02/07/2018 - PacketTRANSPORTATION ADVISORY COMMITTEE AGENDA – February 7, 2018
City of Tigard | 13125 SW Hall Blvd., Tigard, OR 97223 | 503-639-4171 | www.tigard-or.gov | Page 1 of 1
City of Tigard
Transportation Advisory Committee Agenda
MEETING DATE/TIME: February 7, 2018 – 6:30 to 8:30 p.m.
MEETING LOCATION: Tigard Library, 2nd Floor Conf. Room, 13500 SW Hall Blvd.
1. CALL TO ORDER Kevin 6:30
2. INTRODUCTIONS Kevin 6:32
3. CONSIDER MINUTES Kevin 6:35
4. PUBLIC COMMENT Kevin 6:40
5. 2018 STREET PAVING AND RESURFACING PLANS Mike 6:45
6. 2018 TRANSPORTATION PROJECTS Mike 7:00
7. FANNO CREEK TRAIL PROJECT Mike 7:15
8. ENGINEERING PROJECT UPDATES Mike 7:30
9. ELECTION (Chair, Vice-Chair) Mike 7:45
10. LIAISON REPORTS - PBS, Planning Com., SWC CAC Ben, Don/Yi, Elise/Lonnie 8:00
11. INFORMATION SHARING Kevin 8:15
12. ADJOURNMENT Kevin 8:30
Supporting materials attached:
January 3, 2018 Minutes
Upcoming meetings of note:
Thursday Feb 15, 5:00 – 6:30 p.m., Pedestrian Bicyclist Subcommittee, Tigard City Hall, Red Rock Conf. Room
Page 1 of 2
CITY OF TIGARD
TIGARD TRANSPORTATION ADVISORY COMMITTEE
Meeting Minutes
February 7, 2018
Members Present: George Brandt (alternate), Candi Cornils, Erik Halstead, Ruth Harshfield
(alternate), Yi-Kang Hu, Don Schmidt, Elise Shearer, Robert Van Vlack, Kevin Watkins (Chair), and
Lindsey Wise.
Members Absent: Carl Fisher (alternate), Ben Gooley (Vice Chair), Lonnie Martinez and Joseph
Vasicek.
Staff Present: Mike McCarthy, Streets and Transportation Sr. Project Engineer; and Joe Patton, Sr.
Administrative Specialist.
Others Present: Ken Rehms.
1. CALL TO ORDER
Chair Watkins called the meeting to order at 6:30 pm. The meeting was held in the Tigard Library,
2nd Floor Conference Room, at 13500 SW Hall Blvd. Joe recorded the roll.
2. INTRODUCTIONS
3. CONSIDER MINUTES
The January 3, 2018 meeting Minutes were approved. Elise abstained.
4. PUBLIC COMMENT – None.
5. 2018 STREET PAVING AND RESURFACING PLANS
Mike briefly reviewed the roads scheduled for slurry seal and those for overlay in 2018.
6. 2018 TRANSPORTATION PROJECTS
Mike noted the following projects in Tigard for 2018: coordination with ODOT to scope the N.
Dakota Street bridge replacement, adaptive coordination of the Durham Rd./Upper Boones Ferry
corridor, replacement of the Tigard High School crosswalk, Commercial St. sidewalks, Hunziker
core (Fields property) work on rebuilding Wall St. connecting to Tach Center Dr., Roy Rogers Rd.
through River Terrace widening in cooperation with the county, 121st Ave. planning with
construction in 2021, and planning for the north Main St. renovation.
7. FANNO CREEK TRAIL PROJECT
Mike gave an overview of upcoming projects along the Fanno Creek Trail. The first meeting of the
citizen advisory committee will be February 28. Followed by an open house on March 7.
8. ENGINEERING PROJECT UPDATES
Mike briefly discussed the project updates.
TIGARD TRANSPORTATION ADVISORY COMMITTEE
February 7, 2018
Page 2 of 2
9. ELECTION
Ben was elected to serve as Chair. Since he is not present to confirm his willingness to serve, Mike
will contact him. There was a tie for Vice Chair between Erik and Candi. Since Erik was the runner
up for Chair, it was decided to delay the official appointment until the March meeting.
10. LIAISON REPORTS – PBS, PLANNING COMMISSION
A. PBS did not meet in January. The next meeting will include discussion on the Fanno Creek
Trail, brainstorming on walking and cycling events, elections and the Safe Driving campaign.
There was a request to develop an evaluation of the program to see if it is successful.
B. The Planning Commission approved the final plans for the Fields property. Current
residents expressed concern about tenants of the new apartment development parking in
their neighborhood as the new trail connectivity will allow easy walking access between
them.
C. Some parts of the SWC DEIS info were released. Equitable housing is of concern due to
past failures to protect it. The Locally Preferred Alternative (LPA) and how displace
residents and businesses are compensated were also discussed. The information is available
online.
