Loading...
Report (2) DocuSign Envelope ID:08ABE211-D9F2-4DA5-97BD-855CB8A1A009 RECEIVED ApR City ofTigard 6 2023 CITY OF TIC,,> D Deferral Until Occupancy Request BUILDING DIVISION I c, l:n Washington County Transportation Development Tax(TDT),Transportation and Parks System Development Charges(SDCs) This form is to be signed and submitted prior building permit issuance or,if no building permit is required,then upon land use approval(TMC 3.24,as amended by Ordinance No.21-09). Date: 3/30/2023 Site Address: 15249 SW Flatcreek Ln Project River Terrace Crossing Land Use Case or Name: Building Permit#: MST2023-00111 (Pacific Lifestyle Homes) Tax Lot 2S1080C11000 Total Parks #: Amount*: $11,I130:00 Lot 118 TDT Total TSDC Amount: N/A Amount*: $12,004.00 *The total TSDC amount shown above is the sum of$7.760.00 for TSDC-Improvement,$ 448.00 for TSDC- Reimbursement,and$3,796.00 for TSDC-River Terrace,if applicable.. *The total Parks SDC amount shown above is the sum of$6.812.00 for Parks-Improvement,$ 1,887.00 for Parks- Reimbursement,and either$ N/A for Parks-Neighborhood or$3.131.00 for Parks-Neighborhood River Terrace. This constitutes my request to defer payment of the TDT,TSDC,and Parks SDCs,as provided above, until occupancy. Payment of the TDT,TSDC,and Parks SDCs may be deferred until issuance of the occupancy permit. In requesting this option,I understand that any deferred TDT,TSDC,and Parks SDCs must be paid prior to final inspection or issuance of an occupancy permit. TDT may only be deferred if the TDT is greater than the amount for a single-family residence. I further understand that the amount of TDT due on deferred obligations shall be the amount in effect at the time of issuance of the building permit. For a deferral request to be accepted both the Property Owner and the Developer must sign this request. DocuSiyned by: ` ��°ASS fiat outtn, 4/4/2023 Property Owner: P `„p ,Fa Date: Developer: ( Date: Y? Permit Coordinator. if/4 _detfrielVLI Date: 4/6/2023 r /1/* : ��-z 3/2-3 SYJ cites l a4td ,ki#i17--Glas