Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Specifications
(>25r 2023-00 I3b ION C EIVED ION Solar 4801 N University Ave.Suite 900 APR 1 2 2023 Provo, UT 84604 CITY OF TICARD luke.rowley@ionsolar.com Friday,April 7,2023 BUI�-DI DIVISION RE: Derek A Demoss Residence-6770 Southwest Taylors Ferry Road, Portland, Oregon To Whom It May Concern: I have evaluated the roof structural elements of the residence for the required design loads and the additional will be imposed by the proposed solar system.The existing roof information was provided by a site visit at ION Solar. Based on that site visit,it is my understanding that the roof framinglos load that by an audit team information is as follows: Roof Structure: Pre-Manufactured Wood Trusses with 2x4 Top Chords @ 24"O.C. Roofing Material: Composition Shingle The Required codes and loads are as follows: Codes 2019 OSSC, 2021 ORSC, Load Standard:ASCE 7-16 Risk Category: I I Wind Speed(3-Sec Gust, MPH): 96, Exposure Categgy: B Ground Snow Load(psf): 36 COPY Roof Snow Load(psf): Roof Live Load 26 (psf): 20(superseded by roof snow load) After reviewing the existing roof framing information and in accordance with the structural calculations which were performed according to the applicable codes and loads above, it is my recommendation ing roof framing is adequate to safely and sufficientlysupport on sheet S-5 system as is.Alteration or replacement of existing leme is isred tnotlesign loads and the weight of thehat the 'ntew solar required. This evaluation only applies to the areas of the roof that will be directly supporting the solar system any recommendations for any other structural components of the building.The racking must be installed er manufacturer's recommendations. y m and does not make p the The 5/16"x 3-1/2"zinc plated steel lag screw used to attach the solar system to the roof must be staggered distribute the loads over the affected area and must penetrate the truss top chords with a minimum emb to evenly ccsa PROFFS embedment depth Sincerely, �`� ‹c'�G I N£F sio THIS LETTER VOID UNLESS STAMPED A. Luke Rowley, PE �(" �' r 9 950P OREGON `qN it, 20ti�,1 `qN ROWS-c' 04/10/2023 EXPIRES:12/31/24 RECEIVED APR 12223 CITY OF T G'":-' BLJ LL4I'C DIC, \I ... .•••. SILFAB PRIME SILFAB .�� sip-400 HC+ SOLAR' OFFICE COPY RELIABLE ENERGY. DIRECT FROM THE SOURCE . PROUD PARTNER OF Designed to outperform. Dependable, durable, high-performance ION solar panels engineered for North 'Y American homeowners. SILFABSOLAR.CoM ELECTRICAL SPECIFICATIONS ], 400 Test Conditions .. STC : NOCT Module Power(Pmax) Wp 400 Maximum power voltage(Vpmax) V 298 36D5 33.50 Maximum power current(Ipmax) A 11.10 ' Open circuit voltage(Voc) V 43.02 8.90 Short circuit current(Isc) 40.35 A 11.58 Module efficiency 934 20.296 Maximum system voltage(VDC) V 18.8% 1000 Series fuse rating A 20 Power Tolerance Wp 0to+10 Measurement conditions:STC 1000 W/m'•AM 1.5•Temperature 25°C•NOCT 800 W/m'•AM 1.5•Measurement uncertainty s 3% Sun simulator calibration reference modules from Fraunhofer Institute.Electrical characteristics may vary by±5%and power by 0 to+10W. MECHANICAL PROPERTIES/COMPONENTS METRIC 1 IMPERIAL Module weight 21.3kg±0.2kg 471bs±0.41bs Dimensions(H x L x D) 1914mm x 1036mm x 35mm 75.3 in x 40.8 inx1.37 in Maximum surface load(wind/snow)" 5400 Pa rear load/5400 Pa front load 112.81b/ft'rear load 112.816ft'Hail impact / front load r / resi stance e 25 mm at 83 km/h elfin at 51.6 mph Cells 132 Half cells-Si mono PERC 132 Half cells-Si mono PERC 9 busbar-83 x 166 mm 9 busbar-3.26 x 6.53 in Glass 3.2 mm high transmittance,tempered, 0.126 in high transmittance,tempered, DSM antireflective coating DSM antireflective coating Cables and connectors(refer to installation manual) 1350 mm,0 5.7 mm,MC4 from Staubli 53 in,0 0.22 in(12AWG),MC4 from Staubli Backsheet High durability,superior hydrolysis and UV resistance,multi-layer dielectric film, fluorine-free PV backsheet Frame i Anodized Aluminum(Black) Bypass diodes 3 diodes-30SQ045T(45V max DC blocking voltage,30A max forward rectified current) Junction Box UL 3730 Certified,IEC 62790 Certified,IP68 rated Temperature Coefficient lsc +0.064%/°C Module product workmanship warranty 25 ears""Temperature Coefficient Voc -0.28%/°C y Linear power performance guarantee 30 years Temperature Coefficient Pmax -0.36'o/°C NOCT(±2°C) 45°C a 97.1%end 1st yr >_91.8%6%end 12th yr Operating temperature -40/+85°C >_85.1%end 25th yr >_82.6%end 30th yr CERTIFICATIONS SHIPPING SPECS UL 61215-1:2017 Ed.1""",UL 61215-2:2017 Ed.1***,UL 61730-1:2017 Ed.1""",UL 61730- 2:2017 Ed.1"",CSA C22.2#61730-1:2019 Ed 2 ",CSA C22.2#61730-2:2019 Ed.2""", Modules Per Pallet: 26 or 26(California) Product IEC 61215-1:2016 Ed.1""",IEC 61215-2:2016 Ed.1"",IEC 61730-1:2016 Ed.2""",IEC 61730-2:2016 Ed.2"",IEC 61701:2020(Salt Mist Corrosion),IEC 62716:2013(Ammonia I Pallets Per Truck �'1 32 or 31(California) Corrosion),UL Fire Rating:Type 2,CEC Listing"" Factory ISO9001:2015 Modules Per Truck 832 or 806(California) ." A Warning.Read the Safety and Installation Manual for mounting specifications and before handling,installing and operating modules. 12 year extendable to 25 years subject to registration and conditions outlined under"Warranty"at silfabsolar.com. PAN files generated from 3rd party performance data are available for download at:silfabsolar.com/downloads. """ Certification and CEC listing in progress.December 2022,expected completion. ION v E T +1888.781.7074 •.-.. 12.1"[307mm] ".-- 51.2[1300mm] 12.1"[307mm] ION 5 O L A R.C O M ( "-) -Mounting Hole(x4) �� SILFAB SOLAR INC. =z -- I 800 Cornwall Ave 0.5" \ Bellingham WA 98225 USA [12mm] �� T+1 360.569.4733 f- T 1 Ti info@silfabsolar.com a SILFABSOL AR COM E T 1770 Port .3355 Drive m 11., 35mil D� , Burlington WA 98233 USA-�� "I o, / °' _o T+1 360.569.4733 I4t. L II N w 0, o 240 Courtneypark Drive East T= v Mississauga ON L5T 2Y3 Canada 0.06" Ern T+1905.255.2501 ,3 53.15" F+1 905.696.0267 y,` [1.5mm] _ -.-T [1350mm] i&c . 7 Cable Length ' x- 2 Silfab•514400-HC+-y0221114 _I-Drainage Hole(x8) - o No reproduction of any k aa allowedwnnouc v_(/ L) 0 permissionData and information is subject sublectto l _ `-� modifications without tInc ici- . Silfab Solar In, 2022 Silfab is f b5 Solar' aregistered trademark of 2.4"[60mm] -j snfabs 1 Inc. 8"[200mm] • 'ENPHASE DATA SHEET 111 ';� F PySS£ s Q e:i IQ8« I� 11111 IQ8 and IQ8+ Microinverters Easy to install Our newest IQ8 Microinverters are the industry's first microgrid-forming,software- • Lightweight and compact with defined microinverters with split-phase power conversion capability to convert DC power to AC power efficiently.The brain of the semiconductor-based microinverter plug-n-play connectors is our proprietary application-specific integrated circuit(ASIC)which enables the ' Power Line Communication microinverter to operate in grid-tied or off-grid modes.This chip is built in advanced (PLC)between components 55nm technology with high speed digital logic and has super-fast response times • Faster installation with simple to changing loads and grid events,alleviating constraints on battery sizing for home two-wire cabling energy systems. High productivity and reliability Enphase • Produce power even when the grid is down* • More than one million cumulative year limited hours of testing warranty • Class II double-insulated Part of the Enphase Energy System,IQ8 Series I08 Series Microinverters redefine reliability enclosure Microinverters integrate with the Enphase IQ Battery, standards with more than one million cumulative • Enphase IQ Gateway,and the Enphase App monitoring hours of power-on testing,enabling an industry- Optimized for the latest high and analysis software. leading limited warranty of up to 25 years. powered PV modules Microgrid-forming (21) CERTIFIED • Complies with the latest advanced grid support** • Remote automatic updates for the latest grid requirements Connect PV modules quickly and easily to IQ8 Series IQ8 Series Microinverters are UL Listed as Microinverters using the included Q-DCC-2 adapter PV Rapid Shut Down Equipment and conform with • Configurable to support a wide cable with plug-n-play MC4 connectors. various regulations,when installed according to range of grid profiles manufacturer's instructions. • Meets CA Rule 21(UL 1741-SA) requirements ©2022 Enphase Energy.All rights reserved.Enphase,the Enphase logo,IQ8 Microinverters,and other names are trademarks of Enphase Energy,Inc.Data subject to change. "Only