Loading...
Report (2) City of Tigard " Deferral Until Occupancy Request iGoii Washington County Transportation Development Tax (l`DT),Transportation and Parks System Development Charges (SDCs) This form is to be signed and submitted prior building permit issuance or,if no building permit is required,then upon land use approval (TMC 3.24, as amended by Ordinance No.21-09). Date: 4/10/2023 Site Address: 7872 SW Layton Lane Project Brookside SUB Land Use Case or Name: Building Permit#: MST2023-00071 Tax Lot 2S112CA15100 Total Parks #: Lot 11 Amount*: $11,225.00 TDT N/A- not eligible Total TSDC Amount: 9 Amount*: $8,208.00 *The total TSDC amount shown above is the sum of$7,7R0 00 for TSDC-Improvement,$448.00 for TSDC Reimbursement,and$ N/A for TSDC-River Terrace,if applicable.. *The total Parks SDC amount shown above is the sum of$6,812.00 for Parks-Improvement,$ 1,RR7 00 for Parks- Reimbursement, and either$ 2,526.00 for Parks-Neighborhood or$ N/A for Parks-Neighborhood River Terrace. This constitutes my request to defer payment of the TDT,TSDC, and Parks SDCs, as provided above,to prior to final inspection. Payment of the TDT,TSDC, and Parks SDCs may be deferred until issuance of the occupancy permit. In requesting this option, I understand that any deferred TDT,TSDC,and Parks SDCs must be paid prior to final inspection. TDT may only be deferred if the TDT is greater than the amount for a single-family residence. 1 further understand that the amount of TDT due on deferred obligations shall be the amount in effect at the time of issuance of the building permit. For a deferral request to be accepted both the Property Owner and the Developer must sign this request, Property Owner: t•ftikM 1 Io& LtAavivo9 tivit6 Date: "tlfl I Developer: , f 1 r =c; / �;. Date: Permit Coordinator: '! Date: 4/10/2023