Permit (35) CITY OF TIGARD MECHANICAL PERMIT
e COMMUNITY DEVELOPMENT MECHANICAL
MEC2023-00470
T t GA R D 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Date Issued: 7/17/2023
Parcel: 2S102AA00603
Jurisdiction: Tigard
Site address: 12020 SW MAIN ST
Project: Woodcraft Subdivision: TIGARD HIGHWAY TRACTS Lot: 12
Project Description: Replace 5 ton heat pump.
Contractor: REITMEIER MECHANICAL Owner: DRL LLC
19570 SW 90TH CT PO BOX 1006
TUALATIN, OR 97062 TUALATIN, OR 97062
PHONE: 503-603-0205 PHONE:
FAX: 503-603-0150
FEES
Specifics: Description Date Amount
Type of Use: COM Permit Fee 07/17/2023 $474.71
Class of Work: ALT Type of Const: VB Plan Review 07/17/2023 $118.68
Occupancy Grp: B Occupancy Load: 12%State Surcharge-Mechanical 07/17/2023 $56.97
Stories: Info Process/Archiving-Sm$0.50(up to 07/17/2023 $14.00
11x17)
Project Valuation: $15,000.00
Fuel Air Handlers
Fuel Types: Electricity Units< 10000 cfm:
Gas Pressure: Units> 10000 cfm:
Furnaces Boilers&Compressors
Furnaces< 100K BTU: 0-3 HP:
Furnaces>= 100K BTU: 3-15 HP:
Floor Furnaces: 15-30 HP:
Unit Heaters: 30-50 HP:
Vents w/o Appliances: 50 or Greater HP:
Air Conditioning:
Heat Pump:
Appliances
Vent Fans: Vent Systems: Total $664.36
Hoods: Comm Incinerators:
Woodstoves: Gas Fireplaces: Required Items and Reports(Conditions)
Clothes Dryers: Other Mech Units:
Gas Outlets: Other Desc:
Duct Work:
Fire/Smoke Dampers:
This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other
applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of
issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon
Utility Notification Center. Those rules are,tsetJorth in OAR 952-001-0010 through OAR 952-001-0090. You may obtain a py oft 4'rules
Issued By: r' Permutes Signature:
y
Call 503.639.4175 byrF dO a.m.for the next available ins e ion d te.
This permit card shall be kept in a conspicuous place on the job site until completion of the project.
Approved plans are required on the job site at the time of each inspection.