when installed with IQ System Controller 2, meets UL 1741. I08SP-DS-0002-01-EN-US-2022-03-17 **IQ8 and IQ8PIus supports split phase,240V installations only. IQ8 and IQ8+ Microinverters INPUT DATA IDCI IQ8-60-2-US IQ8PLUS-72-2-US Commonly used module pairings' W 235-350 235-440 Module compatibility 60-cell/120 half-cell 60-cell/120 half-cell,66-cell/132 half-cell and 72-cell/144 half-cell MPPT voltage range V 27-37 29-45 Operating range V 25-48 25-58 Min/max start voltage V 30/48 30/58 Max input DC voltage V 50 60 Max DC current'[module Isc] A 15 Overvoltage class DC port II DC port backfeed current mA 0 PV array configuration 1x1 Ungrounded array;No additional DC side protection required;AC side protection requires max 20A per branch circuit OUTPUT DATA IACI 108-60-2-US IQ8PLUS-72-2-US Peak output power VA 245 300 Max continuous output power VA 240 290 Nominal(L-L)voltage/range' V 240/211-264 Max continuous output current A 1.0 1.21 Nominal frequency Hz 60 Extended frequency range Hz 50-68 AC short circuit fault current over 3 cycles Arms 2 Max units per 20 A(L-L)branch circuit` 16 13 Total harmonic distortion <5% Overvoltage class AC port III AC port backfeed current mA 30 Power factor setting 1.0 Grid-tied power factor(adjustable) 0.85 leading-0.85 lagging Peak efficiency % 97.5 97.6 CEC weighted efficiency 97 97 Night-time power consumption mW 60 MECHANICAL DATA Ambient temperature range -40°C to+60°C(-40°F to+140°F) Relative humidity range 4%to 100%(condensing) DC Connector type MC4 Dimensions(HxWxD) 212 mm(8.3")x 175 mm(6.9")x 30.2 mm(1.2") Weight 1.08 kg(2.38 Ibs) Cooling Natural convection-no fans Approved for wet locations Yes Pollution degree PD3 Enclosure Class II double-insulated,corrosion resistant polymeric enclosure Environ.category/UV exposure rating NEMA Type 6/outdoor COMPLIANCE CA Rule 21(UL 1741-SA),UL 62109-1,UL1741/IEEE1547,FCC Part 15 Class B,ICES-0003 Class B,CAN/CSA-C22.2 NO.107.1-01 Certifications This product is UL Listed as PV Rapid Shut Down Equipment and conforms with NEC 2014,NEC 2017,and NEC 2020 section 690.12 and C22.1-2018 Rule 64-218 Rapid Shutdown of PV Systems,for AC and DC conductors,when installed according to manufacturer's instructions. (1)No enforced DC/AC ratio.See the compatibility calculator at https://link.enphase.com/module-compatibility (2)Maximum continuous input DC current is 10.6A(3)Nominal voltage range can be extended beyond nominal if required by the utility.(4)Limits may vary.Refer to local requirements to define the number of microinverters per branch in your area. IQ8SP-DS-0002-01-EN-US-2022-03-17 OD CO as - v or nsta ers. :y nsta COMPLETE . RAIL BAS ED RACKING SYSTEM INSTALLATION GLJIDE REVISION DATE: 03/03/22 VERSION: v2,7 ECOFASTENSOLAR.COM REVISION DATE:03/3/22 VERSION:v2.7 /2222111, INSTALLATION GUIDE a0D ooa ECoFastenw For Installers. By Installers. Clicking the page name will take you to that page TABLE OF CONTENTS PAGE 01 FEATURES & BENEFITS PAGE 02 INTRODUCTION PAGE 03 OVERVIEW PAGE 04 COMPONENTS PAGE 05 RATINGS PAGE 06 ARRAY LAYOUT PAGE 07 INSTALLATION PAGE 08 GROUNDING PAGE 17 ACCESSORIES PAGE 21 MODULE LIST PAGE 27 CLAMP PART NUMBERS PAGE 36 PAGE 01 REVISION DATE:03/3/22 VERSION:v2.7 CLICK INSTALLATION GUIDE oa EcoFasten. For Installers. By Installers. Imo. 4100 CLICKFIT ClickFit conforms to UL 2703 and is one of the fastest installing rail-based systems in the industry. Thanks to its Click-In Rail assembly, the rails can be connected to any of EcoFasten's composition shingle, tile, and metal roof mounts in seconds without the need for fasteners or tools. The ClickFit system is made of robust materials, such as aluminum and coated steel, to ensure corrosion resistance and longevity. ClickFit has been tested in extreme weather conditions including wind,fire, and snow. FEATURES • Tool and fastener free rail attachment • Fully integrated bonding • Click-on Mid & End Clamps • Compatible with a variety of EcoFasten roof attachments PAGE 02 REVISION DATE:03/3/22 VERSION:v2.7 CLICK INSTALLATION GUIDE ;Oa EcoFasttlla, v For Installers. By Installers. INTRODUCTION This manual describes the installation of the ClickFit mounting system for photovoltaic modules on steep-slope roofs. Described within are details for composition shingle and tile, attachments for ClickFit System. Other roof types as well as all other installation manuals can be found for download at www. EcoFastenSolar.com. GENERAL INSTALLATION CONDITIONS Failure to observe the requirements in this document can lead to the exclusion of all guarantees and product liability. EcoFasten Solar reserves the right to amend this document without prior notice. STABILITY AND CONDITION OF THE ROOF The roof must be in good condition and strong enough to support the weight of the modules, including the additional equipment, wind and snow loads. When in doubt, consult with the engineer of record, and/or the local building inspector. APPLICATION RANGE OF CLICKFIT Refer to Compatibility module list at the end of this document. Please refer to the Ecofasten ClickFit span tables for system structural certification and allowable spans. WARRANTY Guarantee according to the warranty conditions and general terms and conditions of EcoFasten Solar. These conditions can be found on the website at www. EcoFastensolar.com. LIABILITY EcoFasten Solar cannot accept any liability whatsoever for damage or injury caused by not taking adequate safety precautions or(accurately)following the instructions given, or resulting from negligence during the installation of the product and any corresponding accessories specified in this document. PAGE 03 REVISION DATE 03/3/22 VERSION:v2.7 MEIN INSTALLATION GUIDE 0' ooa EcoFastenR For Installers. By Installers. OVERVIEW The ClickFit mounting system consists of patented adjustable tile hooks and feet, rails, and the installation materials required for the mounting of hoto L olta modules on composition shingle or tile roofs. For simplicity, tile hooks and L feetic will be referred to as "attachments". ATTACHING TO THE ROOF The attachments are fastened to the rafters. Attachments are height-adjustable to level the system on uneven roof surfaces. ATTACHING THE RAIL The rail assembles to the attachments with a click-connector, or Clicker. T simply clicks into place without the use of any tools, he rail ATTACHING THE MODULES The modules are attached to the rails by means of mid clamps and end clAr- ,Ips. Installer must review module and any 3rd party manufacturer's documents compatibility and compliance with warranty terms and conditions. tion for PAGE 04 REVISION DATE:03/3/22 VERSION:v2.7 CLICK INSTALLATION GUIDE ;Oa EcoFasten For Installers. By Installers. SYSTEM COMPONENTS REQUIRED 11‘. -„,,,..___ __ . 1 CLICKFIT RAIL RAIL SPLICE TILE HOOK L-FOOT END CAP MID CLAMP dit END CLAMP SYSTEM COMPONENTS ACCESSORIES FRAME MLPE MODULE JUMPER MLPE MOUNT MOUNT PAGE Refer to ClickFit Alternate Component Addendum for components not shown 0 5 REVISION DATE:03/3/22 VERSION:v2.7 CLICK INSTALLATION GUIDE oOa EcoFastena v For Installers. By Installers. RATINGS Fire Rating* Class A System Fire Rating Max System Voltage 1500 VDC Max Fuse Rating 40A Certification Conforms to UL STD 2703 Warranty 25 Year Material and Workmanship UL 2703 Markings Product listing label is located on the rail end-caps Roof Pitch 2:12-12:12 UL 2703 Allowable Design Load Rating 10 psf downward,5 psf upward,and 5 psf lateral Max Module Size 25.6 sqft Module Orientation Portrait or Landscape Multiple use Rated Components(Position Independent) Mid Clamp,Frame MLPE Mount and MLPE Mount *Class A System fire rating with Type 1 &2 PV modules.Any module-to-roof gap is permitted,with no skirt required.This rating is applicable with any roof attachment. UL 2703 MARKING EXAMPLE: v EcoFasten ESDEC • (III us CLICKFIT SYSTEM Intertekti ti�rC io�o�e:sss �c� v XXXXXXX TORQUE SPECIFICATIONS Component Torque(in-lb) Notes Fully Seat.Use visual indicator of the black EPDM ring around the Lag Screw N/A bonded washer for torquing. Mid-Clamp 144 End-Clamp 96 Rail Clicker Leveling Bolt 142 Pre-torqued upon delivery.Applies to Tile Hook and L-Foot/Clicker Hook Height Bolt N/A Lightly clamp hook to flush with top of next tile row Ground Lug N/A Refer to specific ground lug manufacturer's installation manual MLPE Clip 144 MLPE Mount 144 PAGE 06 REVISION DATE:03/3/22 VERSION:v2.7 CLICK INSTALLATION GUIDE t1EcoFasten For Installers. By Installers. • Refer to span tables, local jurisdiction, or engineer of record specifications when determining setbacks from roof edges, attachment spans, etc. • Mark the perimeter and corners of the array on the roof surface. *Add 3/4" to account for the gap between modules in each direction* • Draw or snap chalk lines where the rails will be installed,(refer to module manufacturer specs to determine allowable mounting locations). • Locate rafters within the area of the array. It may be necessary to shift the array East or West on the roof in order to fall within the rail cantilever specs (1/ 3 of span). • Stagger rafters every row if required by the local jurisdiction, engineer of record, or company policy. PAGE 07 REVISION DATE:03/3/22 VERSION:v2.7 CLICK INSTALLATION GUIDE tZEcoFasten v For Installers. By Installers. Ae ° I ry PRE-INSTALLING RAIL SPLICES 1. Determine the number of rails required per row of modules. 