Report r "CREEKVIEW AT SOUTH RIVER TERRACE" /Z1‘2C 660 /6 9 "7 /1() ,c.
LOT 18 :
t•-•kc• 2.0 23 - 000\3
HUB AND TACK CERTIFICATION
NE 7/4 SEC. 7, T 2 5, R 1 \"1, 'A.M.
CITY OF TIGARD, WASHINIGTON COUNTY, OREGON
SURVEYED AUGUST C. 202.3
PREPARED FOR:
T A YLOR MORRISON NORTHWEST
703 BROADWAY ST., SUITE 710
SO L.;TH
, --N VANCOUVER, WA. 98660
i7 '/E,
I
TERRACE
: * LOT
76
CD
I
6 i
1 C.)
5.00 PUBLIC
o
Ct"
LOT UTILITY
1---_
EASEMENT
c-)
17 70
C4
o
cN
ci)
N89'30'35"E 105.00'
—.------36 28' IA-1
c 0 lii
10
I cNI -0
Lw to
- o
cr)
u., b
LOT I N 6
a) 0 . 36.00'
o
ol V) o
N
o
o
0 0
-••--20.00'
o 0
36,41' Li
D
o
'........._ ,
u
N89'30'35"E 104.99'
0
b >
U X
Ln
x
LOT tn =
0
1--
19 0)
cc
11
Eu
o i
(r)
fzSi REGISTERED
7, PROFESSIONAL
7; LAND SURVEYOR
(t)
LOT
20
a OREGON
JULY 9, 2002
I
> TRAVIS C. JANSEN
0
57751.., 1 I
.0
o RENEWS: 6/30/2025
a
g I, TRAVIS C. JANSEN, A REGISTERED PROFESSIONAL LAND SCALE
I.) SURVEYOR IN THE STA IE OF OREGON, HEREBY CERTIFY THAT 30 0 15 30
2_ I HAVE ACCURATELY SURVEYED AND STAKED THE MINIe6m.. ...1 9 FOUNDATION ENVELOPE FOR LOT 18 OF "CREEKVEW AT 1 INCH = 30 FEET
,--,
2 SOUTH RIVER TERRACE".
r, ( DRAWN BY: TRK DATE:08/3
Ic7 0/23 PACIFIC COMMUNITY DESIGN
REVIEWED BY: T2 DATE:08/30/23
z PLANNING - ENGINEERING - SURVEYING
PROJECT NO.: 395-103
\,_ (503) 941-9484
CT ENGINEERING 180 Nickerson St.
INC
Suite 302
Seattle,WA 98109
(206)285-4512(V)
(206)285-0618(F)
asolomon@ctengineering.com
BULLETIN
Date: June 20, 2022 Number: CT-02 Project#: 21078
Project Name: South River Terrace Attached: CT-02.1
Subject: Cantilever Retaining Wall
Drawings Affected:
Description/Action:
This bulletin provides response to RFI's, design clarifications and/or variation requests for the
`South River Terrace' project located in Tigard, Oregon.
See attached page CT-02.1 for cantilever retaining wall detail and schedule. Per our discussion with
Taylor Morrison, it's our understanding that for several lots, cantilever retaining walls will be required
as shown.
„ca PRCFI`
C 9 ; ; lte\
F' ON ��
1f/C F• 12, c<Z,,
06/20/2022
CALL WITH ANY QUESTIONS
Issued by: Arnold R. Solomon Date: June 20, 2022
Distribution:
Contact Information:
Dennis Gaudreault Taylor Morrison
Frank Sandoval Taylor Morrison
Sam Scott Taylor Morrison
Amy Russell Taylor Morrison
Elizabeth Erlandson Milbrandt Architects
N:\21078 South River Terrace\Bulletins\21078_2022.06.20_CT02_Cantilever Retaining Wall.doc
Structural Engineers
1
•
CT-02 BULLETIN CT-02.1
CCNC.SO.G. \ 1.3 AT 24.0.C.
111 ;- - (2) 5ATtaw
FREE-DRAWING
BACKFAI
RE: GEDTECH
VERT.BARS PER
2"CLR. SCHEDULE(LAP WITH ?
