Report (2) "CREEKVIEW AT SOUTH RIVER TERRACE" /116/6 5(^)
r • LOT 17
HUB AND TACK CERTIFICATION l'ASk- 202
NE 1/4 SEC. 7, ' ' c, F; 1 \Ai, A.M.
CITY ';)':: TiGARD, WASHNC'770-N COUNTY, OREGON
S,JRVEYEC AUGUST 30, 2023
PREPARED FOR:
TAYLOR MORRISON NORTHWEST
70.3 BROAD WA'' ST_ SUITE 710
VANCOUVER, WA. 9866C
SOUTH -\ ,
RiVER i
/
TERRACE I I
'
)\, LOT ! )
15 ,
1
(i) 1
/--6,00' PUBLIC
/ UTIL)TY
) 0
o i-- EASEMENT
4i < th/
0 'zi LOT
c•-) CC
c,4
76 b
az r..,9
0
D 0 N8930135”E i 104.97' 16.77'
< 0
NO011'09"W -.........---- .
, 32.61 ----.-,—
._ 5.93'
>- —
LL. o I-Li I 1.1.1
in . I
i cc In . I , LOT I
.-, vr h Cs1 0 w
' o 17 -
I a)
c•I ci • 5•I (15 z
-0 32 50
c 0 0
o <
•-= (1) _...--32 64' 0
0
N8930'35"E t 105.00' 76 77, 1 :at.
.-E- Or)
Q., b
o o
'i LOT r-
g 78 (r)
'5 1
ti
U
ei
0 IREGISTERED
PROFESSIONAL
`, I LAND SURVEYOR I
R
O 11/1/ LOT
19
OREGON
JULY 9, 2002 I
TRAVIS C. JANSEN
0
?. \.. 57751 I
D .1
(i)
.
o RENEWS: 6/30/2025
0)
g I, TRAVIS C. JANSEN, A REGISTERED PROFESSIONAL LAND SCALE
O SURVEYOR IN THE STATE OF OREGON, HEREBY CERTIFY THAT 30 0 15 30
o I HAVE ACCURATELY SURVEYED AND STAKED THE .111M
0.
5' FOUNDATION ENVELOPE FOR LOT 17 OF "CREEKVIEW AT 1 INCH = 30 FEET
,-)
2 SOUTH RIVER TERRACE".
DRAWN BY: TRK DATE:0 /30/23
a. 8 PACIFIC COMMUNITY DESIGN
BY:REVIEWED
,--: • T2 DATE:08/30/23
PLANNING - ENGINEERING - SURVEYING
z
PROJECT NO.: 395-103
(503) 941-9484 —1
.s
CT ENGINEERING
N C 180 Nickerson St.
Suite 302
Seattle,WA 98109
(206)285-4512(V)
(206)285-0618(F)
asolomon Cctengineering.com
BULLETIN
Date: June 20, 2022 Number: CT-02 Project#: 21078
Project Names South River Terrace Attached: CT-02.1
Subject: Cantilever Retaining Wall
Drawings Affected:
Description/Action:
This bulletin provides response to RFI's, design clarifications and/or variation requests for the
'South River Terrace' project located in Tigard, Oregon.
See attached page CT-02.1 for cantilever retaining wall detail and schedule. Per our discussion with
Taylor Morrison, it's our understanding that for several lots, cantilever retaining walls will be required
as shown.
eop PROF /`
GIN
C 9 ›IPA
C
ti ON
Fp 0 CD
q,C F12, 0s6."
06/20/2022
CALL WITH ANY QUESTIONS
Issued by: Arnold R. Solomon Date: June 20, 2022
Distribution:
Contact Information:
Dennis Gaudreault Taylor Morrison
Frank Sandoval Taylor Morrison
Sam Scott Taylor Morrison
Amy Russell Taylor Morrison
Elizabeth Erlandson Milbrandt Architects
N:\21078 South River Terrace\Bulletins\21078_2022.06.20_CT02_Cantilever Retaining Wall.doc
Structural Engineers
CT-02 BULLETIN CT-02.1
CONC.S.O.G.- A/—13 Ai 240.C.
1 I-1:!=c a.:s
t ail ifi
FREE-DRAINING
BACKFILL
RE GEOTECH
HERS.BARS PER •2"CLR. 4.• SCHEDULE(LAP WITH ?