2. Insert a rail splice into one rail. Do not push it past the center bump. 3. Slide the next rail onto the rail splice until the two rail ends meet. 4. Repeat steps 2 and 3 until the desired length is achieved. This is usually easiest to do from the ground. PAGE 08 REVISION DATE:03/3/22 VERSION:v2.7 CLICK INSTALLATION GUIDE DEcoFasten a For Installers. By Installers. INSTALLATION OF FLASHING & L-FO OT • ClickFit for comp shingle roofs uses EcoFasten GF-1 watertight flashing system. • Other roof types may use different EcoFasten Solar attachments, visit ecofastensolar.com to learn about other applications. 0 'Note the orientation of the L foot and Clicker.The two Clicker"arms"should be facing downslope` INSTALLATION STEPS: 2 1. Locate rafter lines. 2. Drill 1/4" pilot holes at all attachment points and back fill using roof- compatible sealant. 3. Separate shingles where flashing is to be installed. Insert the flashing so the top portion is under the next row of shingles North. Ensure the flashing is pushed to the third-course of shingle to prevent water infiltration through the vertical joints between shingles. 4. Align GF-1 flashing hole with pilot hole. Insert the lag bolt with pre-installed bonded washer through the L foot and EPDM grommet. Tighten the lag bolt until fully seated. The EPDM Ring visual indicator is the most effective way to ensure a watertight seal. PAG E 09 REVISION DATE:03/3/22 VERSION:v2.7 INSTALLATION GUIDE Q:tC0rastena For Installers. By Installers. INSTALLING TILE HOOKS 1. Locate rafters on the roof, mark the tiles to be removed. Hint: In some cases rafter tails are visible at the eaves of the roof, making it easy to find the rough location of the rafters. In other cases, the fascia board may have nail heads visible where it was attached to the rafters. In the worst-case a row of tiles may need to be moved to determine the rafter locations. 2. Slide the tile at the desired location upward to expose the roof sub surface. If the tile is to be notched, or if using a replacement flashing, remove it entirely. Clean the sub surface with a brush to remove any debris that could affect the sealing. 3. Locate the rafter center and mark it. 4. Place the tile hook with the hook itself in the valley of the next tile below. Drill one 1/4" pilot hole in the rafter center,taking care to keep the hook in the valley of the tile below. Backfill this hole with a roof-compatible sealant. For flat tiles, try to avoid having the hook land directly under a joint between tiles,this will create a larger gap or more notching than necessary. 5. Install one 5/16"x 4"lag screw on the row of holes closest to the tile hook arm. If possible, install the screw in one of the three holes directly next to the arm. If the lag screw must be installed in one of the seven holes furthest from the arm(denoted by the red rectangle below), install three deck screws in the pattern shown by the green circles below. 6. Adjust the height of the tile hook as necessary using the bolt shown in the fourth image. 7. Flash the surrounding area and lag screw head with roof-compatible sealant as necessary. Refer to Tile Hook Subflashing Installation guide on the next page. 8. Replace the tile that was moved and/or removed, or install the tile replacement flashin . If it is to be notched, mark the tile for notching. Notching can be done with a grindin g wheel or by using a chisel. g , .. .. tip, r„,\ \ ......„.„, 6. WI. \\ \\ tX• PAGE 10 REVISION DATE:03/3/22 VERSION:v2.7 CLICK INSTALLATION GUIDE ;O0a EcoFastena For Installers. By Installers. TILE HOOK SUB-FLASHING INSTALLAT ION TOOLS REQUIRED: Caulking gun, roofing mastic applicator MATERIALS REQUIRED: Roofing mastic, reinforcing fabric, roof sealant t411////, ., , Apply a continuous line of t'ie manufartt]its approved elani �r he otitis the suu i1ashint ewer the rile hood;base. ma underside of the ClickFit the hoc ul_ `I be nee If, to rr ove adjacent t les to ear I�lo Ituver they o form a U-shape around the area��+yes. sub lashing onto the too(deck. Place tc� ub- tshin;Duel the ba rt(the H. f g tut rer oihmenti followin;the TRI :t idelines huol.so ��rec �.ic sE ilnty nu thod.Start the t!i c e-u>ui se the flashing coves the unlit' 4 u alin;method by appl in t3:.,fiver of )(flu)1 s;ma;t!� over the edges of the the hook sub-fl�tslting. t11'x A Place snips of reinforcing fabric osier nt ,1 to cover approximately_ f rom t r l edge t the APItIY a final layer of mastic to completely cover sub flashing n both do ertiors UI e sU itt on the reinforcin.;fabric The flashing is now in, PAGE the side first than The top t el��e. and�cnlcd. 11 REVISION DATE:03/3/22 VERSION:v27 CLICK INSTALLATION GUIDE D. EcOFastenA: v For Installers. By Installers. CLICKFIT INSTALLATION USING SIMPLEBLOCK-U® PRE-INSTALLATION: The SimpleBlock-U can be installed on many different standing seam profiles. See SimpleBlock-U Installation Manual for compatible and non-compatible standing seam profiles. Be sure that each standing seam is no thicker than/in width. INSTALLATION: OPosition the SimpleBlock assembly on the panel O seam. Make sure the block is fully seated on the metal seam. OTorque the 2 preinstalled oval point set screws to 150in-Ibs using the included 3/16"hex drive. to / O Included with the block, slide the hex holt into the channel on top of the SimpleBlock-U assembly. rr..- Place the ClickFit Universal L-Foot over the hex bolt O 4 followed by the serrated flange nut and torque to t 150in-Ibs. folfng Profiles Snapping Profiles _ a t?l"MAX ff a +.. 1 "MAX { MAX PAGE 12 REVISION DATE:03/3/22 VERSION:v2.7 INSTALLATION GUIDE a - oo EcoFaste�R For Installers. By Installers. INSTALLING THE RAIL 1. Place the rail in the Clickers. If 2. Ensure the rails extend a minimum li O II 0 of 2" past the last attachments in each row. ( 0 III( �i " 3. Push the rail into nto each L-foot; an audible click should be heard when the rail is fully seated. Verify the rail is sitting flush with both ledges. If attachments are I extremely misaligned it may be r necessary to loosen the leveling Q-- bolt and adjust the height of the -.- ' L-foot. Tighten the clamping bolt to 144 in-lbs. I -- 4. Level the rail if necessary by y loosening the bolt attaching the Clicker to the L-foot or tile hook. (zit.- )r\) ill I rfli I NI , ' ,i' i sl—i Gf PAGE 13 REVISION DATE:03/3/22 VERSION:v27 • EMI. INSTALLATION GUISE a°D oQ EcoFastenw For Installers. By Installers. MODULE INSTALLATION O INSTALL THE END CLAMPS ON EACH WHATEVER END YOU ARE STARTING RAIL ON WITH 0 Snap the end damp onto the rail. 16 Slide the end cap onto the rail. 0 Turn the leg of the end clamp around the cap. 0 —`43-, .. '1:: 7. e ,,..... ,,, ___ __;),:-.1-,,,,_:" ® , �� 0 PLACE MODULE `r+ ; — / \� Place the module on the rail, ensuring g . l�� `-, the module junction box `'j�f J is up slope.* 0 0 ALIGN AND TIGHTEN \ Slide the module to the end clamp and align it with the array corners. Tighten '4,-+ the end clamp to 96 in-lb . e---- .., o ```,,, PAGE 14 REVISION DATE 8303/22 VERSION:v2.7 . 13MM INSTALLATION GUILE a D 0o Ec o Fa ste nq For Ins--hers. By Installers. INSTALLING ADDITIONAL MODULES Q CLICK IT ON Cli; :;c:P k a onto each rail. 4f . i41~t ` Q Slide the mid clamps until they are 4111 / Aliall.. ..................... --_____ of the existing flush with the side module. f 0 PLACE AND TIGHTEN Place and slide the next module firmly 4' against the mid clamps. t�- Align the itAt bottom edges of the modules. Tighten t �' -` mid clamps to 144 in-lb. /0/./ ..,..,............