.1960 Date/By: Inspection Line: 503.639.4175 Ready Date/By: Iuris: WI See Pa, 2 for I I+.i\I.[ .ternet: www trgard-or goy Notified/Method: Suppleme tal Information WARVINIAXM:.' r 4 , , ;rar ..5.,. d; t: J .. . . .., ',..,sue Please check all that apply(submit 2 sets of plans wt tems checked): El New construction El Addition/alteration/replacement ❑Service or feeder 400 amps or more 0 Buil..ng over three stories. ❑Demolition ❑Other: where the available fault current 0 M nas and boatyards. ,���g shy '" “I' s' t t:t,1 's, exceeds 10,000 amps at 150 volts or ❑F.ating buildings. ESTLtan" '",i .x'gi xx ":illt.zW ti;d: ''�` ..` less to ground,or exceeds 14,000 IN ommerciat-use agricultural El 1-and 2-family dwelling \ Commercial/industrial ❑Accessory building amps for all other installations, buildings. ❑Multi family ■ aster builder 0 Other: 0 Fire pump. •Installation of 150 KVA • y ;f � ;_ ro� sr £g r ?, 7��-e.,e"�r�y""' y`y &3 44' ,t' .Y-5 "'' , .,., ❑❑Emergency new motor load of derived or 1 merge n larger separately nu >« ,,'„5,,.,.,Z,,x x y ,..„.,.!`,.'4';;44. ^4..r...,,:z.,:.:,bw.7.1 Wit . ,.. ,.,4,:' Addition system. Job#: Job site addre : 13800 SW 115th Ave,Tigard, Oregon, 97.2' lOOHP or more ❑ °A","E", `i-2","1-3", 0 Six or more residential units. occupancy. City/State/ZIP: 0 Health-care facilities. 0 Recreational vehicle parks. Suite/bldg./apt.#: I Project nai •: Robert Rivera ❑Hazardous locations. 0 Supply voltage for more than 0 Service or feeder 600 .s or more 600 volts nominal. Cross street/directions to job site: , a .0 r, * lral Description Qty. Each Total New residential s'I gle-or multi-family dwelling unit. Subdivision: Lot#: Includes attach•d garage. 1,000 sq.ft.or -ss 168.54 4 Tax map/parcel#: Ea.add'150o sq.ft.or portion 33.92 1 ss;b; M ''` &`elm Limited- -rgy,residential 75.00 2 (with..ove sq.ft.) Rooftop Solar PV Limit-.,energy,multi-family IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIrMIMMIM r rdential(with above sq.ft.) 75.00 2 ,. R: ewable Enerl ❑ See Pale 2 fligex .14.w a - r€4,), rrvices or feeders installation,alteration,and/or relocation Name: Robert Rivera lir, /200 amps or less 100.70 2 201 amps to 400 amps 133.56 2 Address: 13800 SW 115th Ave,Tigard,Oregon,97223 401 amps to 600 amps 200.34 2 City/State/ZIP: A 601 amps to 1,000 amps 301.04 2 Phone:( ) Fax:( ) Over 1,000 amps or volts 552.26 2 Temporary services or feeders installation,alteration,and/or Email: relocation Owner installation:This installation is being made on property that I own ''ch is not 200 amps or less 59.36 1 intended for sale,lease,rent,or exchange,according to ORS 447,449.670 I.„ 701. 201 amps to 400 amps 125.08 2 Owner signature: Date: 401 amps to 599 amps 168.54 2 Branch circuits—new,alteration,or extension, .er .anel t 8 s 1 1 V' , '' " A.Fee for branch circuits with Business name: BRS Field Ops, LLC above service or feeder fee, 7.42 2 each branch circuit Contact name: Diana Sanchez B.Fee for branch circuits without service or feeder fee,first 56.18 2 Address: 1403 N Research Way branch circuit City/State/ZIP: Orem, UT 84097 Each add'l branch circuit 7.42 2 Miscellaneous(service or feeder not included) ( Each manufactured or modular Phone: 385)482-0045 Fax: .( ) 67.84 2 dwelling,service and/or feeder Email: permitting.department@blueravensolar om Reconnect only 67.84 2 n $4:- y / s' w a :,1 .;, y .p or irrigation circle 67.84 2 Business name: BRS Field Ops, LLC AIIIIIIIIIIIIIIIIIIIIIIIMII Si ' or outline lighting 67.84 2 Sig'o1 circuit(s)or limited-energy El See Page 2 2 Address: 1403 N Research Way panel,, Iteration,or extension. Each:•ditional inspection over allowable in any of the above City/State/ZIP: Orem,UT 8409 Addition: inspection(1 hr min) 66.25/hr Phone:( 385) 482-0045 Fax:( ) Investigatii. (1 hrmin) 90.00/hr Industrial pl..t(1 hr min) 78.18/hr