Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Plans
TRG Tigard Office i3up �-600 g F GENERAL NOTES: x,` 9570 SW Tigard St, Tigard , OR 97223 r : � 1.TO THE BEST OF OUR KNOWLEDGE, THESE PLANS AND SPECIFICATIONS COMPLY WITH THE APPLI ALi I#U4LfVG CODES - J ' :. ,#, +i .• AND THE APPLICABLE FIRE SAFETY STANDARDS AS DETERMIND IN ACCORDANCE WITH OREGON S 5.- 2.ALL MATERIALS USED IN PROJECT TO BE INSTALLED ACCORDING TO MANUFACTURER'S SPECIA�;AT1ONS - � �� �? a is ? , - �,. _ ,4. .. ` *� 4 j ,.t" `" k � K ' 3.ALL CHANGES REQUESTED BY CLIENT OUTSIDE OF THE CONTRACT WILL RESULT IN AN EXTRA WORK ORDER CONTRACT, - r. r "- . IN THE AMOUNT SPECIFIED BY THE CONTRACTOR 'r,r 4. BUILDING PERMITS ARE REQUIRED BY THE CITY OR COUNTY IN WHICH THE PROJECT ADDRESS RESIDES . �� � � �,c+�°� �: �r a tom' ` '� 5. FULL BUILDING PERMITS ARE REQUIRED FOR PROJECTS THAT HAVE STRUCTURAL ELEMENTS INCLUDED FOR REPAIR, REPLACEMENT, OR ALTERATION. " - 6. FULL BLUEPRINTS WITH ENGINEERING WILL BE REQUIRED FOR ALL FULL BUILDING PERMITS 7. PROJECTS THAT ARE NON-STRUCTURAL MAY ONLY REQUIRE TRADE PERMITS r ,_ - PROJECT INFORMATION 1 �" ,,a,.2 SAE-,,,, 1. - " YEAR BUILT 1980 �_ --_._ JURISDICTION: Tigard/Washington ' ,, . - SUBDIVISION: CPO 4B Bull Mountain-Tigard LOT NUMBER: No.W2578177 TAX LOT: 2S102VA0090 ti ,, h£ TAX MAP/PARCEL NUMBER: 901/R462449 - ELEVATION 160 FT ,, LOCATION MAP(NTS)(N S) TOTAL LAND AREA: 0.44 ACRES ,p4r .. - LAND TYPE: COM .. � .. � THIS IS NOT A SURVEY! SQUARE FOOTAGE CALCULATIONS PROJECT CONTACTS .>> ' '".,� DIMENSIONS ARE BASED ON VISUAL OWNER: ENGINEER: 9 9 OBSERVATIONS ONLY AND MAY NOT BE USED BUILDING AREA: 18,963 SQ FT Tyler Hart Properties TO DETERMINE THE LOCATION OF PROPERTY 10019 SW Concho Ct LINES PROJECT SCOPE Tualatin, OR 97062 971.221.6852 Steve@theremodelgroup.com s All New MEP; Bathroom Remodel; Kitchen (-IN, a - - eF Remodel;Remove Walls from East End Area to PLANS: CONTRACTOR: '-,� , 'F. Open Up for Storage; Move Stairs Into Storage THE REMODEL GROUP THE REMODEL GROUP Slightly Sout to Accommodate Bath Remodel; 20400 SW AVERY COURT 20400 SW AVERY COURT ADA Upgrades TUALATIN, OR 97062 TUALATIN, OR 97062 VICINITY MAP(NTS) 503.869.1290 503.869.1290 T.H.E. Remodel Group A100-Site Plan COVER PAGE �( A101-As Buitt-First Floor 20400 SW Avery emo Court, Tualatin, OR 97062 p A103-Ds Built-Sewn d Floor t Floor S� -�)r (503) 869.1290 ? aios-Floorplan First Floor a'C l Project number TRG Tigard Office W A106-Floorplan-Second Floor Date C P LU A107-Electrical Plan-First Floor www.theremodel rou .com N Drawn by A108-Electrical Plan-Second Floor TRG g p A109-Exterior Elevations Checked by TRG Scale 13'-2" t T' 12'-0" 6'-9" -CV I" ft / a. 1 \ )1. ,.., ,J-s, (V Back Hallw 17 10'-4" 13'-s" /Q Bedroom 2 6, lb - R - - - 0 00 - Refrgt or o I of DW 1 —UP — — co b� —DN 0 ICI 1 1 - - - - Hallway/Storage Ran I - - - _ N i \ Closet WH i j III _ Main Space = M Bathroom I 1 G �, ED a Bedroom 1 1 i 11'-3"-I / / \ H�� H 1 I B 9 19'-3" / 1 25'-2" OFirst Floor m 1/4" = 1'-0" Cp N I The Remodel Group - New Office As Built - First Floor T.H.E. REMODEL GROUP Sheet number A101 20400 SW AVERY COURT Date 4/11/2023 3:19:56 PM A 101 - REMODEL 0 TUALATIN, OR 97062 9570 SW Tigard St, Tigard, OR 97223 Drawn by TRG 503.869.1290 Checked by TRG Scale 1/4"= 1-0" 4111111, Storage ` Upstairs Bedroom DN 4 Second Floor EiD 3/8" = 1'-0" N The Remodel Group - New Office As Built - Second Floor - T.H.E. REMODEL GROUP Sheet number A102 20400 SW AVERY COURT Date 4/11/2023 3:19.48 PM A102 Mop TUALATIN, OR 97062 9570 SW Tigard St, Tigard , OR 97223 Drawn by TRG RE503.869.1290 Checked by TRG Scale 3/8"= 1-0" 1, A 7 —) I I 7 = = _/-/ /—I Back Hallw a Bedroom 2 Ir• _� efr UP III DN �� � �u� ° 1 9 III DW � L��� � - - - - II Hallway/Storage Ran 1 I [-- ....LtII 1 \ II I r \ ! Closet II I I( wH/) 1 0 -) l II \ 1 I II Main Space I I � , o L I I Bathroom ( °:) _ - QI Bedroom 11 _ i P. 9 Change Door Swing I- L _ Y H E- m -> H 1 R P O Demo Plan - First Floor CO 1/4" = 1'-0" N The Remodel Group - New Office Demo Plan - First Floor . T.H.E. REMODEL GROUP Sheet number A103 20400 SW AVERY COURT Date ;/ /2o2331935PM11 : : A103 - REMODEL GROUPTUALATIN, OR 97062 9570 SW Tigard St, Tigard , OR 97223 Drawn by RG 503.869.1290 Checked by TRG Scale 1/4"= 1'-0" 12'- 11 1/2" \ \ . IT 1 7 • -It 19'-3" / A \ \ J Owner 151 SF Storage Mini Water Heater Access 10'-4" Under Sink lb ; al Mr \ i I 34'-2" U � 1DN62 SF — - -' 1 1 I I Ki hen ) i•-. — _ N Storage 66 F 1 61 SF 1— — T � —1 — - 6 Refrigerato- ° i "' d Co \ Storage , , Closet 372 SF Office Manager 11 SF Bathroom 194 SF _zo� = 58SF r \ `f)) �� 3'-71/2" r — — —or-..— 1 4 i O CO _ N____ ��� I 4 L Estimator 4 c"I. ,:„ °' U' "i 99 SF4 . 11'-3" b 71 J/ Mini Water 10'-9 1/2" 1111 14'-2 1/2" Heater Tank Under the Sink \ \ `, H W H .l I I I I \ \ <- -/ 26'-5" / / OFirst Floor 1/4" = 11-0" N The Remodel Group - New Office Floorplan - First Floor • T.H.E. REMODEL GROUP Sheet number A104 20400 SW AVERY COURT Date 4/11/2023 6:21:43 PM A104 - REMODEL GROUP TUALATIN, OR 97062 9570 SW Tigard St, Tigard , OR 97223 Drawn by TRG 503.869.1290 Checked by TRG Scale 1/4 = 1 0 N DN 0 0 bo 00 N 14'-2" Flat Landing < DN E 8 -0 11'-9 f19'-9" A 7 OFirst Floor- ADA Ramp 1/4" = 1'-0" The Remodel Group - New Office ADA Ramp T.H.E. REMODEL GROUP Sheet number A105 20400 SW AVERY COURT Date 4/11/2023 6:22:05 PM A105 TUALATIN, OR 97062 9570 SW Tigard St, Tigard, OR 97223 Drawn by TRG REMODEL GROUP 503.869.1290 Checked by TRG Scale 1/4"= 1'-0" • 22'-5" - - - - - / 7'- 10" 14'-4" // R Storage M 88 SF Storage DN 106 SF 2'-6„ • \ / H I O Second Floor EI{Di 3/8" = 1'-0" N The Remodel Group - New Office Floorplan - Second Floor - T.H.E. REMODEL GROUP Sheet number A106 20400 SW AVERY COURT Date ;/ /2o2311 6:22:18 PM A106 TUALATIN, OR 97062 9570 SW Tigard St, Tigard , OR 97223 Drawn by RG REMODEL GROUP503.869.1290 Checked by TRG Scale 3/8"= 1'-0" I-1 i Duplex Outlet 0 6"LED Wafer cFi Exhaust Fan w. Light Kit GFCI Outlet - O Smoke&CO2 Units I 1 Single Switch i�Th 2 I Vanity Light Double Switch $T I Exterior Light - Dusk to Dawn r Timer Switch n f t t OPower Plan O RCP 3/16" = 1'-0" 1/4" = 1'-0" t I 1 Itil it 1 It t 14t h t 4 1 1.i �� 1 1 - - h-CrH m ms._me © \ t N :. 5 ,^N� - v -s s ,..:,cross: ____, _,__.__,_._I O Electrical Plan - Second Floor IEE) 3/8" = 1'-0" N The Remodel Group - New Office Electrical Plan - Second Floor T.H.E. REMODEL GROUP Sheet number A108 20400 SW AVERY COURT Date 4/11/2023 6:22:52 PM A108 REMODEL GROUP TUALATIN, OR 97062 9570 SW Tigard St, Tigard, OR 97223 Drawn by Author 503.869.1290 Checked by Checker Scale As indicated 20Roof _ _ _ Second FloorCeilin 13' - 0" Second Floor 8' 0" EE'l ) 1 / 1,1+H+ 17 WILL 11I r1 r-i 1 - - --- ---11ffislaill I Ili11111 r:_.a rl.. .._ I1Uft1ft11L _ _ —Ramp Landin -0' - 8" Grounu I ONorth -1' - 4" 1/8" = 1'-0" — Roof ogik 20' - 0" 1 t Second Floor ' ((' 8' - 0" t — — — First Floor — _ j — _ — _ _ Ramp Landin „ 0' _ 0" i -0 --8 Ground L el O West -1' - 4" 3/16" = 1'-0" PRELIMINARY - NOT FOR CONSTRUCTION The Remodel Group - New Office Exterior Elevations T.H.E. REMODEL GROUP Sheet number A109 20400 SW AVERY COURT Date ; 1/2o2362347PM/1 : : A109 • REMODEL GROUP TUALATIN, OR 97062 9570 SW Tigard St, Tigard , OR 97223 Drawn by RG 503.869.1290 Checked by TRG Scale As indicated