Loading...
HomeMy WebLinkAboutReport (2) > --- `ea G 'SOUTH RIVER TERRACE" BUILDING 19 ((07 HUB AND TACK CERTIFICATION l4ONE 1/4 SEG. 7, T 2 S, R 1 W, W.M. CITY OF TIGARD, WASHINGTON COUNTY, OREGON '�( SURVEYED SEPTEMBER 20, 2023 �n PREPARED FOR: 1 i TAYLOR MORRISON NORTHWEST, LLC. 11,p0 703 BROADWAY ST., SUITE 710 4'k1 VANCOUVER, WA. 98660 IN 1 01 a TRACT J ocn csi 6.00' PUBLIC • UTILITY EASEMENT `v O a Z 9, I M w , I a)W N °' 3 I -•-17.62' BUILDING 19 ( o 0 o I O U I to Q U 3.00' PUBLIC I O ✓ /UTILITY EASEMENT � ' u 'TO. N89'54'OO"W 329.99' i _ _ —~' -TRACT 0 — NORTHSIDE 2 L=21.47'-�°' t - t - - - - i- -1- VIEW AT SOUTH. - - - - _m- -- N I RIVER TERRACE 1'� H N74'54'00"W -I o REGISTERED I PROFESSIONAL 18.13' LAND SURVEYOR of m 7 8 9 10 o i I OREGON JULY 9, 2002 Lr TRAVIS C. JANSEN 57751 5 o RENEWS: 6/30/2025 .. 0) I, TRAVIS C. JANSEN, A REGISTERED PROFESSIONAL LAND SCALE 2 SURVEYOR IN THE STATE OF OREGON, HEREBY CERTIFY THAT 40 0 20 40 I HAVE ACCURATELY SURVEYED AND STAKED THE 9 FOUNDATION ENVELOPE FOR BUILDING 19 OF "SOUTH RIVER 1 INCH = 40 FEET a TERRACE". s/ DRAWN BY: MJL DATE:10/03/23 PACIFIC COMMUNITY DESIGN REVIEWED BY: T2 DATE:10/03/23 PLANNING - ENGINEERING - SURVEYING z PROJECT NO.: 395-103 (503) 941-9484 UN`` (31. n let 11(0 3`l �w �4 y"Ac� . V 5my- �013 , 403W FIELD REPORT Page 1 of 1 Project: TaylorMor-7-09 Prepared By: Jesse Claudio Project Name: South River Terrace Phase 3 Date: 10/05/23 Location: SW of SW Roy Rodgers Rd and Bull Report#: 29 Mtn Arrival: 1230 Departure: 1 300 Weather: Cloudy, 60s Permit#: - Site Visit Requested By: JR (MEI) Met With (on site): Ron (MEI) (phone) Purpose: Evaluate lot subgrade Outstanding Issues: Lot subgrade I observed lot subgrade to lots 19-22. I observed lot subgrade to consist of brown silt with some areas covered by approximately 2-3 inches of%"-0 crushed rock. I used a%" diameter steel probe to evaluate the consistency of the subgrade. Based on penetration resistance, the subgrade observed today generally appeared to be stiff to very stiff. Conclusion Based on our observations, it is our opinion that the lot subgrade observed today as indicated on the attached site plan, have been prepared in general accordance with the project plans and our geotechnical recommendations. Distribution: Attachments: Site Plan (1) Reviewed by: This report presents opinions formed as a result of our observation of activities relating to geotechnical engineering or environmental services. We rely on the contractor to comply with the plans and specifications throughout the duration of the project irrespective of the presence of our representative. Our work does not include supervision or direction of the contractor,the contractor's employees or agents. Our firm is not responsible for site safety. This field report is a DRAFT representation of our field observations,testing,and preliminary recommendations. The report can only be considered final upon review of the NVS project manager,as indicated by initials in the"Reviewed By"section. Signature: Jesse Claudio 9450 SW Commerce Circle,Suite 300 I Wilsonville,OR 97070 1503.968.8787 I www.nv5.com CT ENGINEERING N C 180 Nickerson St. I��� �� Suite 302 / .N�Y '� Seattle,WA 98109 V w teC tIve 206) 85-4512(V2 ) t g (206)285-0618(F) asolomon@ctengin eering.com�a3/7 MSf 7913 BULLETIN Date: June 20, 2022 Number: CT-02 Project#: 21078 Project Name: South River Terrace Attached: CT-02.1 Subject: Cantilever Retaining Wall Drawings Affected: Description/Action: This bulletin provides response to RFI's, design clarifications and/or variation requests for the 'South River Terrace' project located in Tigard, Oregon. See attached page CT-02.1 for cantilever retaining wall detail and schedule. Per our discussion with Taylor Morrison, it's our understanding that for several lots, cantilever retaining walls will be required as shown. PRO,,*` F, IN * ON Fp r1c `CD q�C F 12, . 06/20/2022 CALL WITH ANY QUESTIONS Issued by: Arnold R. Solomon Date: June 20, 2022 Distribution: Contact Information: Dennis Gaudreault Taylor Morrison Frank Sandoval Taylor Morrison Sam Scott Taylor Morrison Amy Russell Taylor Morrison Elizabeth Erlandson Milbrandt Architects N:\21078 South River Terrace\Bulletins\21078_2022.06.20_CT02_Cantilever Retaining Wall.doc Structural Engineers " CT-02 BULLETIN CT-02.1 CONC. S.O.G. #3 AT 24"0.C. / \0 a -III _ r .r 1 1 1 �#10•�_ a (2) #5 AT T.O.W. a . / d < FREE—DRAINING ,. BACKFILL RE: GEOTECH N VERT. BARS PER2" CLR. d e SCHEDULE (LAP WITH DOWELS) ii n 14 AT 10" O.C. HOR. x Q d. a a. CANTILEVER RETAINING WALL SCHEDULE WALL HEIGHT HEEL TOE BASE DEPTH DOWELS VERT. BARS THICKNESS 0 <c cn 0' TO 2'-0" 0'-4" 0'-4" 1'-4" 8" $4 0 18" $4 0 18" 8" w e DOWEL BARS TO MATCH 2'-1"TO 4'-0' 0'-6" 0'-6" 1'-8" 10' #4 0 18' #4 0 18' 8' a a VERT. BARS Z 4'-1"TO 6'-0" 1'-10" 0'-6" 3'-0" 10" #4 0 12" #4 0 12' 8" Y FOOTING BARS TO MATCH RETAINING WALL FOOTING L' / VERT. BARS s'-1' TO 8'-0' 3'-2' 0'-6' 4'-4" 12' 5 010" 5 0 10' 8" PER SCHEDULE ``' ���4 •"• _, 1 IiIf1l1 1l1 8'-1"TO 10'-0" 4'-7" 0'-6" 5-9" 12' $5 0 8" $5 0 8" 8' !�PAM:11. dtzfz��� 10'-1"TO 12'-0" 5-10' T-0" 14" $5 0 5" #5 0 5' 8" Q 11I001:01 FOUNDATION DRAIN 0%!%!�!z•%0%0' BY OTHERS d 4 I`' On \ 4 ;d O A Ct a : a o a .d a e I- 11 CI 11 I1_ 111; =1II I� #5 0 12" LONGITUDINAL HEEL 8" TOE / / BASE / / CANTILEVER RETAINING WALL