11. INFORMATION SHARING
Kevin shared a video on autonomous cars located at https://goo.gl/nLkCzA.
12. ADJOURNMENT
Chair Watkins adjourned the meeting at 8:30 p.m.
Joe Patton, TTAC Meeting Secretary
ATTEST: Kevin Watkins, Chair
A sh Creek
Fann oCreek 63RDAVE48TH AVEPOMONA ST
BANGY RDBRYANT RDBOONESFERRY RD61STAVEUPPERBOONESFERRY RD49TH AVE62ND AVECARMAN DR62ND DRWA
L
U
G
A
D
RMAIN STBU
R
N
H
A
M
S
T
K
E
R
R
P
K
W
YOLESON RDTIEDEMAN AVEDA
R
T
M
O
U
T
H
S
T
WESTLAKE DRMELROSE ST
LA
K
E
F
O
R
E
S
T
B
L
V
D
CAPITOL HWY
MEADOWS RD
WALNUT STMURRAY BLVDTAYLORS FERRY RD
135TH AVE72ND AVEHUNZI
K
E
R
R
D
PACIFIC HWY125TH AVEGREEN
B
U
R
G
R
D BARBUR BLVDGAARDE ST
KRUSE WAY
LESS
E
R
R
D
150TH AVEWEIR RD
121ST AVEMCDONALD ST
BROCKMAN ST
SCHOLLS FERRY RDHALL BLVDDURHAM RD
BULL MOUNTAIN RD
BEEF BEND RD
B E AV E RTON
D U R HAM
K I N G C ITY
L A K E O S WEGO
P O R T LAND
T U A L ATIN
5
217
99W
³2018 PavementManagement Program
Slurry Seal
Overlay
City of Tigard
Construction Project Update – February 7, 2018
Commercial Street (95th to Lincoln) Sidewalk
The contractor will soon begin work to install a new sidewalk on Commercial Street between 95th and Lincoln.
Commercial Street will be closed to through vehicular traffic during construction. The street will remain open
to pedestrians and local residents.
Main Street / Scoffins Street Traffic Signal Removal
The traffic signal at the intersection of Main Street with Scoffins Street was removed last week. The
intersection was converted to all-way-stop operation in March of 2016, and our observations indicated that
the intersection has functioned better for all modes of travel since the conversion to all-way-stop operation.
Main Street at Commercial Street Crosswalk
A TriMet bus recently knocked over a sign with flashing lights at the crosswalk across Main Street at
Commercial Street. The street crew has replaced the post and sign, and will be reinstalling the flashing lights
when replacement parts are received.
Durham Square Development
A developer is constructing site improvements for two commercial buildings on the property south of Durham
Road between the railroad and Fanno Creek. The sidewalk on the south side of Durham Road will be closed
while the contractor reconfigures it to add the driveway.
East Tigard Sewer Improvements
The City of Tigard and Clean Water Services have installed a new sanitary sewer line along Red Rock Creek
between the railroad tracks and Hunziker Rd. Crews will be repaving Hunziker over the new connection.
Fanno Creek Trail (Woodard Park to Bonita and Hall Blvd to Tualatin)
The design team is surveying the future trail alignment and doing a geotechnical evaluation of potential bridge
and boardwalk locations. The project will build the remaining segments of the Fanno Creek Trail from
Woodard Park to Bonita Road and build a new connection from the end of 85 th Avenue (Hall Boulevard) to the
Tualatin Bridge. Contact Mike McCarthy at 503-718-2462 or mikem@tigard-or.gov with questions.
River Terrace
River Terrace subdivisions are under construction particularly on the east side of Roy Rogers Rd south of
Scholls Ferry Rd. If you have any questions, please contact Mike White at 503-718-2464.
Derry Dell Creek and 118th Ct Landslide and Stormwater Outfall Repair
The Derry Dell at 118th storm drainage and stabilization project is nearing completion. The trail is back open,
with crews planting vegetation along the trail. Contact Carla Staedter at 971-255-7726 with questions.
Oak Street near 90th Avenue
A contractor is installing storm and sanitary sewer pipes under Oak Street near 90 th Avenue for a new
apartment complex along Oak Street. Daytime delays likely.
132nd Avenue south of Walnut Street
A contractor is installing storm drainage pipes under 132 nd Avenue for new homes on the west side of 132nd
Avenue south of Walnut Street. Daytime delays likely.
Main Street Parking Signage
The street crew has updated the parking signage along Main Street and in the other 2-Hour parking zones to
clarify that the 2-hour parking zone is in effect.
WES Trackway Maintenance
TriMet’s contractor is making drainage improvements, ditch and vegetation maintenance, and tie and ballast
replacement, and other maintenance work along the WES rail line. Call TriMet community affairs at 503-962-
2150 with any questions.