„....41111 ---------__------------------_----------. PAGE 15 REVISION DATE: VERSION:v2.7 CLICK INSTALLATION GUIDE a�DE ooa coFastenk For Ins:, lets. By Installers. INSTALLING END CLAMPS AT THE END OF A ROW 1. Install the last mid clamps in the row. 2. Measure the rails from the last mid clamp to the module width plus 1". 3. Cut the rails at this mark. There is some adjustment in the end cap/clamp so it does not need to be a perfect cut. 4. Install end clamps and end caps, tighten to 96 in-lb ALTERNATIVE METHOD: 1. Install the last module in the row, tighten the mid clamps. 2. Using a circular saw with a metal blade, or carefully with a reciprocating saw, cut the rail approximately 1"past the edge of the last module. 3. Install end clamps and end caps, tighten to 96 in-lb Replace the tile that was moved and/or removed, or install the tile replacement flashing. If it is to be notched, mark the tile for notching. Notching can be done with a grinding wheel or by using a chisel. N PAGE 16 REVISION DATE:03/3/22 VERSION:v2.7 . 133:3311P INSTALLATION GLE O° ooa EcoFasten For Installers. By Installers. - BONDING AND GROUNDING BONDING PATHS Bonding paths are carried throughout the array ' in a variety of ways. They are carried module- to-module and module-to-rail through the bondinmid clamps, carried at rail-to-rail connections through g jumpers, and carried row-to-row using bonding jumpers either module-to -module on the module frame or rail-to-rail on the ends of the rails. MID CLAMP 2 mid clamps bonding pairs of modules GROUNDING LUG 1 ground lug per continuous array .1Z„,, A .ice i r` Syr MODULE JUMPER RAIL SPLICE 1 module jumper bondine 1 splice bonding module and owuto row adjacent pair of rails PAGE 17 REVISION' S VERSION.v2.7 INSTALLATION GUIDE a oo EcOFastenR Fo; -alleys. By Installers. GROUNDING 1 2 e 4 • • NECESSARY COMPONENTS One of the following grounding lugs(or any UL 2101 Compliant• ground Lug'• BurndyCL50-1TN Ground Lu UL �- 61� g(� 2/03- E3514343/UL 467-E9999) • ILSCO SGB-4 Ground Lug(UL 2703- E354420/UL 467- E34440) • ILSCO GBL-4DBT(UL 2703 - E354420/UL467-E34440) • ILSCO GBL-4DBTH (UL 2703 - E354420/UL 467- E34440) • ILSCO GBL-4SS(UL 2703- E354420/UL 467- E34440) *Equipment grounding wire should be sized in accordance with the National and a minimum of 1/4"clearance is required between bare copper wires'and Electrical Code,N components. aluminum components. PAGE 18 REVISION DATE O3/3/22 VERSION:V2.7 1113E01111 INSTALLATION GUIDE ' ECOFasten For Installers. By Installers. MLPE MOUNT INTALLATION dais, II Tilt and hook the mourn around Lower the MLPE Mount to the rail the top"dog ear"of the rail 11NMI Mail __...,_____:__z._____.______7_____ al 11111111111111 Set the MLPE Mount flush with the top of the rail Slide the microinverter flange between the MLPE Mount and the serrated bolt flange ■al 116 All Repeat this process for all other microinverter Tighten the bolt to 144 in-fbs and/or optimizer installations PAGE 19 REVISION DATE:03/3/22 VERSION:v2.7 INSTALLATION GUIDE QQtCOraSLefl D a For Installers. By Installers. WIRE CLIP INSTALLATION 1. With the ClickFit Rail in place and the Wire Clip in hand, place the wire 2. end on either side of the rail. With the wire end touching the bottom lip of the rail, roll and click- in the Wire Clip to the opposite end of the rail. 3. You will hear an audible click when the Wire Clip is set in place. PAGE 20 REVISION DATE:03/3/22 VERSION:v2.7 CLICK INSTALLATION GUIDE ;Oa EcoFasten, For Installers. By Installers. FRAME MLPE MOUNT { • , INSTALLING THE FRAME MLPE MOUNT ACCESSORY: • Install the Frame MLPE Mount • Slide the Frame MLPE Mount onto the lip of the micro-inverter/power optimizer. • Slide the micro-inverter/power optimizer into the opposite lip of the module frame. • Tighten the bolt to 144 in-lb to clamp the Frame MLPE Mount to the module frame and the micro-inverter/power optimizer to the Frame MLPE Mount. • Ensure that the lip on the clip is tight against the frame and that the micro-inverter/power optimizer flange is tight against the clip flange to avoid rotation during tightening. FRAME MLPE MOUNT AND MLPE MOUNT ARE COMPATIBLE WITH: • ENPHASE: M250-72, 250-60, M215-60, C250-72, S230, S280, IQ 6, IQ 6+, IQ7, IQ 7A, IQ 7+, IQ7 PD, IQ 7X, Q Aggregator; IQ8-60, IQ8PLUS-72, IQ8A-72, IQ8H-208-72, IQ8H-240-72, IQ8M-72, may be followed by-2-US • SOLAREDGE: M1600, P300, P320, P340, P370, P400, P401, P405, P485, P505, P600, P700, P730, P800p, P800s, P801, P850, P860, P950, P960, P1100, P1101, S440,S500 • SEE PAGE 26 FOR COMPATIBLE MODULE LIST PAGE 21 REVISION DATE:03/3/22 VERSION:v2.7 CLICK INSTALLATION GUIDE ;Oa EcoFastella v For Installers. By Installers. MODULE MAINTENANCE AND SERVICING During servicing or maintenance, module removal may disrupt the bonding path and could introduce the risk of electric shock. If module removal is required for servicing,then a Module jumper shall be installed to the adjacent modules to maintain the bond path. Modules should only be removed by qualified persons in compliance with the instructions in this manual. 64.411.4 — Bond Path Grounding Lug Equipment Grounding Conductor(EGC) generally to earth ground Brackets/Mid-Clamps Module Jumper PAGE 22 REVISION DATE:03/3/22 VERSION:v2.7 CLICK INSTALLATION GUIDE 3 0 EcoFastena For Installers. By Installers. JUNCTION BOX INSTALLATION 111111,1 JUNCTION BOX PREP Prior to installation, use step drill bit to place pass through holes for conduits or water-tight connectors. Drill bit starter locations are provided on the sides and front of enclosure. Do not install conduit facing up roof. ♦ V RAIL INSTALLATION Use rail-specific MLPE mounting hardware to attach Rail Hangers to rail. Ensure junction box is pushed as close to the rail as possible.Torque to 80-in Ibs(1/2"or 7/16" socket), do not overtighten. *If installing in areas with ground snow loads greater than 40 psf,install junction Box under module directly next to module frame edge. PAGE 23 REVISION DATE:03/3/22 VERSION.v27 Ezzamp INSTALLATION GUIDE a°D 0o EcoFastenF For Installers. By Installers. JUNCTION BOX INSTALLATION DECK SCREWS WITH SEALING WASHERS(2x) DECK MOUNTED INSTALLATION Align sealing oval of box to align with mating feature on flashing.An EPDM pre-installed to the underside of the junction box to seal the flashing to the box the need for additional sealant. Secure with suppliedfoam gasket is junction box is ion tight to the flashing. #12 x 1- without deck screws(2x) until the screws in OSB. Do not over tighten screws to avoid stripping *If installing pass through fittings,ensure that the Junction Box and roof deck are both prepared.Complete installation process before attaching the Junction box to the deck. properly FINALIZING INSTALLATION Install wiring, conduit and fittings per NEC requirements an Using Philips Head Driver tighten the bolt. d following local AH guidance. For additional details refer to the full Junction Box Installatio n Manual. PAGE 24 REVISION DATE:03/3/22 VERSION:v2.7 Mall, INSTAL!ATIDN GUIDE a�D EcoFasten R For Installers. By Installers. SKIRT INSTALLATION (OPTIONAL) The skirt is designed to give the rows of the array facing the eave of the roof a uniform appearance.The installation consists of three basic components listed below. IN SKIRT&END CAP r SKIRT CLAMP 1. Once the first row of modules is installed(or after the array is complete length and number of skirts for the array. ), locate the correct 2. Locate the correct amount of skirt clamps for the array. 