Loading...
Permit (17) CITY OF TIGARD BUILDING PERMIT Ill _ , COMMUNITY DEVELOPMENT Permit#: BUP2023-00095 T I GA R D 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Date Issued: 7/25/2023 Parcel: 2S110AC00400 Jurisdiction: Tigard Site address: 14723 SW 109TH AVE Project: Timberline Apartments Subdivision: None Lot: None Project Description: Replacing(4)decks,like for like,in the same building. Contractor: FINNMARK PROPERTY SERVICES LLC Owner: KA-5 ASSOCIATES LLC 8383 NE SANDY BLVD STE 370 5335 SW MEADOWS RD#190 PORTLAND, OR 97220 LAKE OSWEGO,OR 97035 PHONE: 503-475-0668 PHONE: FAX: Specifics: FEES Description Date Amount Type of Use: MF Class of Work: ALT Type of Const: VB Permit Fee-Additions,Alterations, 07/25/2023 $464.97 Occupancy Grp: R-2 Occupancy Load: 0 Demolition 12%State Surcharge-Building 07/25/2023 $55.80 Dwelling Units: 0 Plan Review 06/26/2023 $302.23 Stories: 0 Height: 0 ft Tenant Improvements in Existing 07/25/2023 $123.00 Bedrooms: 0 Bathrooms: 0 Development Value: $26,000 Floor Areas: Total Area: 0 Accessory Struct: 0 Basement: 0 Carport: 0 Covered Porch: 0 Deck: 0 Garage: 0 Mezzanine: 0 Total $946.00 Required: Required Items and Reports(Conditions) Fire Sprinkler: Parapet: Fire Alarm: Protected Corridors: Smoke Detectors: Manual Pull Stations: Accessible Parking: 0 This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR 952-001-0010 througjt,OAR 952-001-0.090, You may obtain a copy of the rules or direct questions to OUNC by calling 503.232.1987 or 1.800.332.2344. ) Issued By: ! 1%4.7t.•Z Permittee Signature: <7 r r D r� t 14 T + 0 G� II 503.639.4175 by 7:00 a.m.for the next available Inspection date. 1 I This permit cad shall be kept in a conspicuous place on the job site until completion of the project. Approved plans are required on the job site at the time of each inspection. 9 City of Tigard w COMMUNITY DEVELOPMENT DEPARTMENT • C III TIGARD Building Permit Review — Commercial - No Land Use ,a, _ _ - Building Permit #: &\)1,0'1 - GOO Q S Site Address: 1 i-k1L &A) 1 TiitA 4-N-C Suite/Bldg#: Project Name: lilykrlint, Acurivrents -Jec4- illy face vvin(- (Name of commercial business occupying the space. If vacant,enter Spec Space.) Planning Review Proposal: {e c\Gt(Z 4 q(,(`5t11111 d(2,0-5 , cctore S . . Existing Business Activity: f tpow+nvv 1L Proposed Business Activity: �i. it-Verify site address/suite# exists and active in permit system. .River Terrace Neighborhood: ❑ Yes , No Zoning: f26.S-9 ,C? Permitted Use: ] Yes 0 No 0 Spec Space fZI Confirm no land use required. Business License: Exists: ❑ Yes ❑ No, applicant was provided a business license application Notes: Approved by Planning: Date: l%D/2.42/23 Revisions (after Building Submittal only) Reviewer Date Revision 1: 0 Approved ❑ Not Approved Revision 2: ❑ Approved ❑ Not Approved . Revision 3: ❑ Approved 0 Not Approved Building Permit Submittal Original Submittal Date: 114 3 Site Plans: # Building Plans: ## Building Permit#: Enter building permit# above. Workflow Routing: ®'Planning V.Permit Coordinator [7Buildin Workflow Si off: g V Sign-off for Planning(include notes from planning review) Route Application Documents: [Building: original permit application, site plans,building plans,engineer and beam calculations and trust details,if applicable, etc. Notes: \ 4 By Permit Technician: --VNIA.J, p / Date: 1p rM Vi(jti3 1:1Building\Forms\BldgPemutRvw_COM_NolandUse 09072022.docx Engineering Review ❑ Slope at building pad: ❑ PFI Permit#: ❑ Conditions "Met"prio to issuance of permit ❑ Easements (encroachmnts)per engineering conditions of approval and plat (not typical on SDR/CUP) ❑ Water Quality/Quanti Facility: • Assess Water Quali ' Fee in-lieu: ❑ Yes ❑ No Assess Water Quanti,, Fee in-lieu: ❑ Yes ❑ No LIDA Facility on lot: ❑ Yes ❑ No Add Fee: ❑ Yes ❑ No ❑ NOT Approved by E i eering: Date Notes: Approved by Engineering: Date: Revisions (after Building Submitt 1 only) Reviewer Date Revision 1: 0 Approved \p Not Approved Revision 2: 0 Approved 0 Not Approved Revision 3: ❑ Approved ❑ Not Approved Permit Coordinator Review ❑ Conditions "Met"prior to issuance of pertihit ❑ Approved,NOT Released: Date: ❑ ENG Revisions Required: � Date: Notes: ❑ SDC Exemption ❑ Applied for •1 0 Received CI Does not apply ❑ Fees Entered: Wash Co Trans Dev T ❑ Yes 0 N/A 0 Deferred Tigard Trans SDC: Yes ❑ N/A ❑ Deferred Parks SDC: 0 s ❑ N/A 0 Deferred LIDA Fee: ❑ Yes 0 N/A Date: 0 OK to Issue/Approved by Permit Coordinator: Revisions (after Building Submittal only) Reviewer Date Revision 1: 0 Approved 0 Not Approved Revision 2: 0 Approved ❑ Not Approved Revision 3: ❑ Approved ❑ Not Approved 1:13uildingWomu\BldgPeimitRvw_COM NoLandUse_08162022.docx