Loading...
06/06/2018 - PacketTRANSPORTATION ADVISORY COMMITTEE AGENDA – June 6, 2018 City of Tigard | 13125 SW Hall Blvd., Tigard, OR 97223 | 503-639-4171 | www.tigard-or.gov | Page 1 of 1 City of Tigard Transportation Advisory Committee Agenda MEETING DATE/TIME: June 6, 2018 – 6:30 to 8:30 p.m. MEETING LOCATION: Tigard Library, 2nd Floor Conf. Room, 13500 SW Hall Blvd. 1. CALL TO ORDER Ben 6:30 2. INTRODUCTIONS Ben 6:32 3. CONSIDER MINUTES Ben 6:35 4. PUBLIC COMMENT Ben 6:40 5. ODOT HWY 217 PROJECT Mike 6:45 6. 2018 SUMMER PAVING AND FUTURE PAVING PLAN Mike 7:00 7. SAFE ROUTES TO SCHOOL PROGRAM UPDATE Tina Skiles 7:30 8. ENGINEERING PROJECT UPDATES Mike 7:50 9. LIAISON REPORTS - PBS, Planning Com., SWC CAC Ben, Don/Yi, Elise/Lonnie 8:00 10. INFORMATION SHARING Group 8:15 11. ADJOURNMENT Ben 8:30 Supporting materials attached: April 4, 2018 Minutes Upcoming meetings of note: Thursday June 21, 5:00 p.m., Pedestrian Bicyclist Subcommittee, Tigard City Hall, Red Rock Conf. Room Wednesday, July 4 – TTAC meeting CANCELLED Wednesday, August 1, 6:30 p.m., TTAC Meeting, Tigard Library, 2nd Floor Conf. Room Page 1 of 2 CITY OF TIGARD TIGARD TRANSPORTATION ADVISORY COMMITTEE Meeting Minutes June 6, 2018 Members Present: George Brandt, Candi Cornils (Vice Chair), Carl Fisher (alternate), Yi-Kang Hu, Lonnie Martinez, Elise Shearer, Joseph Vasicek, Kevin Watkins, and Lindsey Wise. Members Absent: Ben Gooley (Chair), Ruth Harshfield (alternate), Don Schmidt, and Robert Van Vlack. Staff Present: Streets and Transportation Sr. Project Engineer Mike McCarthy, and Sr. Administrative Specialist Joe Patton. Others Present: Tigard resident Linda Monahan. 1. CALL TO ORDER Vice Chair Cornils called the meeting to order at 6:30 pm. The meeting was held in the Tigard Library, 2nd Floor Conference Room, at 13500 SW Hall Blvd. Joe recorded the roll. 2. INTRODUCTIONS 3. CONSIDER MINUTES The May 2, 2018 meeting Minutes were approved. Lonnie and Yi abstained. 4. PUBLIC COMMENT – None. 5. ODOT HWY 217 PROJECT Mike gave an overview of the project and distributed an Executive Briefing and flyer on the project. Tigard is going to ask for an added off ramp lane at the northbound 99W exit and for a traffic signal at the Hall and Pfaffle intersection due to the visibility and pedestrian crossing issues since the bridge will be replaced. 6. 2018 SUMMER PAVING AND FUTURE PAVING PLAN Mike distributed a map showing all of the roads to receive slurry seal or an overlay, the 2009 – 2017 Pavement Treatments map, and the 2018 – 2023 Tentative Pavement Treatments map and briefly discussed them. 7. SAFE ROUTES TO SCHOOL PROGRAM UPDATE Mike noted the National Walk or Bike to School day saw about a 30% participation rate citywide. 8. ENGINEERING PROJECT UPDATES Mike briefly discussed the project updates. Metro and TriMet will bring the DEIS briefing to TTAC on July 25 which will replace the August 1 meeting. TIGARD TRANSPORTATION ADVISORY COMMITTEE June 6, 2018 Page 2 of 2 9. LIAISON REPORTS – PBS, PLANNING COMMISSION A. The Planning Commission approved development of an 18-lot development behind Fred Meter. B. The SWC DEIS will be released next week to the CAC. DESI comment public meetings include June 26 at Markham Elementary, July 10 at St. Anthony’s Church, July 12 at the Tigard Library, and July 19 in Tigard Town Hall. 10. INFORMATION SHARING A Town Hall meeting with Representative Doherty, Representative Williamson, and Senator Burdick is taking place on June 18 at the Public works auditorium. June 13 there is a Housing Options open house in the Burgess Community Room. Taste of Tigard is on June 16. 11. ADJOURNMENT The meeting adjourned at 8:15 p.m. Joe Patton, TTAC Meeting Secretary Ben Gooley, Chair Construction Project Update – June 6, 2018 Summer Paving Summer paving work starts next week with curb ramp and sidewalk reconstruction along Greenburg Road between Tiedeman Ave and Hwy 217. Some delays likely. Greenburg Road paving is scheduled in mid-July. The street crew is continuing to patch pavement in preparation for a contractor slurry sealing many of the neighborhood streets in northern Tigard this summer. Crack sealing begins June 18th in northern Tigard. River Terrace Area Construction  River Terrace subdivisions are under construction particularly on the east side of Roy Rogers Rd south of Scholls Ferry Rd. If you have any questions, please contact Mike White at 503-718-2464.  