Email: permitting.depa ent@blueravensolar.com Inspections fo which no fee is 9000/hr 227185 Electrical L•c.: C1493 Suprv.Lic.: 6394S specifically list (�/2 hr min) CCB Lic.: < 'r/ As rs f, Suprv.Electrician: gnature,required:—1 Irr W T Subtotal: Print name: an Whittaker Date: 09/18/2023 0 Plan Review Re.uired(25%of permit fee): State Burch ge(12%of permit fee): OTAL PERMIT FEE: Authoriz•i signature: Make? Qu(; Permitting Coordinator This permit application expires if a permit is not obtained within 180 Print r.me: Diana Sanchez Date: 09/18/2023 days after it ha§;been accepted as complete. * Number of inspections allowCtl per permit. I:d3ti i tog;Permits\ELC_PermitApp_ELR ERE.doe Rev 06/17/2015 440-4615T(I1,05,COM/\VEB \ Electrical Permit Application RECEIVE FOR orrlCr tISE O lX A City of Tigard Received 4 SEP 19 2023 DateB : Perm"': MS ��1/ 'Q q� 13125 SW Hall Blvd.,Tigard,OR 97223 Plan Review i I Phone: 503.718.2439 Fax: 503.598.1960 DateB': Related Permit#: II -"1) Inspection Line: 503.639.4175 CITY OF TIGARD Ready DateBy: Juris: La See Page 2 for Internet: www tigazd or gov B ' , ,I • Notified/Method: Supplemental information Y ...ram � Y" E ,..5:`r_ ✓ � t � � _ ❑New construction ®Addition/alteration/replacement Please check all that apply(submit 2 sets of plans w/items checked). ❑Demolition 0 Other: ❑Service or feeder 400 amps or more ❑Building over three stories. where the available fault current 0 Marinas and boatyards. st l.b 3.', .a' ! lJ'M e.t ,r p•` exceeds 10,000 amps at 150 volts or ❑Floating buildings. 0 1-and 2-family dwelling 0 Commercial/industrial 0 Accessory building less to ground,or exceeds 14,000 ❑Commercial-use agricultural amps for all other installations. buildings. ❑Multi-family ❑Master builder ❑Other: ❑Fire pump. 0 Installation of 150 KVA or ," "II. A 1 't r M -."a 1 e4.c q 11' a t4 r _,ar l' ❑Emergency system. larger separately derived Job#: Job site address: 13800 SW 115th Ave, Tigard, Oregon, 97223❑Addition of new motor load of system. g g 100HP or more. ❑"A","E","1-2","1-3", City/State/ZIP: ❑Six or more residential units. occupancy. ❑Health-care facilities. 0 Recreational vehicle parks. Suite/bldg./apt.#: I Project name: Robert Rivera 0 Hazardous locations. 0 Supply voltage for more than ❑Service or feeder 600 amps or more. 600 volts nominal. Cross street/directions to job site: I"..: Description Qty. Each Total * New residential single-or multi-family dwelling unit. Subdivision: I Lot#: Includes attached garage. Tax map/parcel#: 1,000 sq.ft or less 168.54 4 Ea.add'1500 sq.ft.or portion 33.92 1 sz i$2d1:%M(l .4 , tat 8. } ,, .. a �, Limited energy,residential RooftopSolar PV 75.00 2 (with above sq.ft.) Limited energy,multi-family residential(with above sq.ft.) 75'00 2 �' _+r,r + ,. �;R.� = �_,-b a Renewable Energy ❑ See Page 2 Services or feeders installation,alteration,and/or relocation Name: Robert Rivera 200 amps or less 100.70 2 Address: 13800 SW 115th Ave,Tigard,Oregon,97223 201 amps to 400 amps 133.56 2 401 amps to 600 amps 200.34 2 City/State/ZIP: 601 amps to 1,000 amps 301.04 2 Phone:( ) I Fax:( ) Over 1,000 amps or volts 552.26 2 Email: Temporary services or feeders installation,alteration,and/or relocation Owner installation:This installation is being made on property that I own which is not 200 amps or less 59.36 1 intended for sale,lease,rent,or exchange,according to ORS 447,449,670,and 701. 