Loading...
Report (2) PERMIT NO. ("51-20.-3,6o3 CleanWater Services LOT 111 EROSION CONTROL INSPECTION REPORT DATE ql 2g(1-5 INSPECTOR C t-JwiN SUBDIVISION L Q s -(@ s ru Le Cs ssk ,A) OWNER/PERMITEE S{-biNe try (,Q.v%e_S LLt SITE ADDRESS (555-J 5.0 qL%. fc ,rAPPROVED FOR THIS SITE TO REMAIN IN COMPLIANCE WITH CLEAN WATER SERVICES EXISTING RESOLUTION AND ORDER FOR DURATION OF CONSTRUCTION, THE OWNER/PERMITEE MUST: • MAINTAIN CLEAN STREET (S) -FREE OF ANY VISIBLE OR MEASURABLE AMOUNT OF DIRT, GRAVEL OR DEBRIS. GRAVEL ACCESS RAMPS STRICTLY PROHIBITED. • TO PREVENT TRACKING, RESTRICT ALL CONSTRUCTION VEHICLE TRAFFIC TO GRAVEL CONSTRUCTION ENTRANCE OR STREET ONLY. • MAINTAIN ALL EROSION CONTROL MEASURES TO CLEAN WATER SERVICES INSTALLATION STANDARDS. • PROVIDE MAINTENANCE OF ANY SEDIMENTATION BARRIERS/FILTERS AT STORM DRAIN STRUCTURES OR DRAINAGE AREAS WHICH ARE SITE SPECIFIC. • PROVIDE ADDITIONAL EROSION CONTROL MEASURES AT ANY TIME DURING CONSTRUCTION WHEN SITE CONDITIONS CHANGE. • OTHER NOTE: FAILURE OF THIS SITE TO REMAIN IN COMPLIANCE WITH CLEAN WATER SERVICES RESOLUTION AND ORDER CAN RESULT IN THE ISSUANCE OF A CIVIL CITATION, STOP WORK, OR SUSPENSION OF PERMITS AS DEFINED IN CLEAN WATER SERVICES RESOLUTION AND ORDER 90-63 AS AMENDED. INSPECTOR ✓ PHONE So a� FOUNDATON CERTIFICATION LOT 24 OF "CROSSING AT BULL MOUNTAIN", CITY OF TIGARD, WASHINGTON COUNTY, OREGON PREPARED FOR Averzeay. 5557 S _ - — , STONE BRIDGE HOLES NW, TLC _ _ _ 4230 GALEWOtD ST., SUITE 100 `_ 3 _ 0 r LAKE OSWEGO, OR 97035 , -- 0*.C e ' { ...,„ SW WOODHUE STREET / N C30 L=1.34' TRACT W -- G ---- ---. — —— S89`55'53"W 89.94' \ > cn cr Q // 25.2' 0 49.00' "— 20 0' L I 0 4.50' V 4) w `-7.00' W co -_ 1.00' �' G. TRACT 44 5.67' LOT "� F ,'o, _""- —1b. .00' 24 f h• ic C3 TV N Z 48.5' 56.00 25.0' 9, �„ '" 20.0 0 P. N89'55'53"E 128.26' sm' LOT I PUE 23 N .11 CURVE TABLE ®, CURVE RADIUS DELTA LENGTH CHORD PUE PUBLIC UTILITY EASEMENT C30 15.00' 506'29' 1.34' N2'37'21"W 1.34' SCALE: 1"=20 FEET 08/29/2023 ■�ill = REGISTERED 20 0 4 10 20 PROFESSIONAL LAND SURVEYOR I, ROBERT D. RETTIG, A REGISTERED PROFESSIONAL LAND SURVEYOR IN NE STATE .i .2,/,fr .,__, OF OREGON, HEREBY CERTIFY THAT I HAVE STAKED THE FOUNDATION FOR LOT 24 OF "CROSSING AT BULL MOUNTAIN" WITH HUBS AND TACKS ON AUGUST 28, 2023. Li----OREGON JANUARY ROBERT D RETTIG 005 CROSSING AT BULL MOUNTAIN LOT 24 60124LS AKS ENGINEERING & FORESTRY, LLC ORwr+: OMR RENEWS' 12/31/24 12965 SW HERMAN RD, STE 100AB DRCH : PMR TUALATIN, OR 97062 AKS JOB: P:503.563.6151 F:503.563.6152 oks-eng.com 9531 DN!G:9531CS1X I LOT 24 FC Krt 4-4 GEOPRCIFIC Real-World Geotechnical Solutions Investigation•Design•Construction Support lust 26, 2023 ptoject No. 16-4108 Stonebridge Job No. 3246 Attention: Andy Thomas /14 72" 2i`- Stonebridge Homes NW LLC 4230 SW Galewood St., Ste. 100 Ot) 3 l 1 Lake Oswego, OR 97035 Fax 503-387-7615 Email Andy at stonebridgehomesnw.com; JimD(a�stonebridgehomesnw.com; Kristen(admhholdings:,o.com FOUNDATION SUBGRADE REVIEW LOT 24 RIVER TERRACE CROSSING 15557 SW PEACE AVENUE WASHINGTON COUNTY, OREGON Reference: NV5, Revised Summary Letter Geotechnical Construction Observation Services, Phases 1 and 2, River Terrace Crossing, SW Woodhue Street SVP150th Avenue, Tigard, Oregon, dated September 30, 2022. GeoPacific Engineering Inc. visited the site yesterday to review the single-family home foundation subgrade at the above address. We understand that the proposed building is a two-story home. In our opinion, the observed subgrade is adequate for support to an allowable bearing pressure of 1,500 psf. The mass grading of the site was observed and tested by others. At the time of our site visit, the excavation was nearly complete, and soils exposed in foundation excavation consisted of predominantly rocky fill with gravel with to stiff fill soils that could be probed about 1 to 2 inches with moderate pressure using a steel "T" bar probe. Up to 2 feet of soft fill was removed from the front of the home. The lot is gently sloped; footing to slope and footing to wall setbacks were not an issue. The expected maximum anticipated total and differential footing movements (generally from soil expansion and/or settlement) are 1 inch and % inch, respectively, over a span of 20 feet. Due to relatively impervious silty and clayey soils encountered throughout the site, all foundations should incorporate appropriate drainage measures in accordance with the International Residential Code. Adequate crawlspace drainage is not something that geotechnical consultants can verify; the purpose-of our visit is for observations of foundation bearing conditions only. Our work scope pertains to a geotechnical engineer's foundation excavation review only and the conditions existing and exposed at the time of our site visit. Within the limitations of scope, schedule and budget, GeoPacific attempted to execute these services in accordance with generally accepted professional principles and practices in the fields of geotechnical engineering and engineering geology at the time the report was prepared. No warranty, express or implied, is made. If you have any questions, please call. 14835 SW 72nd Avenue Tel(503)598-8445 Portland,Oregon 97224 Fax(503)941-9281 GEOPACIFIC Job No. 16-4108 Lot 24 River Terrace Crossing Sincerely, GeoPacific Engineering, Inc. PROFESS 14743E • OREGON 'ilk 23,Ae MS D.it,0' EXPIRES:06/30/20`_4 James D. Imbrie, G.E. Geotechnical Engineer