/ DOWELS) 0
µ AT 10'0.C.HOR. o
°
,k p CANTILEVER RETAINING WALL SCHEDULE
WALL HEIGHT HEEL TOE BASE DEPTH DOWELS VERT.BARS THICKNESS 0
0'TO 2,-0" 0*-4" 0-4" 1.-4" 8" /4 018" /4 0 18" B"
° DOWEL BARS TO MATCH
•
g VERT.BARS 2'-1"TO 4'-0" 0-6" 0'-6" 1'-8" 10" /4 0 18" /4 0 18" 8"
4'-1"TO 6'-0" 1'-10" 0'-6" 3'-0" 10" /4 0 If µ 0 12" 8"
_ FOOTING BARS TO MATCH
RETAINING WALL FOOTING `� I • / VERT.BARS 6'-1"TO B'-0" 3'-2" 0'-6" 4'-4" 12" i5 0 10" /5 010" 8"
PER SCHEDULE : - . ..
. _• _ W-1*TO 16-0" 4'-Y 0-6" 5'-9" 12" #5 O 8" /5 0 8" 8"
�•�: �;�:�� •
10.-1"TO 12.-0" 5'-10 0-6" 7'-0" 14" /5 0 5" #5 0 5" 8"
FOUNDATION DRAIN l.110.:l •;-I 111
BY OTHERS :- •r
a •.
I
°
• •°
• °° •
mil• I-III
`a III_ \
° ° • -III—I Ill h \
II7,Illr III—TTII—
#5 0 12 LONGITUDINAL
/ / /HEEL 8" TOE /
/ BASE
CANTILEVER RETAINING WALL I
e .
CT ENGINEERING
N C 180 Nickerson St.
Suite 302
Seattle,WA 98109
(206)285-4512(V)
(206)285-0618(F)
aso l omon Ccteng ineeri ng.co m
BULLETIN
Date: August 10, 2022 Number:CT-05 Project#: 21078
Project Name: South River Terrace Attached: CT-05.1
Subject: SOG Dowels to Cantilever Retaining Wall
Drawings Affected:
Description/Action:
This bulletin provides response to RFI's, design clarifications and/or variation requests for the
'South River Terrace' project located in Tigard, Oregon.
Per our discussion with Taylor Morrison, it's our understanding that we will need to provide a rebar
dowel connection for the slab-on-grade to the existing cantilever retaining wall in place of the#3
bars @ 24"o.c. shown at the top of the retaining wall per Bulletin CT-02 (06/20/2022).
See attached page CT-05.1 for the dowel connection. Note that this slab-on-grade dowel
connection may also apply to adjacent foundation walls.
Ep PRC,r �`
GINE
r
►' ON
4, � 12, ti 'SL
F R0 \-
08/10/2022
CALL WITH ANY QUESTIONS
Issued by: Arnold R. Solomon Date: August 10, 2022
Distribution:
Contact Information:
Dennis Gaudreault Taylor Morrison
Frank Sandoval Taylor Morrison
Sam Scott Taylor Morrison
Amy Russell Taylor Morrison
Elizabeth Erlandson Milbrandt Architects
N:121078 South River Terrace\Bulletins121078 2022.08.10 CT05 SOG Dowels to Cantilever Retaining Wall.doc
Structural Engineers
•
I
CT ENGINEERING INu Nickerson St.
Suite 302
I N C_ Scathe,WA
Project: SOUTH RIVER TERRACE 08/10/2022 98i09
(206)28S-4512
Client: TAYLOR MORRISON Page Number: CT-05.1 „7'6,285-0618
Lott?t 11+e DowEL ConnEtTWN Shown
Nay Auo RPM To Ro pn--
FounowatIn WALAJ
So G Pen, Ew j s C*rT. Rocco tnt. WALL
PI.M4 • • (SEE CT-01 But.trrttt.t 1 1 0/1011)
FOIL ktr F.)
• G` a
'4 3 Dow as • lj"6.0, ty.
t0Wu EPowy Utty , C
'SoakoN SItt n,-71t'r 6 G
SET-36' Rn414otUtt6
AOHeStV! Sunni (DL — `'
PPPflovE0 CURL
NtN baleen Delk = 3"
Mud LEA014 OP *3 DUwty ° 1LO")
DETAIL
2144%ILO"
Structural Engineers