/. DLS) A
. µAT10'O.C.NOR. i
. 4
s
.0CANTILEVER RETAINING WALL SCHEDULE
WALL HEIGHT HEEL TOE BASE DEPTH DOWELS VERT.BARS THICNNESS
Z. 0'TO 2'-0" 0-4" 0-4" I'-4" 8' µ 0 18" 14 018" 8"
4 DOWEL BARS TO MATCH
g BARS 2'-1'TO 4'-0' 0'-fi' 0'-6" t'-8' 10" µ O 18" µ 018' 8'
ct 4'-I"TO 6'-0" 1'-10" 0'-6" 3'-0• 10' µ 0 12" µ 0 12• 8"
FOOTING BARS 70 MATCH
RETANINC WALL FOUND � 7-11ER7.
man BARS -
6'-Y TO 8'-0' 3'-2' 0'-6• 4'-4" 12' i5 O 10• /5 O 10" 8"
PER SCHEDULE = jii.:0 0 l_IiI_• 8'-1.TO 10.-0" 4'-7" 0-6" 5-9" 12" /5 0 B" /5 0 rr 8'
'��"•�i�i�:i-i!i.
IO'-I"TO 12'-0• 5-10" 0-8" 7'-0" 14' 5" 0 5' 8"
r#.1�:r'ftiii t5 0 1'S
FOUNDA110N DRAIN !! !!!!!_ ' .
BYOTHERS 4e \ _ _ _ : .
. •
4 . .�1IW
• ;
°4 .• 4• . . III_ Tn\
— -I I—I
11-11TT III;fl I I I
/5 0 12"LONGITUDINAL
HEEL 8" TOE
/ / /
BASE
/ /
CANTILEVER RETAINING WALL
r F r
CT ENGINEERING
IN C 180 Nickerson St.
Suite 302
Seattle,WA 98109
(206)285-4512(V)
(206)285-0618(F)
asolomon@ctengineering.com
BULLETIN
Date: August 10, 2022 Number: CT-05 Project#: 21078
Project Name: South River Terrace Attached: CT-05.1
Subject: SOG Dowels to Cantilever Retaining Wall
Drawings Affected:
Description/Action:
This bulletin provides response to RFI's, design clarifications and/or variation requests for the
'South River Terrace' project located in Tigard, Oregon.
Per our discussion with Taylor Morrison, it's our understanding that we will need to provide a rebar
dowel connection for the slab-on-grade to the existing cantilever retaining wall in place of the#3
bars @ 24"o.c. shown at the top of the retaining wall per Bulletin CT-02 (06/20/2022).
See attached page CT-05.1 for the dowel connection. Note that this slab-on-grade dowel
connection may also apply to adjacent foundation walls.
�F. ,G I N e `C< ►�
C
ON
4 • 12, 1, `G'
F, RO
08/10/2022
CALL WITH ANY QUESTIONS
Issued by: Arnold R. Solomon Date: August 10, 2022
Distribution:
Contact Information:
Dennis Gaudreault Taylor Morrison
Frank Sandoval Taylor Morrison
Sam Scott Taylor Morrison
Amy Russell Taylor Morrison
Elizabeth Erlandson Milbrandt Architects
N:\21078 South River Terrace\Bulletins\21078_2022.08.10_CT05_SOG Dowels to Cantilever Retaining Wall.doc
Structural Engineers
1811 Nickerson St.
CT ENGINEERING suite 302.
N C. Seattle,WA
Project: SOUTH RIVER TERRACE hate; 08/10/2022 981°9
(206)285-4512
client: TAYLOR MORRISON Page Number- CT-05.1 "h
{2i6)285-0618
Nowt THE Dowel. CQnnECTION Si-iOwn
Hay ALSO APPLY To RD im
FounOM bn WALLS
SOG Prn, EEut' C.wT. RtTAIAIAG WALL
PLAN • , ISR CI-01 BuUkTtu (nbj1011011.)
Fkt. ktnF.)
a3 DOWELS • 1146.C, 4 �y.
(DRtu EPo .Y Uttn(, C
tftreitsoN SlLanM -T!E 6 G
SeT-36' RrKvtntun6 G
ROHbtWP Snarly Cit.
PIPPtlbVt70 E)R(,, . �." .
N%N tmgea Depth 3". ( "`7(
Hu,t Len014 OP x3 Dowe.s a 1'-0°)
beta tt-
?ly"t 1-0`
Structural Engineers