Report (3) City of Tigard
Deferral Until Occupancy Request
T I G A R D Washington County Transportation Development Tax (TDT ,Transportation and Parks System
Development Charges (SDCs)
This form is to be signed and submitted prior building permit issuance or,if no building permit is required,then
upon land use approval(TMC 3.24, as amended by Ordinance No. 21-09).
Date: 11/14/2022 Site Address: 16707 SW Beemer Ln
Project Northside View Land Use Case or
Name: @ SRT Building Permit#: MST2022-00464
Tax Lot 2S107AD06200 Total Parks $8,699.00
#: Lot 2 Amount*:
TDT Total TSDC
Amount: N/A Amount*: $12,004.00
*The total TSDC amount shown above is the sum of$7,760.00 for TSDC-Improvement,$448.00 for TSDC-
Reimbursement, and$3,796.00 for TSDC-River Terrace,if applicable..
*The total Parks SDC amount shown above is the sum of$ 6,812.00 for Parks-Improvement,$ 1,887.00 for Parks-
Reimbursement,and either$ N/A for Parks-Neighborhood or$ N/A for Parks-Neighborhood River Terrace.
This constitutes my request to defer payment of the TDT,TSDC, and Parks SDCs, as provided above,
until occupancy.
Payment of the TDT,TSDC, and Parks SDCs may be deferred until issuance of the occupancy permit. In
requesting this option,I understand that any deferred TDT,TSDC, and Parks SDCs must be paid prior to final
inspection or issuance of an occupancy permit.
TDT may only be deferred if the TDT is greater than the amount for a single-family residence. I further
understand that the amount of TDT due on deferred obligations shall be the amount in effect at the time of
issuance of the building permit.
For a deferral request to be accepted both the Property Owner and the Developer must sign this request.
Property Owner: Ow..ar ALa.vni,AlrQ> s (Taylor Morrison NW) Date: 11/14/2022
Developer:Oar Al.a.ww At .a fy(Taylor Morrison NW) Date: 11/14/2022
Permit Coordinator: ATM Oeitivteirb Date: 11/14/2022