Loading...
Report r "CREEKVIEW AT SOUTH RIVER TERRACE" /Z1‘2C 660 /6 9 "7 /1() ,c. LOT 18 : t•-•kc• 2.0 23 - 000\3 HUB AND TACK CERTIFICATION NE 7/4 SEC. 7, T 2 5, R 1 \"1, 'A.M. CITY OF TIGARD, WASHINIGTON COUNTY, OREGON SURVEYED AUGUST C. 202.3 PREPARED FOR: T A YLOR MORRISON NORTHWEST 703 BROADWAY ST., SUITE 710 SO L.;TH , --N VANCOUVER, WA. 98660 i7 '/E, I TERRACE : * LOT 76 CD I 6 i 1 C.) 5.00 PUBLIC o Ct" LOT UTILITY 1---_ EASEMENT c-) 17 70 C4 o cN ci) N89'30'35"E 105.00' —.------36 28' IA-1 c 0 lii 10 I cNI -0 Lw to - o cr) u., b LOT I N 6 a) 0 . 36.00' o ol V) o N o o 0 0 -••--20.00' o 0 36,41' Li D o '........._ , u N89'30'35"E 104.99' 0 b > U X Ln x LOT tn = 0 1-- 19 0) cc 11 Eu o i (r) fzSi REGISTERED 7, PROFESSIONAL 7; LAND SURVEYOR (t) LOT 20 a OREGON JULY 9, 2002 I > TRAVIS C. JANSEN 0 57751.., 1 I .0 o RENEWS: 6/30/2025 a g I, TRAVIS C. JANSEN, A REGISTERED PROFESSIONAL LAND SCALE I.) SURVEYOR IN THE STA IE OF OREGON, HEREBY CERTIFY THAT 30 0 15 30 2_ I HAVE ACCURATELY SURVEYED AND STAKED THE MINIe6m.. ...1 9 FOUNDATION ENVELOPE FOR LOT 18 OF "CREEKVEW AT 1 INCH = 30 FEET ,--, 2 SOUTH RIVER TERRACE". r, ( DRAWN BY: TRK DATE:08/3 Ic7 0/23 PACIFIC COMMUNITY DESIGN REVIEWED BY: T2 DATE:08/30/23 z PLANNING - ENGINEERING - SURVEYING PROJECT NO.: 395-103 \,_ (503) 941-9484 CT ENGINEERING 180 Nickerson St. INC Suite 302 Seattle,WA 98109 (206)285-4512(V) (206)285-0618(F) asolomon@ctengineering.com BULLETIN Date: June 20, 2022 Number: CT-02 Project#: 21078 Project Name: South River Terrace Attached: CT-02.1 Subject: Cantilever Retaining Wall Drawings Affected: Description/Action: This bulletin provides response to RFI's, design clarifications and/or variation requests for the `South River Terrace' project located in Tigard, Oregon. See attached page CT-02.1 for cantilever retaining wall detail and schedule. Per our discussion with Taylor Morrison, it's our understanding that for several lots, cantilever retaining walls will be required as shown. „ca PRCFI` C 9 ; ; lte\ F' ON �� 1f/C F• 12, c<Z,, 06/20/2022 CALL WITH ANY QUESTIONS Issued by: Arnold R. Solomon Date: June 20, 2022 Distribution: Contact Information: Dennis Gaudreault Taylor Morrison Frank Sandoval Taylor Morrison Sam Scott Taylor Morrison Amy Russell Taylor Morrison Elizabeth Erlandson Milbrandt Architects N:\21078 South River Terrace\Bulletins\21078_2022.06.20_CT02_Cantilever Retaining Wall.doc Structural Engineers 1 • CT-02 BULLETIN CT-02.1 CCNC.SO.G. \ 1.3 AT 24.0.C. 111 ;- - (2) 5ATtaw FREE-DRAWING BACKFAI RE: GEDTECH VERT.BARS PER 2"CLR. SCHEDULE(LAP WITH ? / DOWELS) 0 µ AT 10'0.C.HOR. o ° ,k p CANTILEVER RETAINING WALL SCHEDULE WALL HEIGHT HEEL TOE BASE DEPTH DOWELS VERT.BARS THICKNESS 0 0'TO 2,-0" 0*-4" 0-4" 1.