80"skirts are pref when applicable. The general rule when using 80"skirts is the number of modules plus one for the end of the array. When using 65"skirts, the rule changes to 2 skirt clamps per module. general rule is number of modules plus one for the end of the array. If you have ten modules you will need eleven skirt clamps. In the case of heavy snow loads or other ircu The EcoFasten Solar for additional instructions. mstances call 3. Working with a helper, align the end of the skirt with one edge of the array, drop clamp onto the module and skirt, ensureY, the first skirt other. Skirt clamps must be installed within110 inches from the aces are lend el and fullyengaged n with each the Skirt. Ensure the clamp is engaging either the top of the skirt or the step depending on the moduleTighten size. bolt to 12 ft-lb. 4. There should be enough play in the assembly to drop the next skirt clamp onto the next module at roughly the same location relative to the clamp on the last module. Ensure all faces are parallel and fully engaged with each other. Slide next skirt over the coupling of the first skirt. Tighten bolt to 12 ft-lb. skirt end cap or 5. Repeat steps 3 and 4 until the end of the array is reached. Install a skirt clampwithin 10 inches from the end of the array. Cut the skirt flush with the end of the array as necessary.An additional skirt clamp may be necessary to hold a short piece of skirt at the ed of t 6. Once the last skirt is cut and clamped in place, install an end capin theh array. end of the ensure the end cap stays in place through various weather conditions, t is acceptable to install a small amount of roof sealant onto the edge of the end caplast skirt. To i of the skirt. Replace the tile that was moved and/or removedtor install the tileontactrrepinside face lacement flashing. If it is to be notched, mark the tile for notching. Notching can be done with a grinding wheel or by using a chisel. PAGE 25 REVISION DATE:03/3/22 VERSION:v2.7 CLICK 46, INSTALLATION GUIDE rEcoFostena v For Installers. By Installers. Install first skirt clamp within 10 inches from the end of the array with 80"skirts,the second mp c fimp butcla installedlo ation onwill thebe second similar module.tothe Continuerstcla to the end of the array. ,. Install last skirt clamp within 10 inches from the end of the array prior to cutting. Install end cap on the last module.Adding a small amount of sealant is optional. y THINGS TO CONSIDER PRIOR TO INSTALLING THE SKIRT ARE: • Potential snow drifting in the area the skirt is to be installed. If the snow load is greater than 20psf in your region two skirt clamps are required per module and skirt coupler must be used. Contact EcoFasten for information on the skirt coupler. • There are three options for skirts:A, B and C.The A& B skirts can be identified by looking at the inner channel, if it's ribbed then it is a B skirt and will use 32mm (inner channel) and 38mm utilizing the top of the skirt.A skirts will have a smooth inner channel and use 35mm (inner channel)and 40mm utilizing the top of the skirt. C skirts will only use 30mm PAGE skirts and do NOT have an inner channel. 26 REVISION DATE 03/3/22 VERSION:v2.7 CLICK INSTALLATION GUIDE ;Oa EcoFastena For Installers. By Installers. UL 2703 CERTIFIED MODULES This racking system may be used to ground and/or mount a PV module complying with UL 1703 or UL 61730 only when the specific module has been evaluated for grounding and/or mounting in compliance with the included instructions. Unless otherwise noted, "xxx" refers to the module power rating and both black and silver frames are included in the certification. "" MANUFACTURER LIST OF UL 2703 APPROVED MODULES Adani modules with 35 and 40mm frames Adana ASX-Y-ZZ-xxx: Where-"X"call be B; Vl or P,"Y"can be fe or 7,and-"ZZ"can--bebbtank,-PERC, B-PERC,or AB-PERG �. Aionrise modules with 35 and 40mm frames Aionrise AIONyyG1-xxx Where"yy"can be 60 or 72 Amerisolar modules with 35,40 and 50 mm frames AmerisolarAS-bYxxxZ Where"b"can be 5 or 6;"Y"can be M, P, M27, P27, M30,or P30;and""Z'"' can be blank,W or WB Aptos modules with 35 and 40 mm frames Aptos Solar DNA-yy-zzaa-xxx Where"yy"can be 120 or 144;"zz"can be MF or BF;and"aa"can be 23 or 26 Astronergy modules with 30,35,40,and 45 mm frames • aaSMbbyy£7zz-xxx Astronergy Solar Where"aa"can be CH or A; bb can be 60,66,or 72; "yy"-can be blank, 10 or 12;"C"can M, P, M(BL),M-HC, M(BL)-HC,P-HC,M(DG),or M(DGT);and "zz"can be blank, HV,F-B,or F-BH ASUN modules with 35 and 40 mm frames ASUN ASUN-xxx-YYZZ-aa Where"Yr can be 60 or 72;"ZZ"can be M,or MHS;and"aa"can be blank or BB Auxin modules with 40 mm frames Auxin AXN6y6zAxxxB --Where"y"can be-M or-P;"z"can be 08,09, 10,11,or 12;and--A can-be-F,-M or T;and"B"can be blank,A,B or C PAGE 27 REVISION DATE:03/3/22 VERSION:v2.7 CLICK INSTALLATION GUIDE ;Oa EcoFastenR For Installers. By Installers. MANUFACTURER LIST OF UL 2703 APPROVED MODULES Axitec Modules with 30,35 and 40 mm frames Axitec AC-xxxY/aaZZb Where"Y"can be M, P or MH;"aa"can be blank, 125-or 156-;"ZZ"can be 54,60,72, 108, 120,or 144;"b"can be 5,X,V,VB,XV,or MX Boviet modules with 35 and 40mm frames Boviet BVM66aaYY-xxxBcc Where"aa"can be 9,10 or 12;'NY"is M,or P;and"B"can be blank,L or S;' and"cc"can be blank,H,H-BF, H-HC, HC-BF or H-HC-BF BYD modules with 35 mm frames BYD BYDxxxAY-ZZ Where"A"can be M6, P6, MH or PH; "Y"can be C or K;and"ZZ"can be 30 or 36 'Canadian Solarmoduleswith 30;35 and 40 mm frames . .... Canadian Solar CSbY-xxxZ Where"b"can bet,3or6;"Y"can beH, K,L, N, P,U,V,W,XorY;and"Z" can be M,P,MS, PX, M-SD,P-AG,P-SD, MB-AG, PB-AG,MS-AG,or MS-SD CertainTeed modules with 35 and 40mm frames CertainTeed CTxxxYZZ-AA Where"Y"can be M, P,or HC;"ZZ"can be 00, 01, 10, or 11;and"AA"can be 01,02, 03, 04 or 06 Csun modules with 35 and 40 mrn frames CSUN YYxxx-zzAbb Where"YY"is CSUN or SST;"zz"is blank,60,or 72;and"A"is blank,P or M or MM;"bb"is blank,BB,5BB, BW,or ROOF Dehui modules with 35 and 40mm frames Dehui DH-MYYYZ-xxx Where"YYY"can be 760,772,860,872;and"Z"can be B or W Ecosolargy modules with 35,40,and 50 rnm frames Ecosolargy ECOxxxYzzA-bbD Where'IV"can be A, H,S,or T;"zz"can be 125 or 156;"A"can beMorP "bb" can be 60 or 72;and"D"can be blank or B ET Solar modules with 35,40,and 50 mm frames ET-YZZZxxxAA ET Solar Where"Y"can be P, L,or M;"ZZZ"can be 660, 660BH,672, 672BH,754BH or 766BH;and"M"can be TB,TW,WB,WW, BB,WBG,WWG,WBAC,WBCO, WWCO,WWBCO or BBAC PAGE 28 REVISION DATE:03/3/22 VERSION:v2.7 CLICK INSTALLATION GUIDE oOa EcoFasten, For Installers. By Installers. MANUFACTURER LIST OF UL 2703 APPROVED MODULES Flex modules with 35,40,and 50 mm frames Fier FXS-xxxYY-ZZ Where"YY"can be BB or BC;and"ZZ"can be MAA1 B,MAA1 W,MAB1W, SAA1B,SAA1W,SAC1B,SAC1 W,SAD1W,SBA1B,SBA1 W,SBC1B,or SBC1 W GCL modules with 35 mm and 40 mm frames GCL GCL-ab/YY xxx Where"a"can be M or P;"b"can be 3 or 6;and"YY"can be 60,72,72H,or 72DH Gigawatt modules with 40 mm frames GigaWatt Solar GWxxxYY Where''YY"can be either PB or MB Hansol modules with 35 and 40 frames Hansol HSxxxYY-zz Where"YY"can be PB, PD, PE,TB,TD, UB, UD,or UE;and"zz"can be AH2, AN1,AN3,AN4, HH2, HV1, orJH2 Hanwha Solar modules with 40,45,and 50 mm frames Hanwha Solar HSLaaP6-YY-1-xxxz Where"aa"can be either 60 or 72;"YY"can be PA or PB and"Z"can be blank or B Hanwha Q CELLS Modules with 32,35,40,and 42mm frames aaYY-ZZ-xxx where"aa"can be Q. or B.;"YY"can be PLUS, PRO, PEAK, LINE PRO, LINE PLUS, PLUS DUO or PEAK DUO;and"ZZ"can be G3, G3.1,G4, G4.1, L-G2, L-G2.3, L-G3, L-G3.1, L-G3y, L-G4, L-G4.2, L-G4y, LG4.2/TAA, BFR-G3, BLK-G3, BFR-G3.1, BLK-G3.1, BFR-G4, BFR-G4.1, BFR G4.3, BLK-G4.1, G4/SC,G4.1/ SC, G4.1/TAA, G4.1/MAX, BFR G4.1/TAA, BFR G4.1/MAX, BLK G4.1/TAA, BLK Hanwha Q CELLS G4.1/SC, EC-G4.4, G5, G5/SC,G5/TS, BLK-G5, BLK-G5/SC, BLK-G5/TS, L-G5, L-G5.1, L-G5.2, L-G5.2/H, L-G5.3, G6, G6/SC, G6/TS,G6+, BLK-G6, L-G6, L-G6.1, L-G6.2, L-G6.3, G7, BLK-G6+, BLK-G6+/AC, BLK-G6+/HL, BLK-G6+/SC, BLK-G6/TS,G6+/TS, BLK-G6+/TS, BLK-G7, G7.2, G8, BLK-G8,G8+, BLK-G8+ L-G7, L-G7.1, L-G7.2, L-G7.3, L-G8, L-G8.1, L-G8.2, L-G8.3, L-G8.3/BFF, ML-G9, BLK ML-G9, ML-G9+, BLK ML-G9+, BLK-G10+, BLK-G10+/AC, ML-G10, BLK ML-G10, ML-G10+, BLK ML-G10+, ML-G10.a, BLK ML-G10.a, ML-G10.a+, BLK ML-G10.a+,XL-G9,XL-G9.2,XL-G9.3,XL-G10.2,XL-G103,XL-G10.c or XL- G10.d PAGE 29 REVISION DATE:03/3/22 VERSION:v2.7 CLICK INSTALLATION GUIDE <AD ooa EcoFastena For Installers. By Installers. MANUFACTURER LIST OF UL 2703 APPROVED MODULES Hellene modules with 40 mm frames Hellene YYZZxxxA Where"YY"can be 36,60,72,96, 120 or 144;"ZZ"can be HC, M,P,or MBLK; and"A"can be blank, HomePV,or Bifacial HT-SAAE modules with 35.and 40 mm frames HT-SAAE HTyy-aaaZ-xxx Where"yy"can be 60,66 or 72;"aaa"can be 18, 156 or 166;"Z"can be M, P, M-C, P-C, M(S), M(VS), M(V), P(V), M(V)-C, P(V)-C,or X Hyundai modules with 33,35,40 and 50 mm frames HyundaiHiY-SxxxZZ' Where"Y"can be A,D or S;"S"can be M or S;and"ZZ"can be HG, HI,KI, MI, MF,MG,PI, RI,RG,RG(BF),RG(BK),SG,Ti or TG Itek Modules with 40 and 50 mm frames Itek IT-xxx-YY Where"YY"can be blank, HE,or SE,or SE72 JA Solar modules with 30,35,40 and 45 mm frames JAyyzz-b bww=xxxfaa Where"yy"can be M,P, M6 or P6;"zz"can be blank,(K),(L),(R),(V),(BK),(FA), JA Solar (TG),(FA)(R),(I-)(BK),(I-)(TG),(R)(BK),(R)(TG),(V)(BK),(BK)(TG),or(L)(BK)(TG) "bb"can be 48,54,60,66, w 72 or 78;" w"can be D09,SO1,SO2,S03,S06, S09,S10,S12,S17,S20,S30 or 531;and"aa"can be BP, MR,SI,.SC, PR,3BB, 4BB,4BB/RE,5BB Jinko modules with 35 and 40 mm frames JKMYxxxZZ-aa Where"Y"can either be blank or S;"ZZ"can be M, P,or PP;and"aa"can be Jinko blank,60, 6013, 60H,60L,60BL,6OHL,60HB,60HBL,6HBL-EP,60-J4, 