Loading...
Permit (3) CITY OF TIGARD BUILDING PERMIT COMMUNITY DEVELOPMENT Permit#: BUP2023-00047 'EGAR.E9 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Date Issued: 5/22/2023 Parcel: 2S112DA00700 Jurisdiction: Tigard Site address: 15353 SW SEQUOIA PKWY 190 Project: Spec Space Subdivision: PACIFIC CORPORATE CENTER Lot: 3 Project Description: Landlord work prior to TI: Demolition,new walls and restrooms. Contractor: PACIFIC REALTY ASSOCIATES LP Owner: PACIFIC REALTY ASSOCIATES LP 15350 SW SEQUOIA PKWY#300 ATTN: N PIVEN PORTLAND, OR 97224 15350 SW SEQUOIA PKWY#300 PORTLAND, OR 97224 PHONE: 503-624-6300 PHONE: FAX: 503-624-7755 Specifics: FEES Type of Use: COM Description Date Amount Class of Work: ALT Type of Const: IIIB Permit Fee-Additions,Alterations, 05/22/2023 $674.35 Occupancy Grp: B Occupancy Load: 57 Demolition Dwelling Units: 0 12%State Surcharge-Building 05/22/2023 $80.92 Stories: 0 Plan Review 04/12/2023 $438.33 Height: 0 ft Bedrooms: 0 Bathrooms: 0 Tenant Improvements in Existing 05/22/2023 $123.00 Development Value: $45,000 Plan Review-Fire Life Safety 05/22/2023 $269.74 Info Process/Archiving-Lg$2.00(over 05/22/2023 $12.00 Floor Areas: 11x17) Total Area: 0 Accessory Struct: 0 Basement: 0 Carport: 0 Covered Porch: 0 Deck: 0 Garage: 0 Mezzanine: 0 Total $1,598.34 Required: Required Items and Reports(Conditions) Fire Sprinkler: Parapet: Fire Alarm: Protected Corridors: Smoke Detectors: Manual Pull Stations: Accessible Parking: 0 This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law require you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR 952-001-0010 through OAR 01-009 . You m obtain a eepy of e rules or direct questions to OUNC by calling 503.232.1987 or 1.800.332.2344. Issued By: Permittee Signature: &""' Gr7�/j� Call 503.639.4175 by 7:00 a.m.for the next available inspection date. (/ This permit card shall be kept in a conspicuous place on the job site until completion of the project. Approved plans are required on the job site at the time of each inspection. Building Permit Application Commercial FOR OFFICE USE ONLY Cityof Tigard11 Received g Permit No.: 13125 SW Hall Blvd.,Tigard,OR 97223ECEIVE , DateBy: •/�' �, — t��i , �. ��t'iT� Plan Review [1 ErII Phone: 503.718.2439 Fax: 503.598.19 Date/By: y' ) ) —Z3 Other Permit: T IGARD Inspection Line: 503.639.4175 Date ReadyBy: mds: li>J See Page 2 for Internet: www.tigard-or.gov APR 1 2 2023 NytifiedMeth� I � Supplemental Information TyI'E OF WORliGI O I ARD REQUIRED DATA:1-AND 2-FAMILY DWELLING t�1 .�1 lG DIVISION ❑New construction ❑Demolition Permit fees*are based on the value of the work performed. Indicate the value(rounded to the nearest dollar)of all ®Addition/alteration/replacement ❑Other: equipment,materials,labor,overhead,and the profit for the CATEGORY OF CONSTRUCTION work indicated on this application. ❑ 1-and 2-family dwelling ElCommercial/industrial Valuation: $ CIAccessory building El Multi-family Number of bedrooms: ❑Master builder ❑Other: Number of bathrooms: JOB SITE INFORMATION AND LOCATION Total number of floors: Job site address: 15353 SW Sequoia Parkway New dwelling area: square feet City/State/ZIP:Portland,OR 97224 Garage/carport area: square feet Suite/bldg./apt.no.: 190 Project name:pcc227-190 Spec r Covered porch area: square feet Cross street/directions to job site: Deck area: square feet Other structure area: square feet REQUIRED DATA:COMMERCIAL-USE CHECKLIST Subdivision: Lot no.: Permit fees*are based on the value of the work performed. Tax map/parcel no.: Indicate the value(rounded to the nearest dollar)of all equipment,materials,labor,overhead,and the profit for the DESCRIPTION OF WORK work indicated on this application. New restrooms for 8,527 SF existing office space relinquished by adjacent tenant Valuation: $45,000.00 Work incl.selected demo of existing nonstructural walls,construction of non- Existing building area: 8,527 square feet structural dryywall/metal studs walls,elec.distr.,lighting alterations New building area: 8,527 square feet . ® PROPERTY OWNER 0 TENANT Number of stories: I Name:Pacific Realty Associates,LP. Type of construction: III-B Address: 15350 SW Sequoia Parkway,Suite 300 Occupancy groups: