Loading...
Permit (6) CITY OF TIGARD BUILDING PERMIT 2 COMMUNITY DEVELOPMENT Permit#: BUP2023-00055 T t GARD 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Date Issued: 5/30/2023 Parcel: 2S102BA00901 Jurisdiction: Tigard Site address: 9570 SW TIGARD ST Project: T.H.E.Remodel Group Subdivision:RTH TIGARDVILLE ADDITION,AMENC Lot: 58 Project Description: TI for new tenant:Demolition,new walls,stairs,and ADA upgrades. Contractor: THE REMODEL GROUP Owner: TYLER HART PROPERTIES LLC 10019 SW CONCHO CT 10019 SW CONCHO CT TUALATIN, OR 97062 TUALATIN, OR 97062 PHONE: 503-869-1290 PHONE: FAX: Specifics: FEES Description Date Amount Type of Use: COM Class of Work: ALT Type of Const: VB Permit Fee-Additions,Alterations, 05/22/2023 $782.16 Occupancy Grp: B Occupancy Load: 10 Demolition 12%State Surcharge-Building 05/22/2023 $93.86 Dwelling Units: 0 Plan Review 04/26/2023 $508.40 Stories: 0 Height: 0 ft Plan Review-Fire Life Safety 05/22/2023 $312.86 Bedrooms: 0 Bathrooms: 0 Info Process/Archiving-Sm$0.50(up to 05/22/2023 $7.00 Value: $56,400 11x17) Tenant Improvements in Existing 05/22/2023 $123.00 Development Floor Areas: Total Area: 0 Accessory Struct: 0 Basement: 0 Carport: 0 Covered Porch: 0 Deck: 0 Garage: 0 Mezzanine: 0 Total $1,827.28 Required: Required Items and Reports(Conditions) Fire Sprinkler: Parapet: Fire Alarm: Protected Corridors: Smoke Detectors: Manual Pull Stations: Accessible Parking: 0 This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR 952-001-0010 through OAR 952-001-0090. You m obtain a copy of the rules or direct questions to OUNC by calling 503.232.1987 or 1.800.332.2344. Issued By: ermittee Signature: Call 503.639.4175 by 7:00 a.m.for the next available inspection date. This permit card shall be kept in a conspicuous place on the job site until completion of the project. Approved plans are required on the job site at the time of each inspection. Building Permit Applicatio> IV EDCommercial r()lk oil I('1. I SI.O\i.1 City of Tigard 2 Q 2023 Da«Y �l (2ai2a23P PernitNo.:��P2v23. 5_ 13125 SW Hall Blvd.,Tigard,OR 97223 Plan Review ' Phone: 503-718-2439 Fax: 503-598- Date/By: c _3 - Related Permit: ' 9Y �Ti !'. p r I c, \R t� Inspection Line: 503-639-4175 p { i�, {! Date Ready/By: Juris: El See Page 2 for Internet: Line gard-or.gov BUILDING lVw� 1;y otified/Method:57 2J Supplemental Information TYPE OF WORK REQUIRED DATA:1-.AND 2-FAMILY DWELLING ❑New construction 0 Demolition Permit fees*are based on the value of the work performed. Indicate the value(rounded to the nearest dollar)of all ®Addition/alteration/replacement ❑Other: equipment,materials,labor,overhead,and the profit for the CATEGORY OFCONSI'RUCTION work indicated on this application. ❑ 1-and 2-family dwelling RICommercial/industrial Valuation: $ ElAccessory building 0 Multi-family Number of bedrooms: ❑Master builder 0 Other: Number of bathrooms: JOB SITE INFORMATION AND LOCATION • Total number of floors: Job site address: 9570 SW Tigard Street New dwelling area: square feet City/State/ZIP: Tigard, OR 97223 Garage/carport area: square feet Suite/bldg./apt.