-4" 8" /4 018" /4 0 18" B" ° DOWEL BARS TO MATCH • g VERT.BARS 2'-1"TO 4'-0" 0-6" 0'-6" 1'-8" 10" /4 0 18" /4 0 18" 8" 4'-1"TO 6'-0" 1'-10" 0'-6" 3'-0" 10" /4 0 If µ 0 12" 8" _ FOOTING BARS TO MATCH RETAINING WALL FOOTING `� I • / VERT.BARS 6'-1"TO B'-0" 3'-2" 0'-6" 4'-4" 12" i5 0 10" /5 010" 8" PER SCHEDULE : - . .. . _• _ W-1*TO 16-0" 4'-Y 0-6" 5'-9" 12" #5 O 8" /5 0 8" 8" �•�: �;�:�� • 10.-1"TO 12.-0" 5'-10 0-6" 7'-0" 14" /5 0 5" #5 0 5" 8" FOUNDATION DRAIN l.110.:l •;-I 111 BY OTHERS :- •r a •. I ° • •° • °° • mil• I-III `a III_ \ ° ° • -III—I Ill h \ II7,Illr III—TTII— #5 0 12 LONGITUDINAL / / /HEEL 8" TOE / / BASE CANTILEVER RETAINING WALL I e . CT ENGINEERING N C 180 Nickerson St. Suite 302 Seattle,WA 98109 (206)285-4512(V) (206)285-0618(F) aso l omon Ccteng ineeri ng.co m BULLETIN Date: August 10, 2022 Number:CT-05 Project#: 21078 Project Name: South River Terrace Attached: CT-05.1 Subject: SOG Dowels to Cantilever Retaining Wall Drawings Affected: Description/Action: This bulletin provides response to RFI's, design clarifications and/or variation requests for the 'South River Terrace' project located in Tigard, Oregon. Per our discussion with Taylor Morrison, it's our understanding that we will need to provide a rebar dowel connection for the slab-on-grade to the existing cantilever retaining wall in place of the#3 bars @ 24"o.c. shown at the top of the retaining wall per Bulletin CT-02 (06/20/2022). See attached page CT-05.1 for the dowel connection. Note that this slab-on-grade dowel connection may also apply to adjacent foundation walls. Ep PRC,r �` GINE r ►' ON 4, � 12, ti 'SL F R0 \- 08/10/2022 CALL WITH ANY QUESTIONS Issued by: Arnold R. Solomon Date: August 10, 2022 Distribution: Contact Information: Dennis Gaudreault Taylor Morrison Frank Sandoval Taylor Morrison Sam Scott Taylor Morrison Amy Russell Taylor Morrison Elizabeth Erlandson Milbrandt Architects N:121078 South River Terrace\Bulletins121078 2022.08.10 CT05 SOG Dowels to Cantilever Retaining Wall.doc Structural Engineers • I CT ENGINEERING INu Nickerson St. Suite 302 I N C_ Scathe,WA Project: SOUTH RIVER TERRACE 08/10/2022 98i09 (206)28S-4512 Client: TAYLOR MORRISON Page Number: CT-05.1 „7'6,285-0618 Lott?t 11+e DowEL ConnEtTWN Shown Nay Auo RPM To Ro pn-- FounowatIn WALAJ So G Pen, Ew j s C*rT. Rocco tnt. WALL PI.M4 • • (SEE CT-01 But.trrttt.t 1 1 0/1011) FOIL ktr F.) • G` a '4 3 Dow as • lj"6.0, ty. t0Wu EPowy Utty , C 'SoakoN SItt n,-71t'r 6 G SET-36' Rn414otUtt6 AOHeStV! Sunni (DL — `' PPPflovE0 CURL NtN baleen Delk = 3" Mud LEA014 OP *3 DUwty ° 1LO") DETAIL 2144%ILO" Structural Engineers