10/02/2019 - PacketTRANSPORTATION ADVISORY COMMITTEE AGENDA City of Tigard | 13125 SW Hall Blvd., Tigard, OR 97223 | 503-639-4171 | www.tigard-or.gov | Page 1 of 1 City of Tigard Transportation Advisory Committee Agenda MEETING DATE/TIME: October 2, 2019 – 6:30 to 8:30 p.m. MEETING LOCATION: Tigard Public Works Auditorium, 8777 SW Burnham St. 1. CALL TO ORDER Kevin 6:30 2. CONSIDER MINUTES Kevin 6:32 3. SWC PROJECT UPDATE TriMet 6:35 4. ACTION: CIP PROJECT PRIORITIZATION Kevin/All 7:05 5. PUBLIC COMMENT Kevin 8:25 6. ADJOURNMENT Kevin 8:30 Supporting materials attached: September 4, 2019 Minutes Upcoming meetings of note: Thursday, September 26, 5:00 p.m., RFFA Grant Public Hearing, Metro, 600 NE Grand Ave, Portland Thursday, October 3, 5:30 p.m., SWC Citizen Advisory Committee Meeting, Tigard Public Works Auditorium Wednesday, November 6, 6:30 p.m., TTAC Meeting, Tigard Public Works Auditorium Tuesday, November 12, 7:30 p.m., TTAC Annual Report to Council, Tigard Town Hall Page 1 of 2 CITY OF TIGARD TIGARD TRANSPORTATION ADVISORY COMMITTEE Meeting Minutes October 2, 2019 Members Present: Carine Arendes (via telephone after item 3), George Brandt, Candi Cornils (Vice Chair), Carl Fisher, Ben Gooley, Ruth Harshfield, Richard Keast (alternate), Holly Koontz (alternate), Lonnie Martinez, Elise Shearer, Joseph Vasicek, Kevin Watkins (Chair), and Lindsey Wise. Members Absent: N/A. Staff Present: Sr. Transportation Planner Dave Roth, Senior Project Engineer Tegan Enloe, and Sr. Administrative Specialist Joe Patton. Others Present: TTAC Council Liaison John Goodhouse TriMet Senior Community Affairs Manager Jennifer Koozer, Jim Essenberg, Ramtin Rahmani, and Sam Copelan. 1. CALL TO ORDER Chair Watkins called the meeting to order at 6:30 pm. The meeting was held in the Public Works Auditorium, at 8777 SW Burnham St. 2. CONSIDER MINUTES The September 4, 2019 meeting Minutes were unanimously approved. 3. SWC PROJECT UPDATE Jennifer Koozer gave an update on the SW Corridor project including the 2040 growth concept, the TriMet rail system, SWC stops, timeline, Tigard specific stations, cost, graphic showing a projected $462 million funding gap, concept scenarios to eliminate the projected funding gap, Barbur refinements, narrow Barbur sample section, Barbur refinement impacts, Barbur refinements technical viability under study, and upcoming meetings. Kenny Asher presented the Tigard centric views regarding the project. The project has changed since Tigard voters approved the ballot measure in 2016. The Mayor and Council are concerned about the best line for Tigard. Many of the Tigard priorities included in the early stages of planning were eliminated to reduce costs for the Bridgeport terminus. A terminus at Bridgeport is supported but is not a Tigard priority. Projects eliminated affecting Tigard include stormwater, parks and sidewalk improvements, Atlanta Street extension, Ash Avenue connection downtown, a Tigard downtown station, pedestrian and bicyclist bridge access over 217, grade separated crossing over Upper Boones Ferry, improvements to Hall Boulevard, downtown parking