Loading...
Permit Support Document (11) FOR OFFICE USE ONLY—SITE ADDRESS: This form is recognized by most building departments in the Tri-County area for transmitting information. Please complete this form when submitting information for plan review responses and revisions. This form and the information it provides helps the review process and response to your project. City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT 111 Transmittal Letter TIGARD 13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503.718.2439 • www.tigard-or.gov TO: JOSEPH BAILEY DATE RECEIVED: DEPT: BUILDING DIVISION RECEIVED FROM: DINO VAJRACA AUG 14 2023 COMPANY: DEWBERRY ARCHITECTS INC. CRY OF TIGARD PHONE: 916-239-7261 BUILDING DIVISION-Y. EMAIL: DVAJRACA@DEWBERRY.COM RE: 9355 SW WASHINGTON SQUARE RD SPACE T19 BUP2023-00080 (Site Address) (Permit Number) YETI @ WASHINGTON SQUARE (Project name or subdivision name and lot number) ATTACHED ARE THE FOLLOWING ITEMS: Copies: Description: Copies: Description: 5 Additional set(s)of plans. 5 Revisions: 1 5 Cross section(s) and details. 0 Wall bracing and/or lateral analysis. 0 Floor/roof framing. 0 Basement and retaining walls. 0 Beam calculations. 0 Engineer's calculations. 0 Other(explain): REMARKS: REVISION LETTER ATTACHED FOR ARCHITECTURAL, STRUCTURAL AND EL- 1 FOR OFFICE USE ONLY R d to Permit Technician: Date: ' ' Initials Fees Due: Yes ❑No Fee Description: Amount ue: Q.� Hr lt.A fc,�; $ 'ems Special --->-N Instructions: Reprint Permit(per PE): ❑ Yes No ❑ Done Applicant Notified: _10-, Date: "�� � Initials: City of Tigard IN _ COMMUNITY DEVF7 OPMENT DEPARTMENT Building Permit Review — Commercial - No Land Use TIGARD Building Permit #: (kr D-023 — 0 la° 60 " Site Address: g3Sc Sly S iltuA drfe 94. Suite/Bldg#: To Project Name: \1•.. 1\ (Name of commercial business occupying the space. If vacant,enter Spec Space.) Planning Review. OW `` l I Proposal: \J*ev1oc Z\ Existing Business Activity: S01tZ5 -on `'e taiI Proposed Business Activity: Verify site address/suite# exists and active in permit system. /LJ`River Terrace Neighborhood: 0 Yes a No ,0-Zoning: MU G ,1Zi Permitted Use: 21 Yes D No 0 Spec Space ,Confirm no land use required. _ Business License: PIN , COfl j('d `'d Exists: 0 Yes No,applicant was provided a business license application Notes: Sveic h9_la, sfeu no' We i ' (ino -tb sys're, Sate, No (: FzS v.