Loading...
Report (18) M5[202 3 -oo 5eK 1517,0,2_ lye Vc-$ , 04611 e,,d GEOPPICIFIC vl Real-World Geotechnical Geotechnical Solutions Investigation • Design • Construction Support October 17, 2023 Project No. 22-6162 Ichijo USA Co., LTD Attn: Erik Gomez 1509 SW Sunset Blvd. Suite 2-D Portland, Oregon 97239 Via email to: erik.gomezichijousa.com FOUNDATION SUBGRADE REVIEW LOT 179 RIVER TERRACE CROSSING AKA CROSSING AT BULL MOUNTAIN 15402 SW EVERGLADE AVENUE TIGARD, OREGON This letter addresses the single-family home foundation subgrade on Lot 179 of the River Terrace Crossing development, also known as Crossing at Bull Mountain. We understand that the proposed building is a two-story home with a crawlspace. As part of this evaluation, GeoPacific visited the site on October 16, 2023 to observe the subgrade foundation preparation. At the time of our site visit, the foundation excavation was complete and generally extended approximately 12 to 18 inches below the surrounding grades. Subgrade generally appeared to consist of medium stiff to stiff, gravelly silt engineered fill. The foundation layout of Lot 179 is stepped down to the south in a bench about 2 feet tall. Footing-to- wall and footing-to-slope setbacks did appear to be adequate. Based on observed conditions, foundation subgrades as prepared are considered suitable to support the planned allowable bearing pressure of 1,500 psf. Estimated settlement under the allowable bearing pressure is 1-inch total, and 3 inch differential, measured over a horizontal distance of 20 feet. Care should be taken to avoid saturation or disturbance of footing subgrade soils during and after excavation. If footing bearing soils become saturated or disturbed, any softened soil or slough should be removed and replaced with crushed aggregate or additional concrete. In general, footing excavations should be cleaned such that no more than approximately '/2-inch of loose soils are present prior to pouring concrete. Construction should include typical measures for controlling subsurface water beneath the homes, including positive crawlspace drainage to an adequate low-point drain exiting the foundation, visqueen covering the exposed ground in the crawlspace, and crawlspace ventilation (foundation vents). The homebuyers should be informed and educated that some slow flowing water in the crawlspaces is considered normal and not necessarily detrimental to the home given these other design elements incorporated into its construction. Adequate crawlspace drainage is not something that geotechnical consultants can verify; the purpose of our visit is for observations of foundation bearing conditions only. Appropriate design professionals should be consulted regarding crawlspace ventilation, building material selection and mold prevention issues, which are outside GeoPacific's area of expertise. 14835 SW 72"d Avenue Tel (503)598-8445 Portland,Oregon 97224 Fax(503)941-9281 GeoPacific Engineering, Inc. Job No.22-6162 Lot 179 River Terrace Crossing We have prepared this report for Ichijo USA, and it should not be relied upon by third parties without consulting GeoPacific. Within the limitations of scope, schedule and budget, GeoPacific attempted to execute these services in accordance with generally accepted professional principles and practices in the fields of geotechnical engineering and engineering geology at the time the report was prepared. The conclusions and interpretations presented in this report should not be construed as a warranty of the subsurface conditions. No warranty, expressed or implied, is made. The scope of our work did not include flood hazard evaluations, environmental assessments, the presence or absence of wetlands; or potential hazardous substances in the soil, surface water, or groundwater at this site. We appreciate this opportunity to be of service. Sincerely, GEOPACIFIC ENGINEERING, INC. �,�ED PROpESS ��\y NG I N E 'oy 1474E OREGON ✓4'41N.23.19,4' MSS 0.IMB\ EXPIRES:06/30/2074 James D. Imbrie, P.E. Principal Engineer DocuSign Envelope ID:AD70C919 419B-4FF8-B2D8-91BA6AA6CDE1 i O 2- —oo 2S7 / "CROSSING AT BULL MOUNTAIN NO. 2" 6) i al 6, LOT 179 FOUNDATION CERTIFICATION 5YGQ SE 1/4 SEC. 8, T 2 5, R 1 W, W.M. CITY OF TIGARD, WASHINGTON COUNTY, OREGON SURVEYED OCTOBER 23, 2023 PREPARED FOR: ICHIJO USA 1509 SW SUNSET BLVD. SUITE 2—D PORTLAND, OR 97239 SW HAWK RIDGE ROAD a o0MC3I Cs; ,„ 63 N89'55'53"E 75.00' u 7 Ok 38.63' A' O I o Ca I l!J w �l Oci tel zD `23 - 3 / L- — — — eg LOT io.00' w a Q 179 N o 4 LU 0 0 2.00' '61- 79 U a 0 0 22.00' - N +17.37'—► O -j O r7' n O t J r� N 0 U / 0 0 w Z 50.63' o< w �22.31'�� 77'76' 8 V) S89'55'53"W 90.00' % -Cr) I I0 04 C 0 6.00' PUBLIC REGISTERED UTILITY LOT m PROFESSIONAL EASEMENT 178 a LAND SURVEYOR a •c ,—DocuSigned by: 2 U ''Paws jelAAS,t& \-36REW 8 JULY 9, 2002 >. TRAVIS C. JANSEN z 57751 D tn o RENEWS: 6/30/2025 ., °i I CERTIFY THAT I HAVE VERIFIED THE LOCATION OF THE SCALE 2 FOUNDATION UPON THE HEREIN DESCRIBED REAL PROPERTY 20 0 10 20 AND THAT I FOUND THE IMPROVEMENTS AS SHOWN TO BE 9 UPON THE PREMISES AS HEREIN DESCRIBED, AND THEY DO 1 INCH = 20 FEET $ NOT ENCROACH ON THE PROPERTIES ADJACENT THERETO. 7 ( DRAWN BY: TRK DATE:10/23/23 PACIFIC COMMUNITY DESIGN a REVIEWED BY: T2 DATE:10/23/23 PLANNING ENGINEERING SURVEYING Z PROJECT NO.: 139-001 (503) 941-9484