structure. It is also now being proposed to eliminate traffic lanes on Barbur Boulevard. The concern is whether this is the best project for Tigard. TIGARD TRANSPORTATION ADVISORY COMMITTEE October 2, 2019 Page 2 of 2 4. ACTION: CIP PROJECT PRIORITIZATION Kevin gave a brief presentation. Based on the voting results, he proposed Priority 1 and Priority 2 projects. After discussion, Priority 3 projects were selected. A motion was unanimously approved to select Walnut Street – Complete Streets (Tiedeman to 99W), North Dakota St. – Sidewalk (Gallo to 121st), 121st Ave. – Complete Streets (Walnut to North Dakota), Bull Mountain Rd. – Pedestrian Crossing (Elizabeth Price Park & Alberta Rider Elementary School), Fanno Creek Trail – Completion (Bonita to Tualatin River), and Tigard Triangle/72nd Ave. – Improvements (Placeholder) as Priority 1 projects; Tigard Street Heritage Trail – Completion (Greenberg to Fanno Creek Trail), 121st Ave. – Pedestrian Bridge (Summer Creek), Fanno Creek Trail – Crossing Improvement (Scholls Ferry Rd.), Grant St. Sidewalk & Fanno Creek Path – Crossing Improvement, and Bull Mountain Rd. – Complete Streets (99W to Benchview Terrace) as Priority 2 projects; Hall Boulevard – Improvements (Placeholder), 100th Ave. – Sidewalk (McDonald to Kable), 78th Ave. – Sidewalk (Pfaffle to Spruce), Sattler St. – Sidewalk (96th to 100th), 103rd Ave. – Sidewalk (McDonald to View Terrace), and Hunziker St. – Sidewalk (72nd to 77th) as Priority 3 projects and to authorize the Chair to transmit the TTAC CIP prioritization to the City. 5. PUBLIC COMMENT A. Sam Copelan advocated for completing sidewalk gaps on Watkins in the Derry Dell neighborhood. B. Ramtin Rahmani advocated for adding marked crosswalks on 121st Ave at Howard and at Fonner. He also suggested the city petition ODOT to reduce the speed limit along 121st Ave. 6. NON-AGENDA ITEMS A. Dave noted that Council approved the new TTAC Bylaws. He also spoke with interested Pedestrian Bicyclist Subcommittee (PBS) members regarding integration into TTAC and encouraged them to apply for TTAC openings. B. The Annual Report to Council is on Tuesday, November 12. Kevin and Dave will work on the report and any input should be sent to Kevin as the report needs to be submitted before the November 6 meeting. 7. ADJOURNMENT The meeting adjourned at 8:50 p.m. Joe Patton, TTAC Meeting Secretary Kevin Watkins, Chair Tigard Transportation Advisory Committee October 2, 2019 2040 Growth Concept 2 3 SW Corridor Light Rail 4 SW Corridor Light Rail 5 •Expands the reach of existing MAX system •30-minute congestion-proof trip between Bridgeport and Portland •Serves a two-way commute •Connects to education (PCC, OHSU, more) •Includes bike and walk infrastructure SW Corridor Light Rail 6 Tigard stations Bridgeport Upper Boones Bonita Hall Elmhurst 68th Ave Scope target $2.375 b Cost estimates (billions) $0 $1 $2 $3 $4 DEIS Scenarios (2017) Initial Route Proposal (Spring 2018) LPA with modifications (Late 2018) Pre-FEIS (Mid-2019)2.375Scope $2.84 bScope $2.73 bScope $2.375 bFinance costs Scope Gap $462m 8 9 Concept Scenarios for $400m gap Note: Concept scenarios developed for discussion purposes. Details regarding funding and scope vary by option. Narrow Barbur •Lower impact design with reduced cross section •Remove one auto lane in areas where technically viable What are Barbur Refinements? 