HomeMy WebLinkAboutPlans (35) " pis 5(.3 ktit4Ave.
I "CREEKVIEW AT SOUTH RIVER TERRACE" MST Zp2S -0002i
LOT 14
HUB AND TACK CERTIFICATION
NE 1/4 SEC. 7, T 2 5, R 1 W. W.M.
CITY OF TIGARD, WASHINGTON COUNTY, OREGON
SURVEYED OCTOBER 4, 2023
PREPARED FOR:
TAYLOR MORRISON NORTHWEST
703 BROADWAY ST., SUITE 710
VANCOUVER, WA. 98660
SOUTH RIVER LOT
TERRACE� 13
6.00' PUB TICC
UTIL
6 Q o m EASEMENT
0 CC I- /�
v CC I- 0 /
0 -, N89130'35"E - V
en 1
77.43' tic
"' 0`_3 t N46159'32'W
o 2 83 39.40'
Er
w 30.20'\� /
� '� LOT ' / L=14.99
W 14
1
m 0 - I
U) + I I S00'29'25"E
4 1 -F-30.36' -1-- ``I - 25.18'1 5.56'
f 30.72-- N69'30'35"E '? 104.56' -25 58.
U 0) I
= LOT
I 15
m D
U z
o REGISTERED
o PROFESSIONAL Q
LAND SURVEYOR I =a � � fv'�,�� LOT ccn
L 16
a
OREGON
JULY 9, 2002
} TRAVIS C. JANSENt Gi),
tL 57751
8 RENEWS: 6/30/2025
c I, TRAVIS C. JANSEN, A REGISTERED PROFESSIONAL LAND SCALE 15 30
it SURVEYOR
SURVEYOR IN THE STATE OF OREGON, HEREBY CERTIFY THAT 30 _ 0 0
6 I HAVE ACCURATELY SURVEYED AND STAKED THE
o FOUNDATION ENVELOPE FOR LOT 14 OF "CREEKVIEW AT 1 INCH = 30 FEET
Q SOUTH RIVER TERRACE".
i (/ DRAWN BY: MJL DATE:10/04/23 o PACIFIC COMMUNITY DESIGN
a REVIEWED BY T2 DATE:10/04/23 PLANNING - ENGINEERING - SURVEYING
Z PROJECT NO.: 395-103 (503) 941-9484
4
C T ENGINEERING SO xickerson St
IN
Suite 302
Seattle,W. 98109
(206)285-4512(V)
(206)285-0618(F)
asol omon(ectengineering.com
BULLETIN
Date: June 20, 2022 Number: CT-02 Project#: 21078
Project Name: South River Terrace Attached: CT-02.1
Subject: Cantilever Retaining Wall
Drawings Affected:
Description/Action:
This bulletin provides response to RFI's, design clarifications and/or variation requests for the
'South River Terrace' project located in Tigard, Oregon.
See attached page CT-02.1 for cantilever retaining wall detail and schedule. Per our discussion with
Taylor Morrison, it's our understanding that for several lots, cantilever retaining walls will be required
as shown.
,,F ��GIN � ,
ALVA
ON ,N
06/20/2022
CALL WITH ANY QUESTIONS
Issued by: Arnold R. Solomon Date: June 20, 2022
Distribution:
Contact Information:
Dennis Gaudreault Taylor Morrison
Frank Sandoval Taylor Morrison
Sam Scott Taylor Morrison
Amy Russell Taylor Morrison
Elizabeth Erlandson Milbrandt Architects
N.\21078 South River Terrace\Bulletins121078_2022.06.20_CT02_Cantilever Retaining Wall.doc
Structural Engineers
lk
II!
•
CT-02 BULLETIN CT-02.1
CONC.S.D.G. \ ID AT 24'0.C.
1 11l l 11 I itieil (2)IS AT 1.0.0
FREE-DRAPING /
BACRFILL
RE: GEOTECH
c 1.VCR BARS PER
2"CLR ° SCHEDULE(LAP'MTH °-
//. DORELS)
IA AT 10'D.C.HOR.
a
.
1_ , .0CANTILEVER RETAINING WALL SCHEDULE
Wla NEYNI HEEL : 10E BAY BEM OPALS SIRE BARS %CARESS
o
A 0'1O3'-0' o-i of L!' n' /A o1r /a 019' 8.
a DOWEL BARS TO MATCHn'-
VERT.BARS
u 1'-i 106-O' i-10. 0'-fi .1'-0 IC /A B12" /a eIt B
FOOLING BARS TO MATCH
RETAINING WALL FOO7NC � Iy`I� . / VERE BARS -
PER SCHEDULE e1.r1u'••,'e r--.. . e'-i To lo'-s' i-i o'-s' s-s- i2 /s a n' As
:EST A
u .1I�1f.gSSIflI ID'-1'1015-0' 5'-10' 0'-6" /-0* 1i /505' /505' d
04.4
FOUNDATION DRAIN ..V.,41 •
BY OTHERS e
•
111_ .
15 0 12'LCNGITODINAL
HEEL 8' 10E
/ / /
BASE
/ /
CANTILEVER RETAINING WALL
A •
CT ENGINEERING
I N C 180 Nickerson St.
Suite 302
Seattle,WA 98 109
(206)28n-4512(V)
(206)2A5-0618(F)
asolomonCa:cten gi neering.com
BULLETIN
Date: August 10, 2022 Number: CT-05 Project) : 21078
Project Name: South River Terrace Attached: CT-05.1
Subject: SOG Dowels to Cantilever Retaining Wall
Drawings Affected:
Description/Action:
This bulletin provides response to RFI's, design clarifications and/or variation requests for the
'South River Terrace' project located in Tigard, Oregon.
Per our discussion with Taylor Morrison, it's our understanding that we will need to provide a rebar
dowel connection for the slab-on-grade to the existing cantilever retaining wall in place of the #3
bars @ 24"o.c. shown at the top of the retaining wall per Bulletin CT-02 (06/20/2022).
See attached page CT-05.1 for the dowel connection. Note that this slab-on-grade dowel
connection may also apply to adjacent foundation walls.
k' NGINe. :
• <C
IY
k„'r. ON ,N
4/• 12,
O°6."��G'
08/10/2022
CALL.WITH ANY QUESTIONS
Issued by: Arnold R. Solomon Date: August 10, 2022
Distribution:
Contact Information:
Dennis Gaudreault Taylor Morrison
Frank Sandoval Taylor Morrison
Sam Scott Taylor Morrison
Amy Russell Taylor Morrison
Elizabeth Erlandson Milbrandt Architects
N:121078 South River Terrace\Bulletins121078_2022.08.10_CT05_SOG Dowels to Cantilever Retaining Wall.doc
Structural Engineers
t
♦
CT ENGINEERING
I H c
SOUTH RIVER TERRACE ,,,,, 08/10/2022 "°"
,,.,,,,,. TAYLOR MORRISON CT-05.1
Now THE tod.s.la COngECTION ,14+own
Hay Rua RPPLY To RozKgr-
FovnoRron WALL
SO C. Pe- EuuT CAnT Rptginlnb WALL
PORN • • (Sri CT-o1 BL LLETI61 lob'20'2011)
r Fu(L QemF-)
3 DoWaS • 196G.C,
(Owu •
EPavY Unn(, G
'flma �ow S1Aon -lie 5
l'
SET J6' AnCHo(uh6 C
RONEfI t Surtm OA
1FPPfbveo EekuAL. l 9
MIN bYlen Dei»t ' 3"r
HIN LeAut4 OP °3 DuwtV
DETAIL
•
Structural Engineers