Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Permit
CITY OF TIGARD MASTER PERMIT ` I . COMMUNITY DEVELOPMENT Permit#: MST2023-00319 Date Issued: 08/02/2023 T t GAR.D 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Parcel: 2S109DA10500 Jurisdiction: Tigard Site address: 15458 SW OAK VALLEY TER Subdivision: SUMMIT RIDGE NO.2 Lot: 94 Project: Chen Project Description: Rooftop solar system 5.04 kW. BUILDING Floor Areas Required Setbacks Required Stories: 0 Bedrooms: 0 First: 0 sf Basement: 0 sf Left: 0 Parking Spaces: 0 Height: 0 Bathrooms: 0 Second: 0 sf Garage: 0 sf Front: 0 Smoke Dwelling Units: 0 Third: 0 sf Right: 0 Detectors: Total: 0 sf Value: $4,547.09 Rear: 0 PLUMBING Sinks: 0 Water Closets: 0 Washing Mach: 0 Laundry Trays: 0 Rain Drain: 0 Urinals: 0 Lavatories: 0 Dishwashers: 0 Floor Drains: 0 Sewer Lines: 0 SF Rain Drains: 0 Storm Sewer: 0 Tubs/Showers: 0 Garbage Disp: 0 Water Heaters: 0 Water Lines: 0 Catch Basins: 0 Footing Drain: 0 Ice Maker: 0 Hose Bib: 0 Backwater Value: 0 Bckflw Prevntr: 0 Drywell-Trench Drain: 0 Other Fixtures: 0 Other Fixture Units: MECHANICAL Fuel Types Air Conditioning: N Vent Fans: 0 Clothes Dryers: 0 Heat Pump: N Hoods: 0 Other Units: 0 Fum<100K: 0 Vents: 0 Woodstoves; 0 Gas Outlets: 0 Fum>=100K: 0 ELECTRICAL Residential Unit Service Feeder Temp Srvc/Feeders Branch Circuits 1000 sf or less: 0 0-200 amp: 0 0-200 amp: 0 W/Svc or Fdr: 0 Ea add,500 sf: 0 201-400 amp: 0 201-400 amp: 0 W/O Svc/Fdr: 0 Mfd Home/Feeder/Svc: 0 401-600 amp: 0 401-600 amp: 0 601-1000 amp: 0 601+amp-1000v: 0 1000+amp/volt: 0 ELECTRICAL-RESTRICTED ENERGY SF Residential Audio&Stereo: N HVAC: N Security Alarm: N Vaccuum System: N Garage Opener: N All N Other: Y Other Description: Roof top solar array 5.04 kW Ecompasing: BUILDING INFO Class of Work: Type of Use: Type of Consir: Occupancy Group: Square Feet: ALT SF VB R-3 0 Owner: Contractor: LEI&LIJIA LIVING TRUST BRS FIELD OPS LLC Required Items and Reports(Conditions) BY CHEN,LEI& 1403 NORTH RESEARCH WAY ZENG,LIJIA TRS OREM,UT 84097 15458 SW OAK VALLEY TER TIGARD,OR 97224 PHONE: PHONE: 855-205-2530 FAX: Total Fees: $356.69 This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR g92nM-nnin th rise GR9 1 Will maa nhtain a rnnv of the name nr Aired m CI Mr:h.,rallinn Fn4 9Z9 10R7 nr 1 Ann 419 94dd Issued By: f Permittee Signature: Lj�� ��� I r i Call 503.639.4175 by 7:00 a.m.for the next available inspection date. This permit card shall be kept in a conspicuous place on the job site until completion of the project. Approved plans are required on the lob site at the time of each inspection. Electrical Permit Application—City of Tigard Page 2—Supplemental Information Limited Energy Permit Fees: Renewable Energy Permit Fees: RESIDENTIAL WORK ONLY: FEE SCHEDULE Fee for all residential systems combined: $75.00 De5 Renewablen electrical energy systems: Check Type of Work Involved: 5 kva or less 100.70 2 5.01 to 15 kva 1 133.56 2 ❑ Audio and Stereo Systems* 15.01 to 25 kva 200.34 2 Wind generation systems in excess of 25 kva: ❑ Burglar Alarm 25.01 to 50 kva 301.04 2 ❑ Garage Door Opener* 50.01 to 100 kva 552.26 2 >100 kva(fee in accordance 552.26 2 with OAR 918-309-0040) ❑ Heating, Ventilation and Air Conditioning Solar generation systems in excess of 25 kva: System* Each additional kva over 25 7.42 3 ❑ Vacuum Systems* >100 kva—no additional charge 0.0 3 Each additional inspection over allowable in any of the above: n Other: Each additional inspection is 66.25/hr 1 charged at an hourly(I hr min) Inspections for which no fee is 90.00/hr specifically listed(/hr min) COMMERCIAL WORK ONLY: ELECTRICAL PERMIT FEES Subtotal(Enter on Page I): Fee for each commercial system: $75.00 Number of inspections allowed per permit. (SEE OAR 918-309-0000) Check Type of Work Involved: ❑ Audio and Stereo Systems ❑ Boiler Controls ❑ Clock Systems ❑ Data Telecommunication Installation ❑ Fire Alarm Installation ❑ HVAC ❑ Instrumentation ❑ Intercom and Paging Systems ❑ Landscape Irrigation Control* El Medical ❑ Nurse Calls ❑ Outdoor Landscape Lighting* ❑ Protective Signaling ❑ Other: Total number of commercial systems: *No licenses are required. Licenses are required for all other installations [:lauilding5Permits\ELC_PermitApp_ELR_ERl.:.doc Rev 06/17/2015 f R IINICity of Tigard RECEIVED '' Building Division 13125 SW Hall Blvd, Tigard, OR 97223 JUL 1 3 2023 Phone: 503.718.2439 Fax: 503.598.1960 