10 Hybrid --combination of: •Narrow Barbur •Light rail between Barbur and I-5 Narrow Barbur –sample section Relocations: fewer than current design What are Barbur Refinements? Ridership: same as current design Barbur Refinements: technical viability under study Traffic •Person throughput •Motor vehicle capacity •Diversion •Level of service at key intersections •Queuing at I-5 ramp terminals Jurisdictional Transfer: PBOT expectations Station areas: quality; development opportunity 14 Steering Committee: Nov 4, 6 p.m. Library CAC Nov 7, 5:30 p.m. Public Works Auditorium Steering Committee Nov 18, 9 a.m. City Hall www.trimet.org/swcorridor swcorridor@trimet.org 503.962.2150 Questions and Comments TTAC Meeting October 2, 2019 Review Process (“Uber List”→Qualified List →Capital Improvement Plan) Review Category Definitions Proposed “Voting Ave.” Rank Proposed CIP Projects Discussion Priority 1 –Highest priority for completion within 6-year planning timeframe. Acquire and allocate resources (e.g., staffing, funding) to complete projects within 6-years. Priority 2 –Take cost-effective and reasonable steps to complete projects using resources not allocated to P1. Priority 3 –Take cost-effective and reasonable steps to complete projects using resources not allocated to P2. Priority 1 6.45 < value < 7.64 Priority 2 8.64 < value < 9.64 Priority 3 TBD Walnut Street -Complete Streets (#10) Ped. Crossing Improvement/Bull Mtn. (#11) 121st Ave. -Complete Streets (#16) Tigard Triangle/72nd Ave. (Placeholder) (#9) Fanno Creek Trail Completion (#21) N. Dakota Sidewalk (Gallo →121st)(#6) Tigard Street Heritage Trail (#5) 121st Ped Bridge @ Summer Creek (#12) FCT crossing @ Scholls Ferry Rd. (#14) Grant St. Sidewalk & FCT crossing (#3) Bull Mtn. Road -Complete Streets (#4) Project Average All Average Voting Average Non-voting 3: Grant Street Sidewalk & Fanno Creek Path Crossing Improvement 9.21 9.55 8.00 4: Bull Mountain Complete Street (99W to Benchview Terrace)9.14 9.64 7.33 5: Tigard Street Trail (From Fanno Creek/North Dakota St along Tiedeman to Tigard Street)8.50 8.64 8.00 6: North Dakota St Sidewalk (Gallo to 121st)8.21 7.64 10.33 7: Hunziker St (72nd to 77th) Sidewalk 11.64 11.27 13.00 8: Atlanta Street Extension (Tigard Triangle)10.86 10.36 12.67 9: Tigard Triangle 72nd Avenue Improvements (Placeholder)7.71 7.27 9.33 10: Walnut Street Improvements (Tiedeman to 99W)5.86 6.45 3.67 11: Ped Crossing Improvement on Bull Mountain Road at Elizabeth Price Park & Alberta Rider 7.93 6.55 13.00 12: 121st Ave Pedestrian Bridge at Summercreek 9.43 9.18 10.33 13: 116th Ave (Tigard to Katherine) Trail & Bridge 10.14 10.55 8.67 14: Fanno Creek Trail at Scholls Ferry Road Crossing Improvement 8.43 9.18 5.67 15: Hall Boulevard Improvements (Placeholder)9.86 10.09 9.00 16: 121st Ave (Walnut to North Dakota) Complete Street 7.14 6.55 9.33 17: Hall/Hunziker/Scoffins