Loading...
AKS Engineering & Forestry ~ C240010 CITY OF TIGARD - CONTRACT SUMMARY & ROUTING FORM Contract Overview Contract/Amendment Number: C240010a1 Contract Start Date: 08/18/2023 Contract End Date: 12/31/2024 Contract Title: SRTS Templeton-Twality Improvements Contractor Name: AKS Engineering & Forestry Contract Manager: Jillian Pfeifer Department: PW-ENG Contract Costs Original Contract Amount: $383,121.00 Total All Previous Amendments: n/a Total of this Amendment: $22,326.00 Total Contract Amount: $405,447.00 Procurement Authority Contract Type: Personal Services Procurement Type: Formal RFP >$150K Solicitation Number: 2023-95076 LCRB Date: 08/15/2023 Account String: Fund-Division-Account Work Order – Activity Type Amount FY 24 460-8000-56005 95076-130 $22,326.00 Contracts & Purchasing Approval Purchasing Signature: Comments: DocuSign Routing Route for Signature Name Email Address Contractor John Christiansen johnc@aks-eng.com City of Tigard Steve Rymer stever@tigard-or.gov Final Distribution Contractor John Christiansen johnc@aks-eng.com Project Manager Jillian Pfeifer Jillian.pfeifer@tigard-or.gov Project Manager Shauna Large shauna@tigard-or.gov Project Manager Laura Barrie laurab@tigard-or.gov Buyer Toni Riccardi tonir@tigard-or.gov Rev. 8/21 Page 1 of 2 CITY OF TIGARD, OREGON AMENDMENT TO CONTRACT NUMBER C240010 FOR SRTS TEMPLETON – TWALITY IMPROVEMENTS AMENDMENT #1 The Agreement between the City of Tigard, a municipal corporation of the State of Oregon, hereinafter called City, and AKS Engineering & Forestry, hereinafter referred to as Contractor, is hereby amended as follows: 1. Services To Be Provided Section 2 of the Contract is amended to add additional scope for the trail in East Butte Heritage Park, see Exhibit B1. 2. Compensation Section 2 of the contract is amended to add funds for the trail in East Butte Heritage Park, see Exhibit B1. Section 2 is further amended to increase the total potential compensation payable under the contract by $22,326.00, for a new total of $405,447.00. Total payments to Contractor for services under this contract, including but not limited to services added by this amendment number 1, shall not exceed that new total without further amendment of the contract. IN WITNESS WHEREOF, City has caused this Amendment to be executed by its duly authorized undersigned officer and Contractor has executed this Amendment upon signature and date listed below. CITY OF TIGARD AKS ENGINEERING & FORESTRY Signature Signature Printed Name Printed Name Date Date DocuSign Envelope ID: F1439EC8-DE48-472A-AA86-777E82BCCE65 John Christiansen 4/29/2024 Steve Rymer 4/29/2024 AMENDMENT 1 SCOPE OF SERVICES The following scope of work will amend the current contract for the Tigard Safe Routes to School project to add scope for the analysis, design and construction support of pathway lighting along the trail in East Butte Heritage Park that connects the intersections of SW Murdock Street/SW 103rd Avenue and SW Murdock Street/SW106th Avenue in Tigard, Oregon. Task 1 Project Management Task 1.1 – Project Management Consultant will complete the followings tasks: · Prepare for and attend two meetings related to pathway lighting. Meetings are assumed to be held virtually. Task 3 Design Engineering Task 3.2 Prepare 90% Drawings, Specifications, and Estimate Consultant will Prepare lighting design plans and detail sheets for the pathway lighting following guidelines outlined in the City of Tigard Engineering Design Manual (August, 2022). The 90% submittal will include the following work to complete the design: · 90% Pathway Lighting Plans (1) and Detail Sheets (2) · Special Provisions · Bid Item Descriptions · 90% Construction Cost Estimate Task 3.3 Final Drawings & Bid Package Consultant will prepare 100% drawings, specifications and cost estimate. Address City comments from 90% submittal. · Prepare one bid addenda. · Prepare CAD file Package for the Contractor Task 3.4 Prepare Fixture Alternatives Analysis Consultant will assist the City early in the design process to evaluate various lighting options for the path through the park. A brief memo explaining pedestrian lighting options will be prepared. A meeting will be conducted with the City to discuss lighting options. This high-level lighting options evaluation will be further developed in an alternatives analysis that evaluates specific bollard style lighting options that will be chosen for the project. Consultant will complete an alternatives analysis of up to three different lighted bollard standards for the pathway and prepare a brief memorandum comparing costs, necessary fixture spacing, pathway lighting targets, and other relevant information to the pathway lighting design. Work products will include: · Draft Alternatives lighting analysis memorandum · Final Alternatives lighting analysis memorandum Exhibit B1DocuSign Envelope ID: F1439EC8-DE48-472A-AA86-777E82BCCE65 Templeton/Twality Improvements – Amendment 1 City of Tigard March 1, 2024 Page 2 of 3 Task 8 Construction Administration Services Task 8.1 Weekly Meetings/Coordination Consultant will complete the following as needed to support construction: · Review up to 3 submittals for materials required for pathway lighting · Log and respond to up to 2 RFIs, Clarifications, Change Order Requests, Work Change Directives and Change Orders. Task 8.3 Record Drawings Consultant will complete the following: · Prepare record drawings showing the as constructed facilities based on construction observation, contractor provided notes, and survey verification related to pathway lighting. Drawings shall be provided in PDF format and AutoCAD format. DocuSign Envelope ID: F1439EC8-DE48-472A-AA86-777E82BCCE65 Templeton/Twality Improvements – Amendment 1 City of Tigard March 1, 2024 Page 3 of 3 DocuSign Envelope ID: F1439EC8-DE48-472A-AA86-777E82BCCE65