#: Project name: TRG Tigard Office 2023 Covered porch area: square feet (9570 SW Tigard St 97223) Cross street/directions to job site: S side of SW Tigard Street between Deck area: square feet SW Grant Avenue and Pacific Highway West Other structure area: square feet REQUIRED DATA:COMMERCIAL-USE CHECKLIST Subdivision: CPO 4B Bull Mountain-Tigard I Lot#: Permit fees*are based on the value of the work performed. Tax map/parcel#: 2S 1 O2BA00901 Indicate the value(rounded to the nearest dollar)of all equipment,materials,labor,overhead,and the profit for the DESCRIPTION OF WORD - work indicated on this application. All new MEP; bathroom remodel; kitchen remodel; remove walls Valuation: $ - -- 15&� 00 from east end area to open up for storage; reconfigure stairs Existing building area: 1,584 square feet from hail to east storage, ADA upgrades, ex,st-1^A c«+e,QJte_ + 'IQ ena New building area: 1,584 square feet ® PROPERTY OWNER ❑ TENANT' Number of stories: 1 Name: Tyler ler Hart Properties Type of construction: Wood frame Address: 10019 SW Concho Court Occupancy groups: City/State/ZIP: Tualatin, OR 97062 Existing: Office Phone:(971) 221-6852 Fax:( ) New: Office APPLICANT ®�ITACT PERSON BUILDING PERMITFEES* Business name: T.H.E. Remodel Group (Please r erto fee schedule) Structural plan review fee(or deposit): Contact name:Dayna Tracy Address: 20400 SW Avery Court FLS plan review fee(if applicable): Total fees due upon application: City/State/ZIP: Tualatin, OR 97062 Amount received: Phone:(503 869-1290 Fax::( ) E-mail: Dayna@TheRemodelGroup.com PHOTOVO'�TAICSOL PANEL SY TEM FEES* Commercial and residential prescriptive installation of CONTRACTOR roof-top mounted Photo Voltaic Solar Panel System. Business name: T.H.E. Remodel Group Submit two(2)sets of roof plan with connection details and fire department access,along with the 2010 Oregon Address: 20400 SW Avery Court Solar Installation Specialty Code checklist. City/State/ZIP: Tualatin, OR 97062 Permit fee(includes plan review $180.00 and administrative fees): Phone:(503)869-1290 Fax:( ) State surcharge(12%of permit fee): $21.60 CCB Lie.: 177821 Total fee due upon application: $201.60 (-1 Authorized signature: This permit application expires if a permit is not obtained within 180 days after it has been accepted as complete. Print name: D � //1 Date: /� L * Fee methodology set by Tri-County Building Industry l / y Service Board. I:\Building\Permits\BUP_COM_Permit/App.doc Rev.04/21/2014 440-4613T(11/02/COM/WEB) City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT Accessibility: Barrier Removal Improvement Plan Commercial & Multi-Family - Additions or Alterations T IC AR-1) 13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503.718.2439 • www.tigard-or.gov REQUIREMENT: OREGON REVISED STATUTE (ORS)447.241. (1) Every project for renovation,alteration or modification to affected buildings and related facilities shall be made to insure that the path of travel to the altered area and the restroom, telephones and drinking fountains are readily accessible to individuals with disabilities unless such alterations are disproportionate to the overall alterations in terms of cost and scope. (2) Alterations made to the path of travel to an altered area may be deemed disproportionate to the overall alteration when the cost exceeds twenty-five percent(25%). VALUATION: Total of all renovation,alteration or modification being done, 56,400 excluding painting and wallpapering: [1] $ MULTIPLIER(25%barrier removal requirement): x .25 TOTAL BUDGET FOR BARRIER REMOVAL: [2] $ 14,100 ELEMENTS: In choosing which accessible elements to provide under this section,priority shall be given to those elements that will provide the greatest access. Elements shall be provided in the following order: (a) Parking $ (b) An accessible entrance: $ 4,600 (c) An accessible route to the altered area: $ (d) At least one accessible restroom for each sex or a single unisex 11,500 restroom: $ (e) Accessible telephones: $ (f) Accessible drinking