Intersection Realignment 11.36 11.55 10.67 18: Scoffins (Hall to Ash) Sidewalk 12.43 12.55 12.00 19: 78th Ave Sidewalk (Pfaffle to Spruce)10.71 10.55 11.33 20: 72nd Ave Complete Street with Sidewalks & Bike Lanes (217 Interchange to Durham)10.71 10.91 10.00 21: Fanno Creek Trail Completion from Bonita to Tualatin River 7.07 7.55 5.33 22: 68th Ave/Atlanta/Haines Intersection & Traffic Signal 12.14 11.91 13.00 23: 103rd Ave Sidewalk (McDonald to View Terrace)11.21 10.73 13.00 24: Sattler Sidewalk Gap Completion (96th to 100th)10.71 10.82 10.33 25: 100th Ave sidewalks from McDonald to Kable 11.93 12.18 11.00 26: Westside Regional Trail (Barrows to Bull Mtn)11.64 12.36 9.00 2019 TTAC Qualified List Survey Results September 2019 1 Project Average All Average Voting Average Non-voting 10: Walnut Street Improvements (Tiedeman to 99W)5.86 6.45 3.67 21: Fanno Creek Trail Completion from Bonita to Tualatin River 7.07 7.55 5.33 16: 121st Ave (Walnut to North Dakota) Complete Street 7.14 6.55 9.33 9: Tigard Triangle 72nd Avenue Improvements (Placeholder)7.71 7.27 9.33 11: Ped Crossing Improvement on Bull Mountain Road at Elizabeth Price Park & Alberta Rider 7.93 6.55 13.00 6: North Dakota St Sidewalk (Gallo to 121st)8.21 7.64 10.33 14: Fanno Creek Trail at Scholls Ferry Road Crossing Improvement 8.43 9.18 5.67 5: Tigard Street Trail (From Fanno Creek/North Dakota St along Tiedeman to Tigard Street)8.50 8.64 8.00 4: Bull Mountain Complete Street (99W to Benchview Terrace)9.14 9.64 7.33 3: Grant Street Sidewalk & Fanno Creek Path Crossing Improvement 9.21 9.55 8.00 12: 121st Ave Pedestrian Bridge at Summercreek 9.43 9.18 10.33 15: Hall Boulevard Improvements (Placeholder)9.86 10.09 9.00 13: 116th Ave (Tigard to Katherine) Trail & Bridge 10.14 10.55 8.67 19: 78th Ave Sidewalk (Pfaffle to Spruce)10.71 10.55 11.33 20: 72nd Ave Complete Street with Sidewalks & Bike Lanes (217 Interchange to Durham)10.71 10.91 10.00 24: Sattler Sidewalk Gap Completion (96th to 100th)10.71 10.82 10.33 8: Atlanta Street Extension (Tigard Triangle)10.86 10.36 12.67 23: 103rd Ave Sidewalk (McDonald to View Terrace)11.21 10.73 13.00 17: Hall/Hunziker/Scoffins Intersection Realignment 11.36 11.55 10.67 7: Hunziker St (72nd to 77th) Sidewalk 11.64 11.27 13.00 26: Westside Regional Trail (Barrows to Bull Mtn)11.64 12.36 9.00 25: 100th Ave sidewalks from McDonald to Kable 11.93 12.18 11.00 22: 68th Ave/Atlanta/Haines Intersection & Traffic Signal 12.14 11.91 13.00 18: Scoffins (Hall to Ash) Sidewalk 12.43 12.55 12.00 2019 TTAC Qualified List Survey Results September 2019 2 Project Average All Average Voting Average Non-voting 10: Walnut Street Improvements (Tiedeman to 99W)5.86 6.45 3.67 11: Ped Crossing Improvement on Bull Mountain Road at Elizabeth Price Park & Alberta Rider 7.93 6.55 13.00 16: 121st Ave (Walnut to North Dakota) Complete Street 7.14 6.55 9.33 9: Tigard Triangle 72nd Avenue Improvements (Placeholder)7.71 7.27 9.33 21: Fanno Creek Trail Completion from Bonita to Tualatin River 7.07 7.55 5.33 6: North Dakota St Sidewalk (Gallo to 121st)8.21 7.64 10.33 5: Tigard Street Trail (From Fanno Creek/North