Loading...
Permit (7) CITY OF TIGARD MECHANICAL PERMIT COMMUNITY DEVELOPMENT Permit#: MEC2023-00105 Tic;Al'F) 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Date Issued: 5/2/2023 Parcel: 1 S136CD02200 Jurisdiction: Tigard Site address: 7850 SW DARTMOUTH ST Project: Costco T Subdivision: PALMER ACRES Lot: 3 Project Description: New RTU and associated ductwork for Tire Center. Contractor: KEY MECHANICAL CO OF WASHINGTON Owner: COSTCO WHOLESALE CORPORATION 19430 68TH AVE SO PROPERTY TAX DEPT 111 KENT,WA 98032 999 LAKE DR ISSAQUAH, WA 98027 PHONE: 503-231-0731 PHONE: FAX: 503-236-5848 FEES Specifics: Description Date Amount Type of Use: COM Permit Fee 03/10/2023 $474.71 Class of Work: ALT Type of Const: IIB Plan Review 03/10/2023 $118.68 Occupancy Grp: M Occupancy Load: 12%State Surcharge-Mechanical 03/10/2023 $56.97 Stories: 1 Info Process/Archiving-Lg$2.00(over 03/10/2023 $8.00 11x17) Project Valuation: $15,000.00 Info Process/Archiving-Sm$0.50(up to 03/10/2023 $5.00 Fuel 11x17) Air Handlers Fuel Types: Electricity Units<10000 cfm: Gas Pressure: Units>10000 cfm: Furnaces Boilers&Compressors Furnaces<100K BTU: 0-3 HP: Furnaces>=100K BTU: 3-15 HP: Floor Furnaces: 15-30 HP: Unit Heaters: 30-50 HP: Vents w/o Appliances: 50 or Greater HP: Air Conditioning: Heat Pump: Appliances Vent Fans: Vent Systems: Total $663.36 Hoods: Comm Incinerators: Woodstoves: Gas Fireplaces: Required Items and Reports(Conditions) Clothes Dryers: Other Mech Units: Gas Outlets: Other Desc: Duct Work: 10 Fire/Smoke Dampers: This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR 952-001-0010 through OAR 952-001-0090. You may obtain a,,copy of the rules Issued By: J /' Permittee Signature: 1/ --)" Titt Call 503.639.4175 by 7:00 a.m.for the next available inspection date. This permit card shall be kept in a conspicuous place on the job site until completion of the project Approved plans are required on the job site at the time of each inspection. RECEIVED Mechanical Permit Application City of Tigard FEB 2 1 2023 Received Pe . • Date/By: C� I a "� — D O f��13125 SW Hall Blvd.,Tigard,OR 97223 Plan Review ^ �}/ Y I 11 Phone: 503.718.2439 Fax: 503.598.E OF TIGARD 3- 8-. II Other Permit: Date/By: VV L _ TIGARD Inspection Line: 503.639.4175 BUILDING DIVISION DateReadyBy: Juris: ® See Pa e2for --Internet: www.tigard-or.gov Notified/Method: 3 7 g J Suppl mental Information, r - . ,,St.'. $�TYPE� OF:WORK * SC' HEDTFLE a USE CIHE KI iST Mechanical permit fees*are based on the value of the work ❑New construction ®Addition/alteration/replacement performed.Indicate the value(rounded to the nearest dollar)of all ❑Demolition ❑Other: mechanical materials,equipment,labor,overhead,and profit. 0.00 CATEGORY:OF CONSTRUCTION ENTIALValue $ 15,00 , �_. >, :. r 3RESID :EQU1PMt ENT rSYSTII*1S FEE y ❑ 1-and 2-family dwelling ®Commercial/industrial ❑Accessory building For special information use checklist. ❑Multi-family ❑Master builder 0 Other: Description Qty. Fa. Total _. :;JOB SITE INFORM TION AND.LOCATION Heating/cooling: � Air conditioning 46.75 Job site address:7850 SW Dartmouth Street Furnace 100,000 BTU(ducts/vents) 46.75 City/State/ZIP:Tigard, OR 97223 Fumace 100,000+BTU(ducts/vents) 54.91 Suite/bldg./apt.no.: Project narrA Ti re—G;;„, ,^,� Heat pump 61.06 �5�z- Duct work 23.32 Cross street/directions to job site: Hydronic hot water system 23.32 Residential boiler(radiator or hydronic) 23.32 Unit heaters(fuel-type,not electric), in-wall,in-duct,suspended,etc. 46.75 Flue/vent for any of above 23.32 Subdivision: Lot no.: Other: 23.32 Other fuel appliances: Tax map/parcel no.: Water heater 23.32 p;, , DESCRIPTION OF WORK. `, Gas fireplace/insert 33.39 Flue vent for water heater or gas Install new rooftop HVAC unit for tire centerand fireplace 