-0\0 • Approved by Planning: ..? Date: 4 123 Revisions (after Bit' ing Submittal only) fM1,S11 Gj Reviewer Date Revision 1: Approved 0 Not Approved V/1 7 1 Z' Revision 2: 0 Approved 0 Not Approved Revision 3: 0 Approved 0 Not Approved Building Permit Submittal Original Submittal Date: &A 43-5 Site Plans: # 3 Building Plans: # 3 Building Permit#: Lki Enter building permit#above. Workflow Routing: i1 Planning op Permit Coordinator cti Building Workflow Sign-off: AI Sign-off for Planning(include notes from planning review) Route Application Documents: 154 Building: original permit application,site plans,building plans,engineer and beam calculations and trust details,if applicable,etc. Notes: By Permit Technician: (vl Date: ( ai cv. 1- KI 4/013 I:\Building\Forms\BIdgPermitRvw_COM_NolandUse_09072022.docx Engineering Review ❑ Slope at building pad: ❑ PFI Permit#: ❑ Conditions "Met"prior to issuance of permit ❑ Easements (encroachments) per engineering conditio- of approval and plat(not typical on SDR/CUP) ❑ Water Quality/Quantity Facility: Assess Water Quality Fee in-lieu: I. Yes 0 No Assess Water Quantity Fee in-lieu: 0 Yes 0 No LIDA Facility on lot: 0 Yes 0 No Add Fee: ❑ Yes 0 No ❑ NOT Approved by E. . neering: Date Notes: Approved by ngineering: Date: Revision: after Building Submittal only) Reviewer Date R- ion 1: 0 Approved 0 Not Approved 'evision 2: ❑ Approved ❑ Not Approved Revision 3: 0 Approved 0 Not Approved Permit Coordinator Review VA Conditions "Met"prior to issuance of permit ❑ Approved,NOT Released: Date: ❑ ENG Revisions Required: Date: Notes: ,E SDC Exemption 0 Applied for 0 Received Does not apply f2(Fees Entered: Wash Co Trans Dev Tax: 0 Yes N/A 0 Deferred Tigard Trans SDC: 0 Yes 7 N/A 0 Deferred Parks SDC: ❑ Yes ? N/A ❑ Deferred LIDA Fee: 0 Yes gr N/A CtsMC d Sh"toPl" ry �OK to Issue/Approved by Permit Coordinator: Date: G 1 1,14 1702,3 Revisions (after Building Submittal only) Reviewer Date Revision 1: 0 Approved ❑ Not Approved Revision 2: 0 Approved 0 Not Approved Revision 3: 0 Approved 0 Not Approved • L\Building\Forms\BIdgPennitRvw_COM_NolandUse_08162022.docx S.M i Dewberry RECEIVED AUG i 4 2023 08/02/23 CITY OF TIGARD 3LHLDING DIVISION REV1 (FOR CONSTRUCTION SET)WILL ADDRESS DESIGN CHANGES FOR YETI-WSQ FOR ARCHITECTURE, STRUCTURAL AND ELECTRICAL. ARCHITECTURAL UPDATES: COVER SHEET • UPDATED ISSUE TITLE AND DATE. G-001 • REVISED SHEET INDEX. AD-100-DEMO PLAN • UPDATED BOH WALL PHASE TO BE EXISTING TO REMAIN • DEMO TAN FLOOR AT ENTRY AND INSTALL NEW BLACK TILE, PROCURED FROM LL AD-101 - DEMO RCP • REVISED KEYNOTE #7 • ADDED KEYNOTE #9 • DEMOED EXISTING ACCESS PANEL AT STOREFRONT A-111 -ANNOTATION PLAN • REMOVED DUPLICATE STOREFRONT SECTION • ADDED KEYNOTE #9 • UPDATED STOREFRONT DIMENSIONS • IN-FILLED THE EXISTING OPENING • UPDATED FRAMING DIMENSIONS TO ACCOMMODATE YETI 1.0 FIXTURES • UPDATED WALL TO REMAIN THAT SEPARATES EMPLOYEE AREA FROM IT ROOM, UPDATED FRAMING FOR WALL SEPARATING IT ROOM AND EMPLOYEE ROOM. A-112- FINISH PLAN • UPDATED STOREFRONT DOOR TRACK • REMOVED KEYNOTE #7. • UPDATED FINISH SCHEDULE TO REMOVE MTL-2. WILL BE REPLACED BY VINYL. GC COORDINATING