CITY OF TIGARD T I GARD Inspection Line: 503.639.4175 WILDING DIVISION www.tigard-or.gov 2010 Oregon Solar Installation Specialty Code Check List for Prescriptive Installation of Roof-Mounted PhotoVoltaic Solar Panel System Property Information Installation Address: 15458 SW Oak Valley Terrace, Tigard, Oregon, 97224 City: Zip: Owner's Name: Lei Chen Date: 07 / 11 /2023 Contractor's Name: BRS Field Ops, LLC CCB #: 227185 Design Parameters of the Property/Structure If"Yes", does not Is the installation qualify for the Flood Hazard ❑ Yes Area Located in a flood prescriptive path, follow plain/flood way? 2 No OSSC or ORSC for design requirements. Is the wind exposure 2 Yes If"Yes", qualifies for Wind Exposure "C" or less? ❑ No the prescriptive path. Installations on detached Is the Ground Snow single/two-family Load 70 psf or less? dwelling/single/two- If"Yes", qualifies for family townhomes Q Yes the prescriptive path. and/or their accessory Ground structures. ❑ No Snow Load Is the Ground Snow Installations on all Load 50 psf or less? structuresIf"Yes", qualifies for other than © Yes the prescriptive path. above ❑ No 1 I:Building/Forms/Photo Voltaic-Checklist02-01-11.docx Is the construction material wood and does 0 Yes Type of If"Yes", Yes , qualifies for the construction qualify Construction as"conventional light ❑ No the prescriptive path. frame" construction? Is the spacing 24 inches or less? Pre-engineered trusses. Q Yes If"Yes", qualifies for the prescriptive path. ❑ No Roof framing members Is the spacing 24 inches or less? Nominal lumber. If"Yes", qualifies for Yes the prescriptive path. ❑ No Is the combined weight ❑.i Yes of the PV modules and If"Yes", qualifies for racking less than or n No the prescriptive path. Solar equal to 4.5 psf? installation Is the solar installation layout in accordance Yes If"Yes", qualifies for with Section 305.4(3) of ❑ No the prescriptive path. the 2010 Oregon Solar Code? ❑ Metal Single layer If roofing material is Roofing Check the type of ❑ of wood one of the three types material roofing material shingle/shake checked, qualifies for Max. two layers the prescriptive path. © of composition shingle. Is the roof mounted © Yes Connections of solar assembly the solar assembly connected to roof If"Yes",pqrescriptive p for ❑ No the prescriptive path. to the roof framing or blocking directly? 2 I:Building/FormslPhoto V oltaic-Checkli st02-01-11.docx ❑ Yes If"Yes", qualifies for Is the gauge 26 or less? ❑ No the prescriptive path. 115 lbs for 60 inch spacing or less? If"Yes", qualifies for ❑ Yes the prescriptive path. ❑ No Minimum Uplift rating of Clamps? 75 lbs for 48 inches spacing or less? If"Yes", qualifies for ❑ Yes the prescriptive path. ❑ No Attachment of roof mounted If the spacing falls solar systems Spacing of clamps? Minimum 24 inches within 24 inches and 60 directly to inches Maximum 60 inches inches, qualifies for the prescriptive path. standing seam metal panels Width of roofing If the width of the panel panels? 18 inches or less is less than 18 inches, inches qualifies for the prescriptive path. Minimum#10 at 24 inches o/c? Size and spacing of If"Yes", qualifies for fastener? El Yes the prescriptive path. ❑ No Is the roof decking of WSP min. '''A"thickness, ❑ Yes decking connected to If"Yes", qualifies for framing members ❑ No the prescriptive path. w/min. 8d nails @ 6"/12" o/c? Is the height less than or Maximum 18 inches equal to 18 inches? Height of the from the top of the If"Yes", qualifies for solar modules module to the roof © Yes the prescriptive path. surface. El No 3 I:Building/Forms/PhotoV oltaic-ChecklistO2-Ol-11.docx Submittal Documents required for Prescriptive Installations Show the location of the PV system in relation to buildings, structures, property lines, and, as applicable, flood hazard areas. Site Plan Details must be clear and easy to read. Minimum size of the plan is 8.5 x 11 inches. Attach a simple structural plan showing the roof framing (rafter size, type, and spacing) and PV module system racking attachment. System must be shown in sufficient detail and clarity to assess whether it Structural Plan meets the prescriptive construction requirements as listed earlier above in the matrix. Minimum size of the plan is 8.5 x 11 inches. PV Modules Manufacturer: REC Solar Model Number: REC420AA PURE-R Listing Agency: UL 4 I:Building/Forms/PhotoVoltaic-Checklist02-01-11.docx