Loading...
Report (14) 13( 7 s6 166 t ie, 1ze ) pi 7/ C) N /Vzo23 ' ccto3 VV FIELD REPORT Page 1 of 3 Project: NewHome-5-02 Prepared By: Ian Allen Project Name: _ River Terrace Town Center Date: 7/25/23 Location: SW Roy Rogers Road Report#: 116 Tigard,Oregon Arrival: 0915 Departure: 1445 Weather: Sunny, 70s- 80s Permit#: Site Visit Requested By: Darren (D&T Excavation) Met With (on-site): j Sam (Newhome), Brix Crew Purpose: Observe paving and foundation subgrade Outstanding Issues: FR39, FR41, FR42 (10/13/22-10/18/22) -Deflection observed in structural fill Paving -Tracts F& I I observed Brix crew pave tracts F and I as indicated on the attached site plan. I observed crews apply tack coat to vertical curb surfaces prior to paving. I observed crews place 3-inch HMAC base lift and 2-inch top lift using a CAT AP1055F paver. Asphalt used today consisted of level II h-inch dense hot mix asphalt concrete(HMAC)sourced from Knife River(Farmington). Breakdown and intermediate compaction were completed via CAT CB4.0 dual smooth drum vibratory roller. Finish rolling was completed via CAT CB2.7 small dual smooth drum roller.The temperature of asphalt was intermittently monitored behind the paver throughout the day and ranged from 279 to 287 degrees Fahrenheit. I used a Troxler 3430 nuclear density gauge to observe the compaction of the asphalt.Tests were compared to a Brix crew provided RICE value of 155.0 pcf.Tested locations met recommended minimum compaction of 92%of RICE density. Based on our observations and testing, it is our opinion the paved areas observed today, as indicated on the attached site plan, have been compacted in general accordance with project requirements and our geotechnical recommendations. Foundation Subgrade -Lots 24&25 I observed subgrade for exterior and interior footings of lots 24 and 25 as indicated on the attached site plan using a h-inch diameter steel foundation probe. I observed subgrade to consist of brown silt minor sand and occasionally was overlain with approx. 2-inches of medium dense 3A-inch-minus crushed rock. Resulting penetrations indicate generally very stiff to stiff subgrade conditions. I observed an approx. 3-foot vertical cut through the center of one interior spot footing in lot 25 as seen in the attached photos. Sam (NewHome) indicated subgrade was cut incorrectly and the step in subgrade will be filled with concrete. No vertical rebar or dowels were observed within the deeper portion of the footing. A step difference within the footing thickness may result in differential settlement. Based on our observations and probing, it is our opinion that the foundation subgrade observed today, as indicated on the attached site plan has been prepared in general accordance with project requirements as we understand them. We recommend the structural engineer be notified regarding the interior footing discussed above. 9450 SW Commerce Circle,Suite 300 I Wilsonville,OR 97070 1503.968.8787 I www.nv5.com . . N V 5 FIELD REPORT Page 2 of 3 Distribution: Attachments: Photos(2); NDGD(1); Site plan(1) Reviewed by: This report presents opinions formed as a result of our observation of activities relating to geotechnical engineering or environmental services.We rely on the contractor to complywith the plants and specifications throughout the duration of the project irrespective of the presence of our representative.Our work does not include supervision or direction of the contractor,the contractor's employees or agents.Our firm is not responsible for site safety.This field report is a DRAFT representation of our field observations,testing,and preliminary recommendations. The report can only be considered final upon review of the NV5 project manager,as indicated by initials in the Reviewed BY'section. Signature: /'L„.