HomeMy WebLinkAboutPermit (10) CITY OF TIGARD BUILDING PERMIT
till
I a COMMUNITY DEVELOPMENT Permit#: BUP2023-00079
T r(3,.R I.) 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Date Issued: 6/14/2023
Parcel: 1 S126DC00901
Jurisdiction: Tigard
Site address: 9650 SW GREENBURG RD
Project: Terrace Glen Apartments Subdivision: TERRACE GLEN APARTMENTS Lot: None
Project Description: Install(1)exterior wall mounted sign, non illuminated.
Contractor: VANCOUVER SIGN COMPANY INC Owner: TERRACE GLEN HOUSING PARTNERS LP
2600 NE ANDRESEN RD STE 50 9640 SW GREENBURG RD
VANCOUVER, WA 98661 TIGARD, OR 97223
PHONE: 360-693-4773 PHONE:
FAX: 360-693-2747
Specifics: FEES
Description Date Amount
Type of Use: MF
Class of Work: ALT Type of Const: VA Permit Fee-Additions,Alterations, 06/13/2023 $180.17
Occupancy Grp: U Occupancy Load: 0 Demolition
Dwelling Units: 0 12%State Surcharge-Building 06/13/2023 $21.62
Plan Review 06/06/2023 $117.11
Stories: 0 Height: 0 ft Info Process/Archiving-Sm$0.50(up to 06/13/2023 $2.50
Bedrooms: 0 Bathrooms: 0 11x17)
Value: $6,200
Floor Areas:
Total Area: 0
Accessory Struct: 0
Basement: 0
Carport: 0
Covered Porch: 0
Deck: 0
Garage: 0
Mezzanine: 0
Total $321.40
Required: Required Items and Reports(Conditions)
Fire Sprinkler: Parapet:
Fire Alarm: Protected Corridors:
Smoke Detectors: Manual Pull Stations:
Accessible Parking: 0
This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work
will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more
the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR
952-001-0010 through OAR 952-001-0090. You may obtain a e rules or direct questions to OUNC by calling 503.232.1987 or 1.800.332.2344.
Issued By`%�' Permittee nature: /27.
[
a 03.639.4175 by 7:00 a.m.for the next available inspection date.
This permit card shall be kept in a conspicuous place on the job site until completion of the project.
Approved plans are required on the job site at the time of each Inspection.