60B J4, 60B-EP, 60(Plus),60-V,60-MX,6RL3,6RL3-B, 6TL3-B,7RL3-V, 7RL3-TV, 72, 72B, 72-J4, 72B-J4, 72(Plus), 72-V, 72H-V,72L-V, 72HL-V,72-MX,72H-BDVP, 72HL-TV,or 72HL-V-MX3 Kyocera Modules with 46mm frames KYxxxZZ-AA Kyocera Where"Y"can be D or U;"ZZ"can be blank,GX,or SX;and"AA"can be LPU, LFU, UPU,LPS,LPB,LFB,LFBS, LFB2,LPB2,3AC,3BC,3FC,4AC,4BC,4FC, 4UC, SAC,SBC,SFC,5UC,6BC,6FC,8BC,6MCA,or 6MPA LG modules with 35,40,and 46 mm frames LG LGxxxYaZ-bb Where"Y"can be A,E, M, N,Q,S;"a"can be A, 1,2 or 3;'2"can be C,K,T,or W; PAGE and"bb"can be A3,A5,A6,B3,B6,E6, E6.AW5,G3,G4,J5,K4,L5, N5,V5,V6 30 REVISION DATE:03/3/22 VERSION:v2.7 CLICK INSTALLATION GUIDE I3EcoFasten For Installers. By Installers. MANUFACTURER LIST OF UL 2703 APPROVED MODULES Longi modules with 30,35 and 40 mrn frames Longi LRa-YYZZ-xxxM Where"a"can be 4 or 6;"YY"can be blank,60,66 or 72;and"ZZ"can be blank,BK,BP,HV, PB,PE,PH, HBD,HIB, HIH, HPB, HPH,or HIBD Mission Solar modules with 33,35 and 40 mm frames YYYbb-xxxZZaa Mission Solar Where"YYY"can be MSE or TXS;"bb"can be blank,6 or 60A;"ZZ"can be blank, MM,SE,SO,SQ,SR,SX,TS, 120 or 144;and"aa"can be blank, BB, BW, 1J,4J,45,5K, 5R, 5T,60,6J, 6S, 6W,6Z,8K,8T, or 9S Mitsubishi modules with 46 mm frames Mi#subishi PV MYYxxxZZ Where"YY"can be LE or JE;and"ZZ"can be either HD,HD2,or FB Motech IM and XS series modules with 40,45,and 50 mm frames Next Energy Alliance modules with 35 and 40mm frames Next Energy Alliance yyNEA-xxxZZ where'yy"can be blank or US;"ZZ"can be M, NIB or M=60 Neo Solar Power modules with 35 mm frames Neo Solar Power D6YxxxZZaa Where"Y"can be M or P;"ZZ"can be B3A, B4A, E3A, E4A, H3A, H4A;and"aa" can be blank,(TF), ME or ME(TF) Panasonic modules with 35 and 40 mm frames Panasonic(HIT) VBHNxxxYYzzA Where"YY"can be either KA,RA,SA or ZA;"zz"can be either 01,02,03,04, 06,06B, 11, 11 B, 15, 158, "A" 16, 16B, 17,or 18;and can be blank E,G or N Panasonic Panasonic modules with 30 mm frames (EverVolt) EVPVxxxA Where"A"can be blank or H, K or PK Peimar modules with 40 mm frames Peimar Sbxxxyzz Where"b"can be G, M or P;"Y"can be M or P;and"zz"can be blank,(BF),or (FB) Philadelphia modules with 35 and 40 mm frames Philadelphia Solar PS-YzzAA-xxx Where"Y"can be M or P;"zz"can be 60, 72 or 144;and"AA"can be blank, (BF),(HC)or(HCBF) PAGE 31 REVISION DATE:03/3/22 VERSION:v2.7 CLICK INSTALLATION GUIDE QEcoFasten , For Installers. By Installers. MANUFACTURER LIST OF UL 2703 APPROVED MODULES Phono Solar modules with 35,40,and 45 mm frames Phono Solar PSxxxY-ZZ/A Where"Y"can be M, M1,MH,M1H, M4,M4H,or P; "ZZ"can be 20 or 24; and"A"can be F,T,U. UH,or TH Recom modules with 35 and 40 mm frames Recom RCM-xxx-6yy Where"yy"can be MA, MB, ME or MF REC modules with 30,38 and 45 mm frames REC Solar RECxxxYYZZ Where"YY"can be AA, M, NP, NP2,PE, PE72,TP,TP2,TP2M,TP2SM,TP2S, TP3M or TP4;and"ZZ"can be blank,Black,BLK, BLK2,SLV,72 or Pure ReneSola modules with 35,40 and 50 mm frames AAxxxY-ZZ ReneSola Where"AA"can be SPM(SLP)or JC;"Y"can be blank, F, M or 5;and"ZZ" can be blank,Ab,Ab-b,Abh,Abh-b,Abv,Abv-b, Bb, Bb-b, Bbh, Bbh-b, Bbv, Bbv-b, Db, Db-b,or 24/Bb Renogy Modules with 40 and 50 rnm frames Renogy RNG-xxxY Where"xxx"is the module power rating;and"Y"can be D or P Risen Modules with 35 and 40 mm frames Risen RSMyy-6-xxxZZ Where"yy"can be 60, 72, 120, 132 or 144;and"ZZ"can be M or P S-Energy modules with 35 and 40mrn frames SABB-CCYYY-xxxZ S-Energy Where"A"Can be C, L or N;"BB"can be blank,20,40 or 45;"CC"can be blank,60 or 72;"YVY"can be blank, MAE,MAI, MBE,MBI, MCE or MCI;and "Z"can be V,M-10,P-10 or P-15 SEG Solar modules with 35 and 40 mm frames SEG-aYY-xxx-ZZ SEG Solar Where"a"can be blank, 6 or B;"YY"can be blank, MA, MB, PA,or PB;and "ZZ"can be blank, BB, BG, BW, HV,WB,WW, BMB, BMA-HV, BMA-TB, BMB- HV, BMB-TB, BMD-HV Seraphim modules with 35,40 and 50 mm frames Seraphim USA sRP-xxx-YYY-ZZ Where"xxx"is the module power rating;and"YYY"can be 6MA,6MB,6PA, _ .__6PB,BMD,6QA=XX XX,and 6QB-XX XX;ZZis blank,-BB or HV PAGE 32 REVISION DATE:03/3/22 VERSION:v2.7 CLICK INSTALLATION GUIDE tEcoFastenA For Installers. By Installers. MANUFACTURER LIST OF UL 2703 APPROVED MODULES Sharp modules with 35 and 40 mm frames Sharp NUYYxxx Where"YY"can be SA or SC Silfab Modules with 35 and 38 mm frames Silfab SYY-Z-xxxAb Where"YY"can be IL,SA,LA,SG or LG;"Z"can be blank, M, P,or X;"A"can be blank, B, H, M, N;and"b"can be A,C,G, K, L, N,T, U or X Solaria modules with 35 and 40 mm frames Solaria PowerXT-xxxY-ZZ Where"Y"can be R or C;and"ZZ"can be AC, BD, BX, BY, PD, PL, PM, PM-AC, PX, PZ,WX or WZ SOlarcity Solarcity modules with 40 mm frames (Testa) SCxxxYy _ ,.� Where"YY"can be blank, B1 or B2 SolarTech modules with 40 and 42 mm frames SolarTech AAA-xxxYY Where"AAA"can be PERCB-B, PERCB-W, HJTB-B, HJTB-W or STU;"YY"can be blank, PERC or HJT SolarWorld Sunrnodule Plus, Protect, Bisun,XL, Bisun XL may be followed SolarWorld AG by mono,poly,duo, black,bk,or clear;modules with 31,33 or 46 mm frames SW-xxx SolarWorld SolarWorld Sunmodule Plus, Protect, Bisun,XL, Bisun XL, may be followed Americas by mono, poly, duo, black, bk, or clear; modules with 33 mm frames SWA-xxx Sonali Modules with 40 mm frames Sonali Ssxxx Stion Stion Thin film modules with 35 mm frames STO-xxx or STO-xxxA SunEdison Modules with 35,40&50 mm frames SE YXXXZABCDE SunEdison Where"Y"can be B, F,H,P, R,or Z;"Z"can be 0 or 4;"A"can be B,C, D,E, H, ,J, K, L,M,orN;"B"can beBorW;"C"can beAorC;"D"can be3,7,8,or9; and"E"can be 0, 1 or 2 Suniva modules with 35,38,40,46,and 50 mm frames OPTxxx-AA-B-YYY-Z Suniva MVXxxx-AA-B-YYY-Z PAGE Where"AA"is either 60 or 72;"B"is either 4 or 5;"YYY"is either 100,101,700,1 B0,or 1B1;and"Z"is blank or B �� REVISION DATE:03/3/22 VERSION:v2.7 INSTALLATION GUIDE OD ooa EcoFa stena: For Installers. By Installers. MANUFACTURER LIST OF UL 2703 APPROVED MODULES Sunpower standard(G3 or G4)or InvisiMount(G5)35,40 and 46 mm frames SunpoWer SPR-Zb-xxx-YY Where"Z"is either A, E, P, M or X;"b"can be blank, 17, 18,19,20,21,or 22; and"YY"can be blank, BLK,COM,C-AC, D-AC, E-AC, BLK-E-AC,G-AC, BLK-C- AC,or BLK-D-AC Sunspark modules with 40 mm frames Sunspark SYY-xxxz-A Where"YY"can be MX or ST;and"Z"can be M, MB, M3, M3B, P or W;and "A"can be 60 or 72 Suntech Modules with 35,40 and 50mm frames Suntech STPxxxy-zz/aa ... ._ : Where -y Is btankarS;-and"z"can-be 20,_ 24;A6OWtsr A72tt`antr"aa"-zatrbe Vd,Vem,Vfw,Vfh,Wdb,Wde,Wd,or Wfhb Talesun modules with 35 and 40mm frames Talesun TP6yZZaaxxx-b Where"y'can be blank, F, H, or L;"ZZ"can be 60 or 72;"aa"can be M, M(H), or P;and"b"can be blank, B,T, or(H) Tesla modules with 40 mm frames Testa TxxxY Where"Y"can be H or S Trina Modules with 30,35,40 and 46mm frames TSM-xxxYYZZ Where"YY"can be DD05, DD06, DD14, DE09, DE14, DE06X, DE15, DE15V, Trina DEG15, PA05, PC05, PD05, PD06, PA14, PC14, PD14, PE14,or PE15 can be blank,(II), .05, .05 IIO,.08, , and"ZZ" .10, .18, .08D,.18D,0.82, .002, .00S, 05S, 08S,A,A.05,A.08,A.10,A.18,A(II),A.05(II),A.08(II),A.082(II),A.10(II),A.18(II),H, H(II), H.OS II, H.08(Ip, ( ) HC.20(II), HC.20(II), M, M(II), M.05(II), MC.20(II) URE modules with 35 mm frames URE DyZxxxaa Where"D"can be D or F,"y'can be A,6 or 7;"Z"can be K or M;and"aa"can be H3A,H4A, H8A,E7G-BB, E8G or E8G-BB Vikram solar modules with 40 mm frames Vikram VSyy.ZZ.AAA.bb Where"yy'can be M, P, MBB, MH, MS, MHBB,or PBS;"ZZ"can be 60 or 72; "AAA"is the module power rating;and"bb"can be 03,04 or 05 PAGE 34 REVISION DATE 03/3/22 VERSION:v2.7 Mai INSTALLATION GUILE a D oo EcoFastena For Installers. By Installers. MANUFACTURER LIST OF UL 2703 APPROVED MODULES VSUN modules with 30,35 and 40 mm frames VSUN VSUNxxx-YYz-aa Where"YY"can be 60, 72, 108, 120,or 144;"z"can be M, P, MH, PH,or BMH• and"aa"can be blank, BB or BW Waaree modules with 40mm frames Waaree WSyy-xxx where"yy"can be blank or M Winaico modules with 35 and 40 mm frames Winaico Wsy-xxxZa Where"y"can be either P or T;"Z"can be either M,P,or MX;and"a"can be blank or 6 Yingli modules with 35 and 40 mm frames Yingli YLxxxZ-yy Where"Z"can be D or p• W'can be 29b,30b,34d,35b,36b or 40d ZN Shine modules with 35mm frames ZN Shine ZXMY AaA-xxx/M Where"Y"can be 6 or 7,"AAA"can be 72, NH120, NH144 or NHDB144 PAGE 35 REVISION DATE:03/3/22 VERSION:v2.7 CLICK o D INSTALLATION GUIDE oa EcoFosten. For Installers. By Installers. CLAMP PART NUMBERS END CLAMPS Frame Thickness Article Number 30 mm 2099016 32 mm 2099017 35 mm 2099018 38 mm 2099019 40 mm 2099020 _. 