A contractor is excavating and grading for a new subdivision on the west side of 150th Ave south of Hawksridge. Some delays possible.  Bull Mountain Road Widening and Traffic Signal Construction: Work is underway to widen Bull Mountain Road to 3 lanes with bike lanes, sidewalks and a roundabout. This project will also install a traffic signal at Bull Mountain and Roy Rogers Road. Visit GetUsThere.org for information and updates. Bull Mountain Road will be closed from 164th Ave to Roy Rogers Rd June 18 – August 20.  There are other significant road, sewer and water projects underway or planned in the area. Visit GetUsThere.org for information and updates. Fanno Creek Trail Remeander Construction begins Friday on the Fanno Creek Trail ‘remeander’ project between Main St and Ash Ave to restore Fanno Creek to a more natural flow path and realign the trail. Work begins with excavating the restored channel, followed by a trail closure starting in mid-July for a couple months for trail realignment. Hwy 217 Auxiliary Lanes The Oregon Department of Transportation (ODOT) is designing a project to add an auxiliary third lane on Hwy 217 southbound from Beaverton-Hillsdale Hwy to Hwy 99W, and Hwy 217 northbound from Hwy 99W to Scholls Ferry Rd. More information is on the project website at hwy217.org. Americans with Disabilities Act (ADA) Transition Plan A consultant team is collecting data on sidewalks, paths, and ramps for our required ADA Transition Plan Update to inventory accessibility needs on public facilities (sidewalks, parks, buildings, etc.). Crews are working northwest of Hwy 99W on this project to advance our accessibility and walkability for all ages and abilities. http://www.tigard-or.gov/ada/ Interstate 5 (Hwy 99W to I-205) Paving and Auxiliary Lane The Oregon Department of Transportation (ODOT) is adding a southbound auxiliary lane on Interstate 5 from Lower Boones Ferry Rd to I-205, improve on- and off-ramps, and repave Interstate 5 (both directions) from Hwy 99W to I-205. Expect some nighttime lane closures through fall 2019. Wall Street (south of Hunziker) Wall Street is under construction south of Hunziker Rd. Access is available to local properties (including Potso Dog Park) but drivers should expect delays. Hwy 99W / Garrett St / School St A developer is building new ‘specialty retail’ stores along the northwest side of Hwy 99W across from Garrett Street, near C.F. Tigard School. 113th Avenue south of Durham Road A contractor is building a new subdivision along 113th Avenue south of Durham Road and is now installing pipes for water, storm, and sanitary sewer for the future new houses. Daytime delays likely. Fanno Creek Trail (Woodard Park to Bonita and Hall Blvd to Tualatin) Design work is in progress on a project to build the remaining segments of the Fanno Creek Trail from Woodard Park to Bonita Road and build a new connection from the end of 85 th Avenue (Hall Boulevard) to the Tualatin Bridge. Contact Mike McCarthy at 503-718-2462 or mikem@tigard-or.gov with questions. 97th Avenue south of McDonald Street A contractor is building a new subdivision along 97th Avenue south of McDonald St, including connecting View Terrace to 97th. Crews are laying pipes for water, storm, and sewer for future houses. Daytime delays likely. Oak Street near 90th Avenue A contractor is working on Oak Street near 90th Avenue for a new apartment complex. Daytime delays likely. 76th and 79th Avenues south of Bonita Road A developer is constructing the Elderberry ridge subdivision on the south end of 76th Ave east of 79th Ave south of Bonita Road. School Construction Construction continues on the new Durham Center education services building near Durham Elementary School. The reconstruction of Templeton Elementary School will begin soon .