Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Permit (20)
CITY OF TIGARD Permit : BUP2023-00099 s BUILDING PERMIT COMMUNITY DEVELOPMENT DatPermit#: 7/25/2023 I t GAR D 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Parcel: 2S110AC00500 Jurisdiction: Tigard Site address: 14745 SW 109TH AVE None Lot: None Project: Timberline Apartments Subdivision: Project Description: Replacing(4)decks,like for like,in the same building. Owner: KA-5 ASSOCIATES LLC Contractor: FINNMARK PROPERTY SERVICES LLC 5335 RD#190 8383 NE SANDY BLVD STE 370 LAKE335SW MEADOWSOSWE OR RD#1 PORTLAND, OR 97220 97035 PHONE: PHONE: 503-475-0668 FAX: FEES Specifics: Description Date Amount Type of Use: MF Class of Work: ALT Type of Const: VB Permit Fee-Additions,Alterations, 07/25/2023 $464.97 Demolition $55.80 Occupancy Load: 0 12%State Surcharge-Building 07/25/2023 Occupancy Grp: R-2 06/26/2023 $302.23 Dwelling Units: 0 Plan Review $123.003 Stories: 0 Height: 0 ft Tenant Improvements in Existing 07/25/2023 Bedrooms: 0 Bathrooms: 0 Development Value: $26,000 Floor Areas: Total Area: 0 Accessory Struct: 0 Basement: 0 Carport: 0 Covered Porch: 0 Deck: 0 Garage: 0 Mezzanine: 0 Total $946.00 Required Items and Reports(Conditions) Required: Fire Sprinkler: Parapet: Fire Alarm: Protected Corridors: Smoke Detectors: Manual Pull Stations: Accessible Parking: 0 This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR 952-001-0010 through R 952-001-00 o ay obtain a copy of the rules or direct questions to OUNC by calling 503.232.1987 or 1.800.332.2344. a�1/�� �p � z ' t Permittee Signature: r Issued By: Call 503.639.4175 by 7:00 a.m.for the next available inspection date. This permit card shall be kept in a conspicuous place on the job site until completion of the project. Approved plans are required on the job site at the time of each inspection. 9 City of'Tigard COMMUNITY DEVELOPMENT DEPARTMENT eIPil Building Permit Review — Commercial - N o Land Use TIGARD Building Permit #: M 1 - oaOaa Site Address: `-1l-k c\i,) kOCUkk•• Suite/Bldg#: Project Name: limkrlitle, > c6 t 'e tS " S`- kela.cedvev, - (Name of commercial business occupying the space. If vacant,enter Spec Space.) Planning Review . Proposal: it\OLC21'1 P. ,(`t11 J dQ,C) 5 , SQI,y Sta • Existing Business Activity: Af 4 Proposed Business Activity: Verify site address/suite# exists and active in permit system. .River Terrace Neighborhood: 0 Yes 4 No ja-Zoning. giS-9 g Permitted Use: -6 Yes ❑ No 0 Spec Space Confirm no land use required. Business License: Exists: 0 Yes 0 No,applicant was provided a business license application Notes: Approved by Planning: Date: ( (9/0 1 2;3 Revisions (after Building Submittal only) Reviewer Date Revision 1: 0 Approved ❑ Not Approved Revision 2: ❑ Approved ❑ Not Approved Revision 3: ❑ Approved 0 Not Approved Building Permit Submittal n� ,n Original Submittal Date: (a( w J1/15 1,3 Site Plans: # Building Plans: # 3 • Building Permit#: ge Enter building permit#above. Workflow Routing: Cr Planning grPermit Coordinator B/Building Workflow Sign-off: f9/Sign-off for Planning(include notes from planning review) Route Application Documents: E'Building: original permit application, site plans,building plans,engineer and /� beam calculations and trust details,if applicable, etc. Notes: %' A By Permit Technician: ,1/I 0. l.ru6, Date: (1('l 11613 I:\Building\Forms\BldgPermitRvw_COM_NoLandUse_091172022.doox Engineering Review ❑ Slope at building pad: ❑ PFI Permit#: 0 Conditions "Met"prior to issuance of permit 0 Easements (encroachments) per engineering conditions of approval and plat(not typical on SDR/CUP) ❑ Water Quality/Quanti Facility Assess Water Qu ty Fee in-lieu: ❑ Yes ❑ No Assess Water Qua tity Fee in-lieu: ❑ Yes 0 No LIDA Facility on 10 : ❑ Yes ❑ No Add Fee: ❑ Yes ❑ No ❑ NOT Approved by E gineering: / Date Notes: Approved by Engineering: Date: Revisions (after Building Submiftal only) Reviewer Date Revision 1: ❑ Approved ''%.❑ Not Approved Revision 2: ❑ Approved 0 Not Approved Revision 3: ❑ Approved q Not Approved Permit Coordinator Review ❑ Conditions "Met"prior to issuance ciif pertnit 0 Approved,NOT Released: • Date: ❑ ENG Revisions Required: Date: Notes: ❑ SDC Exemption ❑ App 'ed for `t ❑ Received 0 Does not apply PP Y ❑ Fees Entered: Wash C. Trans Dev Tax: '�t ❑ Yes ❑ N/A 0 Deferred Tigard rans SDC: © Yes ❑ N/A 0 Deferred Parks lII C: ❑ Yes ❑ N/A ❑ Deferred LIDA ee: ❑ Yes ❑ N/A ❑ OK to Issue/Approved by 'ermit Coordinator: Date: Revisions (after Building Submittal only) Reviewer Date Revision 1: 0 Approved 0 Not Approved Revision 2: 0 Approved ❑ Not Approved Revision 3: 0 Approved 0 Not Approved 1:1Building\Forms\B1dgPennitRvw COM NoLanduse 08162022.docx