45 mm 2099021 MID CLAMPS Frame Thickness Article Number 30-40 mm 2099022 40-50 mm 2099023 INSTALLER RESPONSIBILITIES Periodic re-inspection of components shall be performed to verify that there is no corrosion detrimental to system strength and electrical conductivity, no loose bolts,and/or other variables that could compromise array safety.Any corroded or damaged components shall be immediately replaced. PAGE 36 UEcoFosten For Installers. By Installers. COMPLETE MOUNT all & FLASH I NG ASSEMBLY NsTALLAT ON LI _- REVISION: 04/05/22 VERSION: V2.4 ECOFASTENSOLAR.COM REVISION:04/05/22 VERSION:V2.4 G F-1 aQD EcoFasten' INSTALLATION GUIDE For Installers. By Installers. CLICKING THE PAGE NAME WILL TAKE YOU TO THAT PAGE TABLE OF CONTENTS PAGE 01 FEATURES & BENEFITS PAGE 02 COMPONENTS PAGE 03 INSTALLATION PAGE 04 LINE DRAWINGS PAGE 06 SPECIFICATIONS PAGE 12 PAGE 01 REVISION:04/05/22 VERSION:V2.4 GF.11 aoDEf9F !9ffas INSTALLATION GUIDE RaA-441 * 0 P 4 z 7> STAtf ,;•,�)p p eft F 991u A°`4.h i 1 C+ti�a`�%4 dgVa<a p GF-1 GF-1 is our most versatile solution for composition shingle roofs. Install the flashing using a single fastener for a quick & easy installation. When using the GF-1 flashing grommet and an EcoFasten compression bracket, a watertight seal is created, maintaining the integrity of the roof. FEATURES • Mill or black finish • Patented Watertight Technology • Installs without removing shingles • Single lag bolt attachment • Compatible with a variety of compression brackets • Florida Product Approved for any combinationof 8"x12"GF-1 flashing with the ClickFit L-foot&Lag Screw PAGE 02 REVISION:04/05/22 VERSION:V2.4 GF.1.1 00 EcoFasten. INSTALLATION GUIDE VFor Installers. By Installers. SYSTEM COMPONENTS 0 0 0 4 1. L-FOOT SCL-101 BLK 3" 4. GF-1 FLASHING GLV MLL 8X12" - (OTHER OPTIONS AVAILABLE) GALVALUME FLASHING WITH PRE- INSTALLED EPDM RUBBER GASKET 2. 5/16" LAG BOLT (AVAILABLE IN 3"AND 4") (AVAILABLE IN 8X10&8X12.WITH MILL&BLACK FINISH OPTIONS) 3. 5/16" EPDM BONDED WASHER PAGE 03 REVISION:04l05/22 VERSION:V2.4 GF-1 INSTALLATION GUIDE aoD EcoFasteng For Installers. By Installers. INSTALLING GF-1 Snap horizontal lines across the roof to mark the mount rows,then locate the rafter and mark the installation position of each GF-1 flashing. QDrill a 7/32" pilot hole into the rafter or structural member for the lag screw. Backfill with sealant compatible with the roof type. )5T Slide flashing up under the next row of shingles directly above the pilot hole,taking care to align the hole in the flashing with the pilot hole. PAGE 04 REVISION:04/05/22 VERSION:V2.4 GF.1 INSTALLATION GUIDE ooa EcoFastem For Installers. By Installers. INSTALLING GF-1 Thread the EPDM bonded washer onto the lag bolt followed by one of EcoFasten's compression brackets and then insert the lag bolt into the gasketed hole in the flashing. - Drive the lag bolt down into the rafter using an impact driver. Torque range is between 100-400 torque inch-pounds depending on the type of wood and time of year.The visual indicator for proper torque is when the EPDM on the underside of the bonded washer begins to push out the sides as the washer compresses. Do not over torque. PAGE 05 REVISION:04l05/22 VERSION:V2.4 GF_i INSTALLATION GUIDE iEcoFasteng For Installers. By Installers. CUT SHEET: GF-1 FLASHING GLV MLL/BLK 6 I S 4 I 3 R.. 1 oESCRoioN I I, APPROVED ITEM NO. PART NUMBER DESCRIPTION OTY. REV, Revsous OM. APP o 1 750041-02 GF1-GAL-MLL-812 1 A A REIEuero MEC FORMAT{EGO 0721) o,M:zo. SoriPS 2 150002 5/1BONDED SEALING WASHER M 1 A %D D 8.[203.002]) 0 j C J © w rev- p�.pi kt 4e{'3 t ,vim [304.8] 8 B (0.02[0.5]) 30 RAO olrnrmnaialr THIRD ANGLE PROJECTION z rz li A wro T.alrzozl A 0A Ao,e.r0 vzozl I S oarovmzi .IMERPRET DIM AND TOLERANCE INNOVATIVE YOYNTIN6 ftliTEMf DO NOT SCALE DRAWING PER AS.E vlasIN•I-2w PROPRIETARY AND CON9NVmAE DIMENSIONS TOLERANCES ARE IN:GF-1 FLASHING GLV MLL 8X1 Z 1.PACKAGE PER"3012011-PCK" ...a,...o..=... xxxxCI+E so oww [MauMErE.Rs] A Owc 3012011 A(GF-1 FLASHING GLV MLL 8X12'50-PACK INST) 6 I 5 I 4 3 I 2 I 1 PAGE 06 REVISION:04/OS/22 VERSION:V2.4 G F 40D EcoFasten INSTALLATION GUIDE For Installers. By Installers. CUT SHEET: L-FOOT L-102 BLK 3" a I , I 4 � 3 2 1 I ITEM NO. PART NUMBER DESCRIPTION QTY. REV REVISous 1 450050-01 L-102-3 ANOD BLK 1 01 • ReLeAselo Esoer roxMn,IEcoxml I wraznoz I APnouPs 2 150009-08 SS HEX HD CAP SCREW,FULL THD,3/8-16 UNC X 1.25 LONG I 01 3 150011-03 SS SERRATED FLANGE LOCK NUT,3/8-16 I 02 411, D 0 C ( 3.00 1 IB B \I THIRD ANGLE PROJECTION 9c= Zo);g) A o.ravzo ro wrovsosl INTERPRET DIM AND TOLERANCE INNOVATIVE RO IUNRIN6 SVETEY A DO NOT SCALE DRAWING PER ASME rl4.s[M]-2m9 PROPRIETARY ANDCONNDENT4L DIMENSIONS TOLERANCES ARE IN: L-FOOT L-102 BLK 3 1.PACKAGE PER"3011015-PCK INCNEs. [MIULMETEEli (L-FOOT L 102 BLK 3 50 PACK INST) .00w. . w w«. xxxx:+i oao A I ow No. 3011015 17 nc�wraox rto corrnwxr xo[scecwc. ANGLES'.+1-I° SCff:11 WEIGH! sect or 6 I 5 I 4 ( 3 I 2 I 1 PAGE 07 REVISION:04/05/22 VERSION:V2.4 GF-1 aOD EcoFast INSTALLATION GUIDE en For Installers. By Installers. CUT SHEET: L-FOOT L-102 MLL 6" V I 5 I 4 I 3_ z ITEM NO. PART NUMBER DESCRIPTION QTY. REV REVISIONS REV DESCRIPTION DATE APPROVED 1 450082-02 L-102-6 1 01 A RELEASE TO ESDECrOR AT IECO nnzl woo,ete RAD/IPS 2 150009-08 SS HEX HD CAP SCREW,FULL THD,3/8-16 UNC X 1.25 LONG 1 01 3 150011-03 SS SERRATED FLANGE LOCK NUT,3/8-16 1 02 D D 0 C C / 1526.00 0 \[ .4]) • B 2 II/ 3.00 \[50.8] ) `[762]) THIRD ANGLE PROJECTION ° vo noz RAW RAD *',22Z C AI o�C C� A Q.EA,AxrrDa.'DD:D 0<rnrmsl , A 04/05/2021 INTERPRET DIM AND TOIERANCRgNCE INNOVATIVE YOUNi1Ni SYSTEMS DO NOT SCALE DRAWING RER ASME YIa.3IMl-2oov 1 IRDPRIV EVANDGONFIDENVIAL DIMENSIONSTOIERANCEiAREIN: -FOOT�-102 MLL 6 - INCH ES. 1MILLR./EiERSJ 1 PACKAGE PER"3011016-PCK" (L-FOOT L-102 MLL 6'50-PACK!NUT) "'" xx.xxx I NO 3011016 R?, ySi "*/-AID .xx'.y.25 A 6 I 50Bb0KX ANGLES:+/-1° ArE.LI WEIGH]. I s T pEi 4 ..A oM.wry 3 I 2 PAG E 08 REVISION:04/05/22 VERSION:V2.4 G F..1 INSTALLATION GUIDE oOD EcoFastenLR For Installers. By Installers. CUT SHEET: L-FOOT SCL-101 MLL/BLK 3" b I 5 I 4 I 3 I 1 I I ITEM NO. PART NUMBER DESCRIPTION QTY. REV. ONs 1 450049-02 L FOOT W/STANDARD DIMPLE AND OPEN SLOT,3 IN TALL MLL 1 01 A NEW RELEASE TO ESDEC FORMAT(ECONMR) 04/05/2021 APPROVED PS 2 150009-08 SS HEX HD CAP SCREW,FULL THD,3/8-16 UNC X 1.25 LONG 1 01 3 150011-03 SS SERRATED FLANGE LOCK NUT,3/8-16 1 02 ID D . .W" C C ( 0 [763.2]) s I • ( 188 )� © [47.6] THIRD ANGLE PROJECTION oOHECKRAwN=o 0sn>/SR �I rsD m /os/2m A NG MPR.J�O 0a/05/202 0 A MYR.TM 0</050021 A On /CS/201I INTERPRET DIM AND TOLERANCE INNOVATIVE YOUARINS SYSTEM DO NOT SCALE DRAWING PE'ASMEvlS5IMI-2 R L-FOOT SCL-101 MLL 3" --- 1.PACKAGEPER'3011017-PCK PROPRIETARY AND CONFIDENDAL DIMENSIONS TOLERANCES ARE IN: *r�. INCHES. TOLERANCES IL-FOOT SCL-101 MLL 3"5O-PACK INST.) xx:+/-oao .x.y,x25 I owO.Nc 301 101 7 I A rcao Oa *Ecwc ANGLES SCALE LTI I wEicm. I I 1nF 6 5 4 3 I 2 i0F PAGE 09 REVISION:04/05/22 VERSION:V2.4 G F...1 ooa EcoFastert INSTALLATION GUIDE For Installers. By Installers. CUT SHEET: CF UNIV L-FOOT MLL 3" - 2012022 6 S 4 3 2 ITEM NO. PART NUMBER DESCRIPTION QTY. REV. REVISIONS REF. oescRiEnoN once APPROVED 1 750120 CLICKFIT L FOOT ASSEMBLY 1 A n New RELEASE TO BOER FORMAT FERO NM) 05i27/2021 RAo/iP5 D D O ____________#1, — 4Y�I'IC ! , / c Iiii I/ 2.76 1 g /...4::pr B THIRD ANGLE PROJECTION o RAo vxvTO .)1-- A +—El mlcAPeYMo ompnI � A) INTERPRET DIM AND TOLERANCE INNOVATIVE M®YNTINB SYSTEMS DO NOT SCALE DRAWING PERASMEOIO5[MI-zoos I' PROPRIETARYANO CONEIOEMIAI DIMENSIONS iOLERFT MSAREIN: CF UNIV L—FOOT MLL 3" ..; e"' ICHES. [MILLIMEiER$I I.PACKAGE PER"2012022-PCK" xx.+/-.oao .x:./-.i5 c.no. 2012022 (CF UNIV L-FOOT MLL 3"50-PACK INST.) ego eF. ro��c.o xzx./-.olo xx:+/ zs AM E EicHr eFI RA .Eo.owc�w�,>...o....wwl. w...wr.xE woN..FN:F,o.or�oE� carawn .c ANGLES:t/-1° .,.i 6 I 5 I 4 I 3 I 2sc I 1 PAGE 10 REVISION:04/05/22 VERSION:V2.4 GF-1 o0a EcoFasten' INSTALLATION GUIDE For Installers. By Installers. CUT SHEET: RI COMP SLIDE AL BLK - 2011013 6 1 5 I 4 1 3 I 2 I 1 ITEM NO. PART NUMBER DESCRIPTION QTY. REV. oNs APPROVED r 1 450092-01 ROCKIT V3 SLIDECOMP I 01 A 1W RELEASE TO ESDE.FORMAT ILCO+r33} 07/I2av RAD JPS 2 53-100-010 LAG SCREW,5/16-4"W.THASHERREAD 3",EPDM BACKED 1 C D D C C 0 4.00 [101.6] B B THIRD ANGLE PROJECTION ° slxcixox' N,,I D)Ng fNGAPT ws aiuTmm J iA El MwAPPx.ro wn3i:ov A '; _wrERvaEr DIM qND TOLERANCE INNOVATIVE YOUNIINi LV4TOY4 DO NOT SCALE DRAWING PER ASME V.SL"-zoov n !� SLIDE BLK PROP0.IREAEYANO CONPIDEMIAL DIMENSIONS TOLERgNCESAREIN: RI COMP SLIDE AL BLK INCHES. 