23.32 associated ductwork. Log lighter(gas) 23.32 Wood/pellet stove 33.39 Wood fireplace/insert 23.32 Chimney/liner/flue/vent 23.32 N Other: 23.32 ,. ❑ ROPERTYOWNR XTENT" Environmental exhaust and ventilation: Name:Costco Wholesale Range hood/other kitchen 999 Lake Drive equipment 33.39 Address: Clothes dryer exhaust 33.39 City/State/ZIP:Issaquah, WA 98027 Single-duct exhaust(bathrooms, toilet compartments,utility rooms) 23.32 Phone:( ) Fax:( ) Attic/crawlspace fans 23.32 0 APPLICANT Other: 23.32 � CON1` CT PARSON Business name:Key Mechanical Fuel piping: $14.15 for first four;$4.03 for each additional Contact name: Mackenzie Af d e m Fumace,etc. Address:19430 68th Avenue South Gas heat pump Wall/suspended/unit heater City/State/ZIP: Kent, WA 98032 Water heater Phone:(206)507-6886 Fax::( ) Fireplace Range E-mail: mafdem@keymechanical.com Barbecue CONTRACTOR Clothes dryer(gas) Business name: Key Mechanical Other: 1 ECHANICe>sLPERIYIITnP,i, Address:19430 68th Avenue South Subtotal City/State/ZIP: Kent, WA 98032 Minimum permit fee($90.00) Plan review(25%of permit fee) Phone:(253)872-7392 Fax:( ) State surcharge(12%of permit fee) CCB lic.:93479 TOTAL PERMIT FEE This permit application expires if a permit is not obtained within 180 l i� r'r 4.I '(� /` days after it has been accepted as complete. Authorized signature:( 71( / NIA / (/�y t / * Fee methodology set by Tri-County Building Industry Service Board t \vvJ Print name: i ' �' �; i ��— Date: � y /� I:\Building\Permits\MEC PermitApp_040113.doc 440-4617T(11 2/COM71EB) . " 71 City of Tigard COMMUNITY DEVELOPMENT DEPARTMENT T I G A R D Building Permit Review — Commercial - No Land Use Building Permit #: / E C , --d d.-72 —0 0 I 0 5 Site Address: -7 850 SW Dar-NrvtoJ S'j— Suite/Bldg#: Project Name: CO Si-CO (Name of commercial business occupying the space. If vacant,enter Spec Space.) Planning Review 11 Proposal: 106 rodf-0 p l(`q G ut i CO\ 1 u aT' . V� �1 . 1S 11 QvfC,. Existing Business Activity: Zol�o:�S0I-e'S ' Proposed Business Activity: o l L. Sod-es Verify site address/suite# exists and active in permit sysste2. • errace ' hood: ❑ Yes L�YNo Zoning: C — E4/1" tted Use: Lvf Yes ❑ No ❑ Spec Space D CConfirm no land use required. R' Business License:,,,_, // Exists: LPYes ❑ No,applicant was provided a business license application Notes: Scree\ peel) rr,.G�. Approved by Planning: j nil 6 i n n,\S Date: i I -Z 7 '—z,S Revisions (after Building Submittal only) Reviewer Date Revision 1: ❑ Approved ❑ Not Approved Revision 2: ❑ Approved ❑ Not Approved Revision 3: ❑ Approved ❑ Not Approved Building Permit Submittal Original Submittal Date: a /2 1 />' Site Plans: # Building Plans: # Building Permit#: Enter buildingpermit#above. Workflow Routing: Xi Planning la Permit Coordinator k1 Building Workflow Sign-off: Ig, Sign-off for Planning(include notes from planning review) Route Application Documents: IKI Building: original permit application, site plans,building plans, engineer and beam calculations and trust details,if applicable, etc. Notes: By Permit Technician: Date: D'( 47 I:\Building\Forms\B1dgPermitRvw_COM_NoLandUse 09072022.docx Permit Coordinator Review C=.�onditions "Met"prior to issuance of permit ❑ Approve1:15-.JOT Released: Date: ❑ ENG Revisions'R 9uired: Date: Notes: ❑ SDC Exemption ❑ App i . for ❑ Received ❑ Does not apply ❑ Fees Entered: Wash Co T Dev Tax: ❑ Yes ❑ N/A ❑ Deferred Tigar. 'rans SD : ❑ Yes ❑ N/A ❑ Deferred s SDC: ❑ Yes ❑ N/A ❑ Deferred LIDA Fee: ■ Yes ❑ N/A ❑ OK to Is -/Approved by Permit Coordinator: Date: Re ' '•ns (after Building Submittal only) ` -viewer Date Revision 1: ❑ Approved ❑ Not Approved Revision 2: ❑ Approved ❑ Not Approved Revision 3: ❑ Approved ❑ Not Approved I:\Building\Forms\BldgPennitRvw_COM NoLandUse_08162022.docx