—_ r y f o f i it . i. i/ - / „...,.../ '' 4 Ai) jt ,.. ,.y .a Photo 1: Lot 25 interior spot footing with subgrade elevation step. 9450 SW Commerce Circle,Suite 300 I Wilsonville,OR 97070 1503.968.8787 I Www.nv5.com N V 5 FIELD REPORT Page 3 of 3 s Cx tit.f_. _{ n •01 1. `` /,/ T 1 r , ;t I I v >4_ - � - i. Ate' . .V Photo 2: View of lot 25 from SW corner of structure with red arrows indicating location of interior footing with elevation step in subgrade. 9450 SW Commerce Circle,Suite 300 I Wilsonville,OR 97070 1503.968.8787 I www.nvS.com 4 N I V 15 NUCLEAR DENSITY GAUGE DATA - Project: NewHome-5-02 Project Name: River Terrace Town Center Date: 7/25/2023 Sampled By: ita Project Location: SW Roy Rogers Rd, Tigard, Oregon Material Source Maximum Density: pcf(required) Optimum Moisture A Import Silt- River Terrace Dev. A 1 1 3.9 pcf(ASTM D1557) A 14.2% B 3/4"-0 C.R. (Farmington.) B 125.3 pcf(ASTM D1 557) B 15.5% C 3/4"-0 C.R. (Farmington.) C 122.1 pcf(ASTM D698) C 11.4% D LVL II 3/4"0 Asphalt(Farmington) D 1 54.7 RICE D N/A E LVL II 3/4"0 Asphalt (Coffee Lake) E 1 51.7 RICE E N/A *Lift thickness Test Date Location Elevation* Fill Type Compactor Density % Moisture % % No. Maximum Required 1 7/25 Paving Tract I - See site plan 3" base D Smooth Drum 145.4 N/A 94% 92% 2 7/25 Paving Tract I - See site plan 3" base D Smooth Drum 145.3 N/A 94% 92% 3 7/25 Paving Tract I - See site plan 3" base D Smooth Drum 145.7 N/A 94% 92% 4 7/25 Paving Tract I - See site plan 3" base D Smooth Drum 144.5 N/A 93% 92% 5 7/25 Paving Tract I - See site plan 3" base D Smooth Drum 144.0 N/A 93% 92% 6 7/25 Paving Tract I - See site plan 2" top D Smooth Drum 143.7 N/A 93% 92% 7 7/25 Paving Tract I - See site plan 2" top D Smooth Drum 144.4 N/A 93% 92% 8 7/25 Paving Tract I - See site plan 2" top D Smooth Drum 143.3 N/A 93% 92% 9 7/25 Paving Tract I - See site plan 2' top D Smooth Drum 144.4 N/A 93% 92% 10 7/25 Paving Tract I - See site plan 2" top D Smooth Drum 144.7 N/A 94% 92% 11 7/25 Paving Tract I - See site plan 2" top D Smooth Drum 143.6 N/A 93% 92% 12 7/25 Paving Tract F- See site plan 3" base D Smooth Drum 144.9 N/A 94% 92% 13 7/25 Paving Tract F - See site plan 3" base D Smooth Drum 143.7 N/A 93% 92% 14 7/25 Paving Tract F - See site plan 3" base D Smooth Drum 145.6 N/A 94% 92% 15 7/25 Paving Tract F- See site plan 3" base D Smooth Drum 144.9 N/A 94% 92% 16 7/25 Paving Tract F - See site plan 3" base D Smooth Drum 144.2 N/A 93% 92% 17 7/25 Paving Tract F - See site plan 2" top D Smooth Drum 144.7 N/A 94% 92% 18 7/25 Paving Tract F- See site plan 2" top D Smooth Drum 143.5 N/A 93% 92% 19 7/25 Paving Tract F- See site plan 2" top D Smooth Drum 144.3 N/A 93% 92% 20 7/25 Paving Tract F -See site plan 2" top D Smooth Drum 144.3 N/A 93% 92% _ 21 7/25 Paving Tract F - See site plan 2" top D Smooth Drum 142.6 N/A 92% 92% 22 7/25 Paving Tract F - See site plan 2' top D Smooth Drum 145.4 N/A 94% 92% Page 1 of 1 NewHome-5-02 FR-116 07/25/2023 I •J= Paving observed today __ = Foundation subgrade observed today '., II 1 ��: # = Approx. density test location Areas / locations are approx. - not to scale µ. — m 1 m nr r'v,j¢,i i ,' l i i , i� i ��11 � T # �/� G m,l_ n nmz F 2 '°°°�t777V __ ♦ _ cr � z ,p.I. ro. �n. I�xxv�url R REVISIONS I I � I I � 'll f J _ ,�u(p O� I I i r 5 �YRr■ �' LEGEND I i ,/ f�i {pl '�' — i I —a omaw s oxcru .wu\ ill/ �" I _4� [ rd l , ,n I A L�,i J , r .1 . y t �y '�`F GENERAL NOTES ' 1 / ,. F r `r �. 1.,�„„„. ,o s> o I}_ , E T p1 i g� ut aft 1 E cgs ,, e ' t I I Dam r.nl. h1vL ie'vw.ce - ` a� �N D 1 ei P .' k �, x., .u....,. wee — uw CE : �' ; / " l I j i� I a' T o� „� ..' RIVER ? a. I �. . ass" �. ._a: awaas,_i ly ass S .o».a.r'" 1 roe., bm, �. ■ TOWN CENTER i �> ,�4,�`j', ,bpi I ,\.F / , F. Hw 6Ffl ��IIAIt�IA�j I 1 �"++ �I"'�-"a `�'��� � ,I DVERALL GRADING Irr,`. I /e/ tj P,ti .�= F" YI PLAN 1146% A ' / I f [{� 9i.15 � � E. brig{jl — ; _ 1 l.1' f� 1111r1♦ lW 91 d �.�' .{'.. .�-..... ..- € � •� a � t �.� �� r� .dauabm A �� I g + ' ' / i '� . I� IYIh ° f mf"imp ras Y1f . /// 1 I a ,s a .� VMPI -- - PROJECT M: �b{OS 7 _I - AI i.Lb'G �.. w" l'ww3_'I nsf_�C _ Cd61R�KTOx 8 _ per/ ti �\ m: ., - _ SCALE b tl 8' 109