Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Permit Support Document (2)
8upz,di1— Ooz11Y q H6! SW WASH/NATDRI SA S@ gus►xe RD ' d J" ROAD E6 F .- SCG FLOOR Pt.RA,i!US, NJ 07652 S A R G F. ii T I 973.253.93s' T 973.253.9390 F ARCH I T E C T 5nacaac'1.cer5 N O V 2 2017 1 • Attn. CITY OFTIGARD October 18, 2017 M City of Tigard Perm it Center BUILDING DIVISION 13125 SW Hall Blvd. Tigard,OR 97223 Tel:503-218-2436 RE:Lids-Store#5665—9461 SW Washington Square Rd.Ste.Al 3 Portland,OR 97223 To Whom This May Concern, Please seethe listof changes we have made below since yaurinitial review of the above - mentioned project. Sheet T1.0: • Revised project address • Revised Drawing Index • Revised ResponsibilitySchedule • Updated Vendor List Sheet D1.0: • Removed columns from plan that are not in field and revised associated notes Sheet A1.0: • Revised cashwrap location • Added note for data ports • Removed columns from plan that are not in field • Revised soffit heights • Removed outlets @ 18"AFF in Sa l es Area dr Sheet A1.1: • Revised column detail • Added column elevations • Revised ceiling height on section Sheet A2.0: • Removed columns from plan that are not in field • Revised angles on fixtures • Added perimeter fixture • Revised counts • Revised Fixture Schedule per plan changes • Sheet A3.0; • Removed columns from plan that are not in field • Revised ceiling and soffit heights and associated notes • Revised soffit at storefront • Revised lighting and Light Fixture Schedule per plan change • Sheet A3.1: • Revised dimensions on the mil I work fixture abovethe cashwrap • Revised ceiling heights r SARGENT' ARCHITECTS Pagel 10/18/2017 SA 461 FROM ROAD SECOND FLOOR PARAMUS, N7 07652 SARGENT ! 973'253.9393 T ARCHITECTS 3 . WWW97 .253.SARGAR9390FCH.COM October 18, 2017 • Added Landlord required notes Sheet A4.0: • Removed columns from plan that are not in field • Removed striped paint on walls • Condensed Sheets A4.0 and A4.1(Finish Schedules and Details)into one sheet • Added Comments to the Finish Schedulefor ACT, Brake Metal and fixture finishes Sheet A4.1: • Condensed with A4.0 sheet Sheet A5.0: • Revised interior elevations to show updated fixtures • Revised to show new ceiling heights per plan changes • Added mirror at storefront Sheet A6.0: • Revised storefront glazing height • Revised reveal location and updated detail4/A6.0 • Revised Enlarged Storefront Entry Pier Detail • Added vinyl signageon glazing • Added required Landlord notes • Revised storefront finish Sheet A7.0: • Revised storefront finish • • Revised heights per plan/elevation changes • Revised soffit condition on sections Sheet A7.1: • Revised storefront finishes • Revised storefront heights per plan/elevation changes • Revised details per soffit conditions Sheet A8.0: • Revised cashwrap size • Revised customization fixture plan/elevations to be2'-10" high Sheet A8.1: • Revised perimeter fixture heights/angles Sheet M1.0: • Revised diffuser location perlightingchange • Revised thermostat note on Thermostat Schedule • Revised ductwork • Revised VAV location M SARGENT! ARCHITECTS Page2 10/18/2017 SA 4 6 1 FROM ROAD SECOND FLOOR PARAMUS, N1 01552 S A R G ENT I 973.253.9343 T ARCHITECTS97s.zs3.93so Fr_.SARGARCH.COM October 18, 2017 Sheet E1.0: a • Revised lightingplan • Revised Light Fixture Schedule per pl a n changes Sheet Ell: • Removed outlets @ 18"AFF in Sales Area Sheet E1.2: • Revised PanleboardScheduleper plan changes Sheet 51.0: • Removed columns from plan that are not in field and updated box column locations Sheet TC1.0: • Revised fixtures on plan • Added notes 6 and 7 Sheet SP1.0: • Updated per lighting changes FA1.0: • Revised plan perfixturechanges If there are any questions please feel free to contact the Senior Project Manager:Wesley L. Short(973)859-9367,orat wshort(a�sargarch.com. M 6 t' Sincerely, C'jC.r ELI U 1 - ROB•" • US,NJ 9T 1c© Robert J. Sargenti, AIA �F �R SARGENT' ARCHITECTS Pa9e3 10/18/2017