201 amps to 400 amps 125.08 2 Owner signature: Date: 401 amps to 599 amps 168.54 2_P _ r 3 t . c' Branch circuits—new alteration �a:t � � ""� � t' �'�1�I `` A.Fee for branch circuits mith or extension,per panel Business name: BRS Field Ops, LLC above service or feeder fee, each branch circuit 7.42 2 Contact name: Diana Sanchez B.Fee for branch circuits without Address: 1403 N Research Way service or feeder fee,fast branch circuit 56.18 2 City/State/ZIP: Orem, UT 84097 Each add'1 branch circuit 7.42 2 Phone:( 385)482-0045 I Miscellaneous(service or feeder not included) Fax::( ) Each manufactured or modular Email: permitting.department@blueravensolar.com dwelling,service and/or feeder 67.84 2 $ taYr a > Reconnect only 67.84 2 . , , ° en , a1a `° � r ,�•.r`�; r � „ �i;�z,,, , Pump or irrigation circle 67.84 2 Business name: BRS Field Ops, LLC Sign or outline lighting 67.84 2 Address: 1403 N Research Way Signal circuit(s)or limited-energy panel,alteration or extension. 0 seePage 2 2 City/State/ZIP: Orem, UT 84097 Each additional inspection over allowable in any of the above Additional inspection(1 hr min) 66.25/hr Phone:( 385) 482-0045 Fax:( ) Investigation(1 hr min) 90.00/hr Email: permitting.department@blueravensolar.com Industrial plant(lhrmin) 78.18/11r Inspections for which no fee is CCB Lic.: 227185 Electrical L'c.: C1493 Suprv.Lic.: 6394S s.ecificall listed 'i�hrmin 90.001lir , ,?(,,5.r .+y i a� ',M39, �t ',sr77 . M1' Suprv.Electrician signature,required: z y Subtotal: Print name: Shan Whittaker Date: 09/18/2023 0 Plan Review Required(25%of permit fee): State surcharge(12%of permit fee): Authorized signature: Dealka Sakehee Permitting Coordinator TOTAL PERMIT FEE: This permit application expires if a permit is not obtained within 180 Print name: Diana Sanchez Date: 09/18/2023 days after it has been accepted as complete. * Number of inspections allowed per permit. I:\Budding\Penit\ELC_permiGlpp_ELR_ERE.doc Rev 06,17,2015 440-4615T(l1i05/COMIWEB ectrical Permit Application—City of Tigard *rie 2—Supplemental Information Limited Energy Permit Fees: Renewable Energy Permit Fees: Fee for all residential systems combined: $75.00Description sty. Satin Total * Renewable electrical energy systems: Check Type of Work Involved: 5 kva or less 100.70 2 5.01 to 15 kva 1 133.56 2 ❑ Audio and Stereo Systems* 15.01 to 25 kva 200.34 2 Wind generation systems in excess of 25 kva: ❑ Burglar Alarm 25.01 to 50 kva 301.04 2 ❑ Garage Door Opener* 50.01 to 100 kva 552.26 2 >1w tkhv Oa AfR91n 8a-c3c0od ) 552.26 2 ❑ Heating, Ventilation and Air Conditioning Solar generation systems in excess of 25 kva: System* Each additional kva over 25 7.42 3 ❑ Vacuum Systems* >100 kva-no additional charge 0.0 3 Each additional inspection over allowable in any of the above: ❑ Other: Each additional inspection is 66.25/hr 1 charged at an hourly(1 hr min) Inspections for which no fee is 90.00/hr , g s.ecificall listed(Y2 hr min) fi Fee for each commercial system: $75.00 Subtotal(Enter on Page 1): * Number of inspections allowed per permit. (SEE OAR 918-309-0000) Check Type of Work Involved: ❑ Audio and Stereo Systems ❑ Boiler Controls ❑ Clock Systems ❑ Data Telecommunication Installation ❑ Fire Alarm Installation ❑ HVAC ❑ Instrumentation ❑ Intercom and Paging Systems ❑ Landscape Irrigation Control* ❑ Medical ❑ Nurse Calls El Outdoor Landscape Lighting* ❑ Protective Signaling ❑ Other: Total number of commercial systems: *No licenses are required. Licenses are required for all other installations I:tBuilding\Pennits�ELC_PermitApp_ELR_ERE.doc Rev 06/l7/20I5 City of Tigard '' Building Division - 13125 SW Hall Blvd,Tigard, OR 97223 Phone: 503.718.2439 Fax: 503.598.1960 RECEIVED T I G A R D Inspection Line: 503.639.4175 .