1MILLIMEiERS1 1.PACKAGE PER"2011013-PCK" xx:+i-.03o x y-�s e DWc.HO. xxx:+1-.Lb .xx:+i zs A I WSICM 2011013I Rq_ eT...oIE (RI COMP SLIDE AL BLK 50-PACK INST.) aP.o.ema gar aeEsoE�rK ALPo3 : o� 6 I 5 I 4 r 3 I 2sc .. I 1 L .. PAGE 11 REVISION:04/05/22 VERSION:V2.4 GF.1 INSTALLATION GUIDE iEcoFostenR For Installers. By Installers. i • SYSTEM COMPONENTS 1. GF-1 Flashing: All flashing options come with a pre-installed integrated EPDM grommet and one bonded stainless steel EPDM washer. Flashing are available in three options: 1. 8 x 12" .032 gauge galvalume with mill or black (kynar painted) finish. 2. 8 x 10" .032 gauge galvalume with black (kynar painted) finish. 3. 8 x 12" .032 gauge aluminum with black (kynar painted) finish. 2. Aluminum Compression Bracket: Compatible with a variety of EcoFasten compression brackets. EcoFasten compression brackets are made out 6000 series aluminum with options available for mill or black finishes depending on the bracket. 3. Recommended Fasteners 5/16"x4" lag bolts. 3" option also available. 4. Recommended Sealant: If required by roof manufacturer, sealant shall be roof manufacturer approved. DELIVERY / STORAGE / HANDLING Inspect material upon delivery. Notify manufacturer within 24 hours of any missing or defective items. Keep material dry, covered and off the ground until installed. PAGE 12 REVISION:01/05/22 VERSION:V2A INSTALLATION GUIDE aoDEcoFastert For Installers. By Installers. FLORIDA PRODUCT APPROVAL Approved for any combination of 8"x12" GF-1 flashing with the ClickFit L-foot & Lag Screw. PATENTS Visit www.efpatents.com for patent information. DESIGN REQUIREMENTS 1. Bracket spacing to be recommended by project engineer. 2. It is important to design new structures or assess existing structures to make sure they withstand retained loads. EXAMINATION 1 . Substrate: Inspect structure on which brackets are to be installed and verify that it will withstand any additional loading that may be incurred. 2. Notify General Contractor of any deficiencies before installing EcoFasten Solar brackets. 3. Verify that roofing material has been installed correctly prior to installing solar attachment bracket. INSTALLATION Comply with architectural drawings and project engineer's recommendation for PAGE location of system. Comply with Manufacturer's written installation instructions for 13 installation and layout. 4141 W. VAN BUREN ST, SUITE 2, PHOENIX AZ 85009 COrCISte An Esdec Solar Group Company 1 - 8 7 7 - 8 5 9 - 3 9 4 7 I I N" F O @E C O"F A S T E NS OL A R.C O M • ntertek Total Quality.Assured. ESDEC, INC, SCOPE OF WORK UL 441 TESTING ON ECOFASTEN'S GF1 REPORT NUMBER 104500499LAX-001 ISSUE DATE 09-DECEMBER-2020 PAGES 6 DOCUMENT CONTROL NUMBER GFT-OP-10a(21-June-2019) ©2019 INTERTEK 11110 !„. Intertek 25800 Commercentre Drive Lake Forest,CA 92630 USA Total Quality.Assured. Telephone: (949)448-4100 Facsimile: (949)448-4111 SUMMARY REPORT www.intertek.com 09-DECEMBER-2020 Intertek Report No.:104500499LAX-001 Intertek Project No.:G104500499 Yann Schwarz Ph:510 225-0973 ESDEC, Inc. Email:yann.schwarz@esdec.com 28357 Industrial Blvd. Hayward,CA 94545 Subject: Project Summary of the Rain Testing per UL 441 on Ecofasten's GF1 Dear Mr.Yann Schwarz Intertek was contracted by ESDEC, Inc.to perform testing in general accordance with UL 441 on Ecofasten's GF1 photovoltaic(PV)module attachment. Results obtained are tested values and were secured by using the designated test method(s).Testing was conducted at ESDEC's test facility at 28357 Industrial BLVD, Hayward,CA 94545. This letter report represents the summary of our evaluation of the above referenced product(s). UL 441,Safety for Gas Vents,Section 27:Rain Test This letter report does not constitute certification of this product or any opinion or endorsement by this laboratory. If there are any questions regarding the results contained in this report,or any of the other services offered by Intertek,please do not hesitate to contact your dedicated Intertek Project Manager. Completed by: Deep Vora Reviewed by: Samantha Doshi Title: Project Engineer Title: Team Lead-Solar Ac ()P19j/ Signature: Signature Date December 09,2020 Date: December 09,2020 Please note:this Letter Report does not represent authorization for the use of any Intertek certification marks. This report is for the exclusive use of Intertek's Client and is provided pursuant to the agreement between Intertek and its Client. Intertek's responsibility and liability are limited to the terms and conditions of the agreement. Intertek assumes no liability to any party,other than to the Client in accordance with the agreement,for any loss,expense or damage occasioned by the use of this report.Only the Client is authorized to permit copying or distribution of this report and then only in its entirety. Any use of the Intertek name or one of its marks for the sale or advertisement of the tested material,product or service must first be approved in writing by Intertek.The observations and test results in this report are relevant only to the sample tested. This report by itself does not imply that the material,product,or service is or has ever been under an Intertek certification program. Version:21-June-2019 Page 2 of 6 GFT-OP-10a Lnt?rtPk ESDEC Inc. 104500499LAX-001 Total Quality.Assured. SUMMARY REPORT MATERIAL SOURCE/INSTALLATION The test specimen was provided by the client.The specimen was installed onto a Spruce- Pine-Fir wood deck. The test deck measured 3'wide by 3' high and was constructed of#2 Spruce Pine Fir nominal 2x4 lumber. One rafter was centered on deck for bolt attachment. The rafters were attached to the top and bottom plates with 3" long roofing screws. A sheet of nominal 15/32"thick plywood was secured to the studs with#8 x 1-5/8" roofing screws. The test deck was then covered with#30 felt paper and three-tab asphalt shingles. Description/Installation(GF1 by Ecofasten):The test specimen was composed of an 8"x 12"x 0.03125"thick galvalume flashing and a 1-7/8"wide by 3" high extruded aluminum L- foot. The underside of the L-foot was secured with one 5/16"x 4" lag screw with a EPDM backed washer through the L-foot,flashing and into the center rafter of the test deck. The GF1 assembly was installed without sealant. GF1 L-Foot Part numbers covered by this test report are as follows:3011015 or L-102-3-ANOD BLK L-FOOT L-102 BLK 3" 3011017 or SCL-101-3 ANOD BLK L-FOOT SCL-1010 MLL 3" 3011018 or SCL-101-3 L-FOOT SCL-1010 BLK 3" LIST OF OFFICIAL OBSERVERS V'" 6 t,f Jae Hendrickson ESDEC, Inc. TEST RESULTS The temperature during testing was 18°C(64°F)and the humidity was 57%. The results are tabulated as follows: Test Specimen#1(GF1 by Ecofasten): Water Penetration, Pass No leakage 1, 2,3 • Per UL 441-One hour of water spray General Note:All testing was performed in accordance with the referenced standard(s). Note 1:Tested at 2/12 pitch Note 2:Test results are applicable for asphalt shingle roofs having a slope of 2:12 or greater Note 3:No sealant was used in this test.Any Roofing manufacturer approved sealant is allowed Version:21-June-2019 Page 3 of 6 GFT-OP-10a .. , ntcrt?k ESDEC Inc. 104500499LAX-001 Total Quality.Assured. SUMMARY REPORT • PHOTOGRAPHS - ,, -*- ° � ;s :Pm� x gyp... ' A ,'� . 'a 4 - i • 3 Photo No.1 Unassembled Test Specimen(including 1 lag screw,1 flashing,and 1 aluminium L-foot) *44., ".„7;:..2.,L„, , rill , ir ,, 3 4 1 _ �+4;-^-TOE!!! m • . i Photo No.2 Test Specimen Under Test Version:21-June-2019 Page 4 of 6 GFT-OP-10a . • tntzrtck ESDEC Inc. 104500499LAX-001 Total Quality.Assured. SUMMARY REPORT t Photo No.3 Test Specimen After Test 'iff*:, , I .€&�'T • ' c . Photo No.4 Underside of Test Desk After Test—no visible water penetration Version:21-June-2019 Page 5 of 6 GFT-OP-10a tntertek ESDEC Inc. 104500499LAX-001 Total Quality.Assured. SUMMARY REPORT DRAWINGS The test specimen drawings have been reviewed by Intertek and are representative of the test specimen(s)reported herein.Any deviations are documented herein or on the drawings. MEN DeKonica [21Z11 ort rvvalG.WALL OR i «G-.rnu aP SLACK LAG At ID 50rc®W . 5716%4r1,1/2011E01.1MD 1200 534 a Pwd14101 1'V1G MOLE PA76011 pRPHAAt Lra PART*raroat 5m [76s] rar 1.06 [u6] 411. II " s 00 6.3J Y 930 Eee THIRD MOLE PQpIEC7011 aa. 7=i eamer ».s slx r sr srwmsm mO 0o ra.scME['lawyerwe"' *" � ECOFASTEN GF1 lrG11BM14w C W rbMl WG W14 wa vs A I°" 800114 I%a; Drawing No.1 Ecofasten's GF1 Version:21-June-2019 Page 6 of 6 GFT-OP-10a