fountains:and, $ (g) When possible,additional accessible elements such as storage and alarms: Door hardware $ 520 TOTAL(shall equal line [2] of Valuation Computation): $ 16,620 I:\Building\Permits\BUP_COM_PermitApp.doc Rev.03/05/2019 City of Tigard illN COMMUNITY DEVELOPMENT DEPARTMENT ■ TIGARD Building Permit Review — Commercial - No Land Use Building Permit #: 160)2p2 - 0005 Site Address: S 7o S LJ riJ,,,,f-,,,,f- `? Suite/Bldg#: ,-- Project Name: -if ki.F- _ ( Q..vne p l (.r- p 6 t'(Q ( T. (Name of commercial business occupying the space. If vacant,enter Spec Space.) Planning Review Proposal: Ali ro' ``? ,, .M --cct , P,.t ' i'er,7v', rwYA,3M ! t:. „,, ,ole , �"'"= t�s5't _uA- j(`Y�' ,^� k' ,''i v) \�,, I�, )':, ' i,..J<? ,,/'^:) A i�,A. u('�r..,t1 t, - i, S' i �-1 s... '� i-„al Cr 4 i ,,,:`i'-i e si%S cdnatit Cfi..'+hc . Is1rii. Existing Business Activity: i`, Pro osed Business Activity: t ( 4(e. eeri site address suite# exists and activein fy / permit syst �� ver Terrace Neighborhood: ❑ Yes LEI No 0/Zoning: :LT—f M ermitted Use: Er Yes ❑ No ❑ Spec Space Er PC, no land use required. IVII Business License: Exists: ❑ Yes �No,applicant was provided a business license application Notes: w n T ,. i I� 01\ �C...r ..t. . ' i.,,t b :� 4-`'''` �f;sk ,,,,v5 — `-i,?'t• �'5 } Vq,,Iliti n: c ® C�lw, '. .0 _u� N c_. )0 -7: t_ € .<�5C', f, 0 i, +►tk fop .4,2%^�ti. ley S�saa, s FADe.). `' no Mvt'j reku:re.�. f. d pr,+e.�q. r off'-94-c�.ci- Qa/uc<I/1 nc,Ncei. .4.,i Approved by Planning: Date: 14/ ).o l20 .. Revisions (after Building Submittal only) Reviewer Date Revision 1: ❑ Approved ❑ Not Approved Revision 2: ❑ Approved ❑ Not Approved Revision 3: ❑ Approved ❑ Not Approved Building Permit Submittal Original Submittal Date: '4 12© 1 2623 Site Plans: # 3 Building Plans: # 3 Building Permit#: Enter building permit#above. Workflow Routing: [Y Planning ' Permit Coordinator B'Building Workflow Sign-off: [Sign-off for Planning(include notes from planning review) Route Application Documents: Building: original permit application, site plans,building plans,engineer and beam calculations and trust details,if applicable, etc. Notes: By Permit Technician: .Ah V' liy- Date: g l tib I1,0 ti3 1:\Building\Forms\B1dgPennitRvw_COM_NoLandUse 09072022.docx :,I lineering Review ❑ Slo,e at building pad: ❑ PFI P- •t#: ❑ Conditions "Met"prior to issuance of permit ❑ Easements (en .achments) per engineering conditions of approval and plat (not .•.ical on SDR/CUP) ❑ Water Quality/Qua ' Facility: Assess Water Quality -e in-lieu: ❑ Yes ❑ No Assess Water Quantity Fee •*-lieu: ❑ Yes ❑ No LIDA Facility on lot: ❑ Yes ❑ A,o Add Fee: ❑ Yes ❑ No ❑ NOT Approved by Engineering: Date Notes: Approved by Engineer'• :: Date: Revisions (after 5 tiding Submittal only) Reviewe• Date Revisio 8 : ❑ Approved ❑ Not Approved ' : .sion 2: ❑ Approved ❑ Not Approved Revision 3: ❑ Approved ❑ Not Approved 4e . it Coordinator Review Conditions "Met"prior to issuance of permit ❑ Approved,NOT Released: Date: ❑ ENG Revisions Required: Date: Notes: 11. SDC Exemption ❑ Applied for ❑ Received ❑ Does not apply ``\ 7.� ees Entered: Wash Co Trans Dev Tax: ❑ Yes ❑ N/A ❑ Deferred Tigard Trans SDC: ❑ Yes ❑ N/A ❑ Deferred Parks SDC: ❑ Yes N/A ❑ Deferred LIDA Fee: ❑ Yes /A 4 t 1 -1 OK to Issue/Approved by Permit Coordinator: ' �� �� Date: L-, - Revisions (after Building Submittal only) Reviewer Date Revision 1: ❑ Approved ❑ Not Approved Revision 2: ❑ Approved ❑ Not Approved Revision 3: ❑ Approved ❑ Not Approved I:\Building\Forms\BldgPermitRvw_COM NoLandUse_08162022.docx