Dakota St along Tiedeman to Tigard Street)8.50 8.64 8.00 12: 121st Ave Pedestrian Bridge at Summercreek 9.43 9.18 10.33 14: Fanno Creek Trail at Scholls Ferry Road Crossing Improvement 8.43 9.18 5.67 3: Grant Street Sidewalk & Fanno Creek Path Crossing Improvement 9.21 9.55 8.00 4: Bull Mountain Complete Street (99W to Benchview Terrace)9.14 9.64 7.33 15: Hall Boulevard Improvements (Placeholder)9.86 10.09 9.00 8: Atlanta Street Extension (Tigard Triangle)10.86 10.36 12.67 13: 116th Ave (Tigard to Katherine) Trail & Bridge 10.14 10.55 8.67 19: 78th Ave Sidewalk (Pfaffle to Spruce)10.71 10.55 11.33 23: 103rd Ave Sidewalk (McDonald to View Terrace)11.21 10.73 13.00 24: Sattler Sidewalk Gap Completion (96th to 100th)10.71 10.82 10.33 20: 72nd Ave Complete Street with Sidewalks & Bike Lanes (217 Interchange to Durham)10.71 10.91 10.00 7: Hunziker St (72nd to 77th) Sidewalk 11.64 11.27 13.00 17: Hall/Hunziker/Scoffins Intersection Realignment 11.36 11.55 10.67 22: 68th Ave/Atlanta/Haines Intersection & Traffic Signal 12.14 11.91 13.00 25: 100th Ave sidewalks from McDonald to Kable 11.93 12.18 11.00 26: Westside Regional Trail (Barrows to Bull Mtn)11.64 12.36 9.00 18: Scoffins (Hall to Ash) Sidewalk 12.43 12.55 12.00 2019 TTAC Qualified List Survey Results September 2019 3 Project Average All Average Voting Average Non-voting 10: Walnut Street Improvements (Tiedeman to 99W)5.86 6.45 3.67 21: Fanno Creek Trail Completion from Bonita to Tualatin River 7.07 7.55 5.33 14: Fanno Creek Trail at Scholls Ferry Road Crossing Improvement 8.43 9.18 5.67 4: Bull Mountain Complete Street (99W to Benchview Terrace)9.14 9.64 7.33 3: Grant Street Sidewalk & Fanno Creek Path Crossing Improvement 9.21 9.55 8.00 5: Tigard Street Trail (From Fanno Creek/North Dakota St along Tiedeman to Tigard Street)8.50 8.64 8.00 13: 116th Ave (Tigard to Katherine) Trail & Bridge 10.14 10.55 8.67 15: Hall Boulevard Improvements (Placeholder)9.86 10.09 9.00 26: Westside Regional Trail (Barrows to Bull Mtn)11.64 12.36 9.00 9: Tigard Triangle 72nd Avenue Improvements (Placeholder)7.71 7.27 9.33 16: 121st Ave (Walnut to North Dakota) Complete Street 7.14 6.55 9.33 20: 72nd Ave Complete Street with Sidewalks & Bike Lanes (217 Interchange to Durham)10.71 10.91 10.00 6: North Dakota St Sidewalk (Gallo to 121st)8.21 7.64 10.33 12: 121st Ave Pedestrian Bridge at Summercreek 9.43 9.18 10.33 24: Sattler Sidewalk Gap Completion (96th to 100th)10.71 10.82 10.33 17: Hall/Hunziker/Scoffins Intersection Realignment 11.36 11.55 10.67 25: 100th Ave sidewalks from McDonald to Kable 11.93 12.18 11.00 19: 78th Ave Sidewalk (Pfaffle to Spruce)10.71 10.55 11.33 18: Scoffins (Hall to Ash) Sidewalk 12.43 12.55 12.00 8: Atlanta Street Extension (Tigard Triangle)10.86 10.36 12.67 7: Hunziker St (72nd to 77th) Sidewalk 11.64 11.27 13.00 11: Ped Crossing Improvement on Bull Mountain Road at Elizabeth Price Park & Alberta Rider 7.93 6.55 13.00 22: 68th Ave/Atlanta/Haines Intersection & Traffic Signal 12.14 11.91 13.00 23: 103rd Ave Sidewalk (McDonald to View Terrace)11.21 10.73 13.00 2019 TTAC Qualified List Survey Results September 2019 4