� www.tigard-or.gov SEP i 9 2023 CITY OF TIGARD 2010 Oregon Solar Installation Specialty CgifiD DIVISION Check List for Prescriptive Installation of Roof-Mounted PhotoVoltaic Solar Panel System Property Information Installation Address: 13800 SW 115th Ave, Tigard, Oregon, 97223 City: Zip: Owner's Name: Robert Rivera Date: 09 / 18 /2023 Contractor's Name: BRS Field Ops, LLC CCB #: 227185 Design Parameters of the Property/Structure If"Yes", does not Flood Hazard Is the installation ❑ Yes qualify for the Area Located in a flood prescriptive path, follow plain/flood way? © No OSSC or ORSC for design requirements. Wind Exposure Is the wind exposure 0 Yes If"Yes", qualifies for "C" or less? ❑ No the prescriptive path. Installations on detached Is the Ground Snow single/two-family Load 70 psf or less? dwelling/single/two- If"Yes", qualifies for family townhomes 2 Yes the prescriptive path. and/or their accessory Ground structures. ❑ No Snow Load Is the Ground Snow Installations on all Load 50 psf or less? structures other than If"Yes", qualifies for above © Yes the prescriptive path. ❑ No 1 I:Building/Forms/Photovoltaic-Checklist02-01-11.docx Is the construction 0 Yes Type of material wood and does If"Yes", qualifies for the construction qualify ❑ No the prescriptive path. Construction as "conventional light frame"construction? Is the spacing 24 inches or less? Q Yes If"Yes", qualifies for Pre-engineered trusses. the prescriptive path. ❑ No Roof framing members Is the spacing 24 inches or less? If"Yes", qualifies for Nominal lumber. © Yes the prescriptive path. ❑ No Is the combined weight © Yes of the PV modules and If"Yes", qualifies for racking less than or ❑ No the prescriptive path. Solar equal to 4.5 psf? installation Is the solar installation layout in accordance © Yes If"Yes", qualifies for with Section 305.4(3) of ❑ No the prescriptive path. the 2010 Oregon Solar Code? ❑ Metal Single layer If roofing material is Roofing Check the type of ❑ of wood one of the three types material roofing material shingle/shake checked, qualifies for Max. two layers the prescriptive path. 0 of composition shingle. Is the roof mounted © Yes Connections of solar assembly If"Yes", qualifies for the solar assembly connected to roof ❑ No the prescriptive path. to the roof framing or blocking directly? 2 I:Building/Forms/PhotoVoltaic-Checklist02-01-11.docx ❑ Yes If"Yes", qualifies for Is the gauge 26 or less? ❑ No the prescriptive path. 115 lbs for 60 inch spacing or less? If"Yes", qualifies for ❑ Yes the prescriptive path. ❑ No Minimum Uplift rating of Clamps? 75 lbs for 48 inches spacing or less? If"Yes", qualifies for ❑ Yes the prescriptive path. ❑ No Attachment of roof mounted Minimum 24 inches If the spacing falls solar systems Spacing of clamps? within 24 inches and 60 directly to inches Maximum 60 inches inches, qualifies for the standing seam prescriptive path. metal panels Width of roofing If the width of the panel panels? 18 inches or less is less than 18 inches, inches qualifies for the prescriptive path. Minimum#10 at 24 inches o/c? Size and spacing of If"Yes", qualifies for fastener? ❑ Yes the prescriptive path. ❑ No Is the roof decking of WSP min. 'A"thickness, ❑ Yes decking connected to If"Yes", qualifies for framing members ❑ No the prescriptive path. w/min. 8d nails @ 6"/12" o/c? Is the height less than or Maximum 18 inches equal to 18 inches? Height of the from the top of the If"Yes", qualifies for solar modules module to the roof © Yes the prescriptive path. surface. ❑ No 3 I:Building/Forms/Photovoltaic-Checklist02-01-1 I.docx Submittal Documents required for Prescriptive Installations Show the location of the PV system in relation to buildings, structures, property lines, and, as applicable, flood hazard areas. Site Plan Details must be clear and easy to read. Minimum size of the plan is 8.5 x 11 inches. Attach a simple structural plan showing the roof framing (rafter size, type, and spacing) and PV module system racking attachment. System must be shown in sufficient detail and clarity to assess whether it Structural Plan meets the prescriptive construction requirements as listed earlier above in the matrix. Minimum size of the plan is 8.5 x 11 inches. PV Modules Manufacturer: REC Solar Model Number: REC420AA PURE-R Listing Agency: UL 4 I:Building/Forms/PhotoVoltaic-Checklist02-01-11.docx