Loading...
Report Oregon Residential Specialty Code R318.2 MOISTURE CONTENT ACKNOWLEDGEMENT FORM WP-k , am the general contractor or the owner-builder at the folio ng address: Site Address: City: i^'r 0( Permit#: ` NVDT 2_022 - 003 Subdivision/Lot#: n // // - 7 lL`%VEX- ���(0.C2 Cl�c �l Lpt . O and/or Map and Tax Lot#: To conform with the 2017 Oregon Residential Specialty Code(ORSC), Section R318.2 and OAR 918-480-0140, I am notifying the building official that I am aware of the moisture content Requirement of ORSC Section R318.2 and have taken steps to meet this code requirement. [Section R318.2 is provided for reference]. R318.2 Moisture Content: Prior to the installation of interior finishes, the building official shall be notified in writing by the general contractor that all moisture-sensitive wood framing members used in construction have a moisture content of not more than 19 percent by dry weight of dry framing members. Signet . iabb Date: n ontract or Owner-Builder • I:\Building\Form\RFS_MoistureContentAcknowledgement 022018 Oregon Residential Specialty Code N1107.2 HIGH-EFFICIENCY INTERIOR LIGHTING SYSTEMS Permit No.: MS-C20 2 -00 V6-S Jurisdiction: Site Address: ( o Lk 3w -tc*i e vt Subdivision/Lot #: c") ;ve \.-e.V sr.ett.e, Lo-k- ` io and/or o Map and Tax Lot#: By my signature below, I certify that all of the permanently installed lighting fixtures in the above mentioned building contain high-efficacy lamps. Screw-in compact fluorescent and LED lamps comply with this requirement. (Oregon Residential Specialty Code N1107.2)1 Signature: Date: (.0 '��'ZO�� wn n ontr r/A thorized rint N . (T)pU .0,5, ORSC Section NI 107.2.High-efficacy lamps. All permanently installed lighting fixtures shall contain high- efficacy lamps. Screw-in compact fluorescent and LED lamps comply with this requirement. The building official shall be notified in writing at the final inspection that the permanently installed lighting fixtures have met this requirement. Exception: Two permanently installed lighting fixtures are not required to have high-efficacy lamps. I.\tau i Id ingTonnslRES-H i ghEff icien cyLigh ti ngA ck nowledgemen t_022018 Oregon Residential Specialty Code R408.1 MOISTURE BARRIER ACKNOWLEDGEMENT FORM I, � ��.s L LAIRD , am the general contractor or the owner-builder at the followingadtiress: Site Address: i (� L / v� (SW p a-`� /� � City: T1 ��� f-��/ Permit#: IIWNNN-Yv`Sfi 20Z2 _ O� �I�`V ���` --,� Subdivision/Lot#: rT9.,,^ ` o+ 7 0 ,Je, T,e_Yv�-c_Q Grass r� (_ and/or Map and Tax Lot#: To conform with the 2017 Oregon Residential Specialty Code (ORSC), Section R408.1 Ventilation. I am notifying the building official that I have installed the Moisture Barrier as per Requirement in ORSC Section 408.1 and have taken the following steps to meet this code requirement: 7. The ground surface of the under-floor space is covered by a Class I vapor retarder or other approved materials, with gr Joints lapped 12 inches at seams and r<Extending up the foundation walls 12 inches. Signature: Date: - / 5 ZCZ 3 _Siemer Contractor Owner-Bui der C\Bu i Id ing1Form\RBS-MoistureBarri erAcknowledgement_022018 C1eanWaterr Services PERMIT NO. r^ST2o2L- 601 V3 LOT --)o EROSION CONTROL INSPECTION REPORT DATE 10( 1 V) INSPECTOR C-C.s O SUBDIVISION Goes 1-e.rrGct C,,.,ss\�) OWNER/PERMITEE %et— 'rit5Q.. 04,rva SITE ADDRESS 1 S66y S`-' 9,6 s c 2_ Pit. APPROVED FINAL INSPECTION THIS SITE MEETS THE POST-CONSTRUCTION EROSION CONTROL REQUIREMENTS SET FORTH IN CLEAN WATER SERVICES RESOLUTION AND ORDER NOTE: IF POST-CONSTRUCTION EROSION CONTROL MEASURES ARE STILL BEING EMPLOYED ON THIS SITE TO MEET CRITERIA FOR AN APPROVED FINAL INSPECTION, THE MEASURE(S) MUST REMAIN IN PLACE UNTIL LANDSCAPING IS COMPLETE OR PERMANENT GROUND COVER IS ESTABLISHED. A COPY OF THE FINAL EROSION CONTROL INSPECTION REPORT MUST BE FORWARDED TO THE NEW OWNER, AT WHICH TIME NEW OWNER ASSUMES THE RESPONSIBILITY FOR MAINTENANCE,REPAIR AND REMOVAL. OTHER THANK YOU FOR YOUR COOPERATION! INSPECTOR PHONE 5e'3 i4ekt +b-1