Report (3) J3262
City of Tigard rtr'F ri:IVE rl..„,,,,,„. t,„ RTC95
; -- Deferral Until Occupancy Request HIA, '-; 0 2023
111
. g
TIGARD Washington County Transportation Development Tax (TD11,1Vraits0 n and Parks System
Development Charges (SDCs)
This form is to be signed and submitted prior building permit issuance or,if no building permit is required,then
upon land use approval(TMC 3.24,as amended by Ordinance No.21-09).
- =
Date: 4/6/2023 Site Address: 15094 SW Flatcreek Ln.
Project River Terrace Crossing Land Use Case or
Name: (Stone Bridge Homes) Building Permit#: MST2023-00116
Tax Lot 2S1 08DC23000 Total Parks
1 #: Lot 95 Amount*: $11,830.00
•
TDT Total TSDC
$1 2,004.00
Amount N/A , Amount*:
1
*The total TSDC amount shown above is the sum of$7,760.00 for TSDC-Improvement,$ 448.00 for TSDC-
Reimbursement,and$3,796.00 for TSDC-Rivet Terrace,if applicable..
*The total Parks SDC amount shown above is the sum of$6,812.00 for Parks-Improvement,S1,887.00 for Parks-
Reimbursement,and either$ N/A for Parks-Neighborhood or$3,1 31.00for Parks-Neighborhood River Terrace.
This constitutes my request to defer payment of the TDT,TSDC, and Parks SDCs,as provided above,to
prior to final inspection.
Payment of the TDT,TSDC,and Parks SDCs may be deferred until issuance of the occupancy permit In
requesting this option, I understand that any deferred TDT,TSDC,and Parks SDCs must be paid prior to final
inspection.
TDT may only be deferred if the TDT is_greater than the amount for a single-family residence. I further
understand that the amount of TDT due on deferred obligations shall be the amount in effect at the time of
issuance of the building permit.
For a deferral request to be accepted both the Property Owner and the Developer must sign this request.
Property Owner: K.e, g Ce3. Date: 3-27-2023
Ofm ,e3",,,ba.44. 03/27/2023
Developer: Signiv In-AlMAAC4MTX8 Date:
Permit Coordinator: A Oef/.11 ' AlKein-1 Date: 4/6/2023
I