WITH VENDOR. • DEMOD STOREFRONT ENTRANCE TAN INTERIOR TILES AND REPLACED THEM WITH BLACK MALL TILE A-113- REFLECTED CEILING PLAN • REMOVED DUPLICATE STOREFRONT SECTION (1 IA-502) • ADDED KEYNOTE #15 • RELOCATED EXISTING BOH LINEAR LIGHT Page 1 of 3 YETI- CITY OF SAN JOSE 03/10/2023 A-114- EQUIPMENT PLAN • PROVIDED POWER FOR THE GRAPHIC LIGHTBOX ON THE INTERIOR SIDE OF THE STORE ABOVE THE WALL FIXTURE. • ADDED OUTLETS HEIGHTS FOR THE MEDIA WALL MATRIX • ADDED DIMENSION FOR THE WINDOW DISPLAY FLOOR BOX LOCATION • UPDATED WALL FIXTURE MODELS AND FRAMING BASED ON Q20 CLEARANCE REQUIREMENTS • ADDE NEW POWER TO THE EXTERIOR LIGHTBOX (2-J-BOXES @ 11') A-200 • REVISED KEYNOTE #2. • ADDED DIMENSIONS FOR STOREFRONT MULLION SPACING. GRAPHIC VENDOR TO VERIFY IN FIELD A-201 • UPDATED BOTTLE FILLER ELEVATION BASED ON DETAIL CHANGES, SEE A-403 • ADDED OUTLET DIMS AND HEIGHT FOR THE MEDIA WALL MATRIX • ADDED CALL OUT FOR HANGING LIGHTBOX, SEE STRUCTURAL DRAWINGS FOR ATTACHMENT. A-203 • REVISED DOOR#7 LOCATION A-402 • UPDATED ENLARGED DETAILS • REVISED METAL BASE DETAIL A-403 • UPDATED BOTTLE FILLER ENLARGED PLAN AND SECTION, REVISING FRAMING FOR COOLER SUPPORT. A-404 • UPDATED MEDIA WALL ENLARGED PLAN, SECTION, AND ELEVATION. A-500 • UPDATED ENLARGED PLANS DETAILS. A-501 • UPDATED SECTION DETAILS. A-502 • UPDATED SECTION DETAILS. • REMOVED DUPLICATED SECTION. A-503 • UPDATED SECTION DETAILS. Dewberry Page 2 of 3 YETI -CITY OF SAN JOSE 03/10/2023 A-504 • UPDATED SECTION DETAILS. • ADDED J-BOX @ 11' LOW-VOLTAGE/AUDIO VISUAL (FOR REFERENCE ONLY): REF-001 -LOW-VOLTAGE, FOR REFERENCE ONLY • UPDATED CAMERA DROP AND WAP LOCATIONS TO RE-USE EXISTING PENDANT DROPS • UPDATED CABLE TRAY RUN • SEE DEMO RCP FOR EXISTING LV PENDANTS THAT CAN BE DEMO'D STRUCTURAL UPDATES: S3.1 SECTIONS & DETAILS • UPDATED SECTION 4- HANGING LIGHT BOX DETAIL FOR FIXTURE VENDOR ATTACHMENT • UPDATED SECTION 1 AND 3 - FOR STRUCTURAL REINFORCING FOR HANGING ROLLING-GATE S3.2 SECTIONS & DETAILS • UPDATED SECTION 4 HANGER ATTACHMENT TO CFS JOIST ELECTRICAL UPDATES: E-201 ELECTRICAL POWER PLAN • BASECAMP - REDUCED POWER AND DATA DROPS TO REFLECT SCREEN SPEC BY MANUF. • DRINKWARE WALL (PLAN WEST)- REMOVED POWER ALONG WALL, NOT REQUIRED FOR FIXTURE CONCEPT • MALL CONCOURSE ILLUMINATED GRAPHIC-ADDED (2)JBOXES FOR HARDWIRING OF GRPAHIC BOX • POS TABLE - NO FLOOR TRENCHING SCOPE, CONDUIT FOR POWER AND DATA WILL BE RUN ALONG OR WITHIN COUMN CAVITY AND BROUGHT LATERALLY ACROSS VIA ENTRY PORT AND RACEWAY TO UNDERSIDE OF CASHWRAP E-400 ELECTRICAL LOAD SUMMARY • UPDATED BASED ON REVISED RECEPTACLE COUNT E-401 ELECTRICAL PANELBOARD SCHEDULE • REVISED BASED ON POWERPLAN CHANGES E-403 ELECTRICAL LIGHTING SCHEDULE • UPDATED ROOM CONTROL SCHEDULE N - NOT USED Dewberry' Page 3 of 3