City/State/ZIP:Portland,OR 97224 Existing: B Phone:(503)624-6300 Fax:(503)624-7755 New: B 1;APPLICANT 0 .CONTACT PgRSOiV :,•BUILDING PERMITFEES* Business name:Pacific Realty Associates,LP. fPleiase:r8jsr'tofeesrhedrrkl Structural plan review fee(or deposit): Contact name:Robert Bumcrot FLS plan review fee(if applicable): Address: 15350 SW Sequoia Parkway,Suite 300 City/State/ZIP:Portland,OR 97224 Total fees due upon application: Phone:(503)624-6300 Fax::(503)624-7755 Amount received: E-mail:permits@pactrust.com PHOTOVOLTAIC SOLAR PANEL SYSTEM FEES* CONTRACTOR Commercial and residential prescriptive installation of roof-top mounted PhotoVoltaic Solar Panel System. Business name:Pacific Realty Associates,LP. Submit two(2)sets of roof plan with connection details and fire department access,along with the 2010 Oregon Address: 15350 SW Sequoia Parkway,Suite 300 Solar Installation Specialty Code checklist. City/State/ZIP:Portland,OR 97224 Permit fee(includes plan review and administrative fees): $180.00 Phone:(503)624-6300 Fax:( ) State surcharge(12%of permit fee): $21.60 CCB lic.:153913 Total fee due upon application: $201.60 Authorized signature: This permit application expires if a permit is not obtained within 180 days after it has been accepted as complete. Print name:Robert Bu crot Date: 4/12/2023 * Fee methodology set by Tri-County Building Industry Service Board. L•\Building\Permits\ P-COM PermitApp.doe 02/24/2011 440-4613T(11/02/COM/WEB) City of Tigard N COMMUNITY DEVELOPMENT DEPARTMENT 111111 TIGARD Building Permit Review — Commercial - No Land Use Building Permit #: BOP W23_ O6)O1'1~7 Site Address: I ''S Cud g?&21171A `-f'1t / Suite/Bldg#: ?( Project Name: , I C . (Name of commercial business occupying the space. If vacant,enter Spec Space.) Planning Review Proposal: 1--- ' / /Nirr r 012_ orlcy Existing Business Activity: O j Cl Proposed siness Activity:a" Verify site address/suite# exists and active in permit system. ❑ ,iver Terrace Neighborhood: ❑ Yes L•YNo ,, 'ng: I— P Pe `tted Use: E.—Yes ❑ No ❑ Spec Space nfirm no land use required. Business License: Exists: ❑ Yes No,applicant was provided a business license application Notes: Approved by Planning: Date: 1/2 /3 Revisions (after Building Submittal only) Reviewer Date Revision 1: ❑ Approved ❑ Not Approved Revision 2: ❑ Approved ❑ Not Approved Revision 3: E Approved ❑ Not Approved Building Permit Submittal Original Submittal Date: Lil Site Plans: # 2, Building Plans: # 4 . Building Permit#: ` nter building permit#above. Workflow Routing: ' lanning 2rFermit Coordinator e Building Workflow Sign-off: n/S'ign-off for Planning(include notes from planning review) Route Application Documents: 1r Building: original permit application, site plans,building plans, engineer and beam calculations and trust details,if applicable,etc. Notes: By Permit Technician: 4161 Date: t// Z3 I:\BuildingTonns\BldgPennitRvw COM NoLandUse 09072022.doex Engineering Review ❑ Slope at'building pad: ❑ PFI Permit • ❑ Conditions "Met' .rior to issuance of permit ❑ Easements (encroac' ' ents) per engineering conditions of approval and plat (not typical on SDR/CUP) ❑ Water Quality/Quantity .cility: Assess Water Quality Fe- •n-lieu: ❑ Yes ❑ No Assess Water Quantity Fee lieu: ❑ Yes ❑ No LIDA Facility on lot: ❑ Yes ❑ No Add Fee: ❑ Yes ❑ No ❑ NOT Approved by Engineering: Date Notes: Approved by Engineering: Date: Revisions (after Building Submittal only) Reviewer Date Revision 1: ❑ Approved ❑ Not Approved Revision 2: ❑ Approved ❑ Not Approved Revision 3: ❑ Approved ❑ Not Approved Permit Coordinator Review Conditions "Met"prior to issuance of permit ❑ Approved,NOT Released: Date: ❑ ENG Revisions Required: Date: Notes: /SDC Exemption ❑ Applied for ❑ Received %Does not apply Fees Entered: Wash Co Trans Dev Tax: ❑ Yes /N/A ❑ Deferred Tigard Trans SDC: ❑ Yes /N/A ❑ Deferred Parks SDC: ❑ Yes / N/A ❑ Deferred LIDA Fee: ❑ Yes N/A OK to Issue/Approved by Permit Coordinator: Date: 41 [21 2,0Z'6 Revisions (after Building Submittal only) Reviewer Date Revision 1: ❑ Approved ❑ Not Approved Revision 2: ❑ Approved ❑ Not Approved Revision 3: ❑ Approved ❑ Not Approved I:\Building\Forms\B1dgPermitRvw_COM_NoLandUse_08162022.docx