Anderson Krygier, Inc. Dba Knot Studio ~ C230031 CITY OF TIGARD - CONTRACT SUMMARY & ROUTING FORM Contract Overview Contract/Amendment Number: C230031a1 Contract Start Date: 03/08/2023 Contract End Date: 12/31/2025 Contract Title: Nick Wilson Memorial Plaza/Driveway Design and Engineering Contractor Name: Anderson Krygier, Inc dba Knot Studio Contract Manager: Sean Farrelly Department: CD Contract Costs Original Contract Amount: $430,737.00 Total All Previous Amendments: n/a Total of this Amendment: $33,463.00 Total Contract Amount: $464,200.00 Procurement Authority Contract Type: Personal Services Procurement Type: Formal RFP >$150K Solicitation Number: 2023-01 LCRB Date: 03/07/2023 Account String: Fund-Division-Account Work Order – Activity Type Amount FY 24 940-8000-56005 97027-130 $33,463.00 FY FY FY Contracts & Purchasing Approval Purchasing Signature: Comments: adding scope and funds DocuSign Routing Route for Signature Name Email Address Contractor Marilee Hanks mhanks@knot.design City of Tigard Kenny Asher kennya@tigard-or.gov Final Distribution Contractor Marilee Hanks mhanks@knot.design Project Manager Sean Farrelly sean@tigard-or.gov Project Manager Laura Barrie laurab@tigard-or.gov Project Manager Shauna Large shaunal@tigard-or.gov Buyer Toni Riccardi tonir@tigard-or.gov Rev. 8/21 CITY OF TIGARD, OREGON AMENDMENT TO CONTRACT NUMBER C230031 FOR NICK WILSON MEMORIAL PLAZA/DRIVEWAY DESIGN AND ENGINEERING AMENDMENT #1 The Agreement between the City of Tigard, a municipal corporation of the State of Oregon, hereinafter called City, and Anderson Krygier, Inc. DBA Knot Studio, hereinafter referred to as Contractor, is hereby amended as follows: 1. SERVICES TO BE PROVIDED Section 2 of the Contract is amended to add additional scope as provided in Exhibit A of this amendment. 2. COMPESATION Section 3 of the Contract is amended to increase the total potential compensation by Thirty-Three Thousand Four Hundred Sixty-Three and No/100 ($33,463.00), to a new not to exceed amount of Four Hundred Sixty-Four Thousand Two Hundred and No/100 ($464,200.00). Except as expressly provided in this contract amendment, all other terms remain unchanged. IN WITNESS WHEREOF, City has caused this Amendment to be executed by its duly authorized undersigned officer and Contractor has executed this Amendment upon signature and date listed below. CITY OF TIGARD ANDERSON KRYGIER, INC. DBA KNOT STUDIO Signature Signature Printed Name Printed Name Date Date DocuSign Envelope ID: 500C57FC-8737-4ED0-8798-4EDED695897B 4/23/2024 Marilee HanksKenny Asher 4/23/2024 Rev. 8/21 EXHIBIT A SERVICES TO BE PROVIDED INTRODUCTION Contractor will provide additional Landscape Architectural Services for the Nick Wilson Plaza Project. SCOPE OF WORK Contractor will complete the following tasks: A. Truck Turning Analysis a. Confirm design vehicle software and layout truck movements and check for conflicts. b. Prepare draft memo and exhibit. c. Revise analysis per comments, if any. d. Finalize memo. B. Update Crosswalk Design a. Modify crosswalk design at a location further north, partially on the bridge structure and impact slab. b. Improvements include widening the sidewalk and potentially narrowing the diagonal parking stall depth along the west side of the bridge. c. Coordinate with Structural Engineer on potential modifications to walkways and improvements that may interface with the existing bridge impact slab. d. Cost is for Schematic Design work only. Existing fees in Task 7 scope will be applied to all subsequent phases. e. Work assumes no impacts to the storm water planters to the north and that no new storm water facilities will be required. C. Structural Engineering a. Provide structural engineering for sidewalk replacement on bridge structure and impact slab. The existing sidewalk is assumed to be an overlay, not a structural component of the bridge. b. Anchorage of one type of relocated or replaced light pole and one type of pedestrian crossing flashing light on the bridge impact slab. c. Abutment/End wall modifications to widen plaza entrance per Schematic Design drawings. SCHEDULE MILESTONES The addition of these services will not extend the length of this Contract. All work will be completed by December 31, 2025. COST/RATE ESTIMATES Task (Contractor or Sub) Cost Truck Turning Analysis (Pace Engineering) $4,187 Crosswalk Design (Pace Engineering) $22,156 Sidewalk/Abutment/Light Pole Engineering (WDY Engineering) $5,094 Coordination and Design (Knot Studio) $2,026 Total Fee $33,463 DocuSign Envelope ID: 500C57FC-8737-4ED0-8798-4EDED695897B