Report (2) City of Tigard
II = Deferral Until Occupancy Request
T I G A R D Washington County Transportation Development Tax (TDT),Transportation and Parks System
Development Charges (SDCs)
This form is to be signed and submitted prior building permit issuance or,if no building permit is required,then
upon land use approval(TMC 3.24,as amended by Ordinance No. 21-09).
Date: 10/25/2022 Site Address: 14750 SW 169th Ave
Project Creekview at7 SRT Land Use Case or MST2022-00409
Name: Lot 26 Building Permit#:
Tax Lot 2S107AD11400 Total Parks $8,699.00
#: Amount*:
TDT N/A Total TSDC $12,004.00
Amount: Amount*:
*The total TSDC amount shown above is the sum of$ 7,760.00 for TSDC-Improvement,$448.00 for TSDC-
Reimbursement,and$3,796.00 for TSDC-River Terrace,if applicable..
*The total Parks SDC amount shown above is the sum of$ 6,812.00 for Parks-Improvement,$ 1,887.00 for Parks-
Reimbursement,and either$ N/A for Parks-Neighborhood or$ N/A for Parks-Neighborhood River Terrace.
This constitutes my request to defer payment of the TDT,TSDC, and Parks SDCs, as provided above,
until occupancy.
Payment of the TDT,TSDC, and Parks SDCs may be deferred until issuance of the occupancy permit. In
requesting this option, I understand that any deferred TDT,TSDC, and Parks SDCs must be paid prior to final
inspection or issuance of an occupancy permit.
TDT may only be deferred if the TDT is greater than the amount for a single-family residence. I further
understand that the amount of TDT due on deferred obligations shall be the amount in effect at the time of
issuance of the building permit.
For a deferral request to be accepted both the Property Owner and the Developer must sign this request.
Property Owner: Omar Abby(Taylor Morrison NW) Date: 10/25/2022
Developer:Omar ALavwi,Ab-ovi-144-f-s,(Taylor Morrison NW) Date: 10/25/2022
Permit Coordinator: ATIM (A/ l.JJ I Date: 10/25/2022