HomeMy WebLinkAboutPermit (39) p CITY OF TIGARD MECHANICAL PERMIT
'. 1c COMMUNITY DEVELOPMENT Permit#: MEC2023-00493
TIGARD 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Date Issued: 6/20/2023
Parcel: 2S102AA00600
Jurisdiction: Tigard
Site address: 12045 SW HALL BLVD
Project: 7-11 Subdivision: TIGARD HIGHWAY TRACTS
,��n� .....,_�.,.y: Lot: 12
Project Description: REPRINT: CHANGED NUMBER OF RTU'S FROM 3 TO 2 AS SHOWN ON APPLICATION.
Replace 2 rtu's like for like
Contractor: COOLSYS COMMERCIAL&INDUSTRIAL SOLUTION: Owner: WRB PROPERTIES LLC
145 S STATE COLLEGE BLVD SUITE 200 BY BIRKLAND,WENDELL R
BREA,CA 97222 6432 SW RANGE TER
PORTLAND, OR 97223
PHONE: 714-510-9579 PHONE:
FAX:
FEES
Specifics: Description Date Amount
Type of Use: COM Permit Fee 06/20/2023 $627.11
Class of Work: ALT Type of Const: Plan Review 06/20/2023 $156.78
Occupancy Grp: Occupancy Load: 12%State Surcharge-Mechanical 06/20/2023 $75.25
Stories:
Project Valuation: $21,000.00
Fuel Air Handlers
Fuel Types: Units< 10000 cfm:
Gas Pressure: Units>10000 cfm:
Furnaces Boilers&Compressors
Furnaces<100K BTU: 0-3 HP:
Furnaces>=100K BTU: 3-15 HP:
Floor Furnaces: 15-30 HP:
Unit Heaters: 30-50 HP:
Vents w/o Appliances: 50 or Greater HP:
Air Conditioning:
Heat Pump:
Appliances
Vent Fans: Vent Systems: Total $859.14
1 Hoods: Comm Incinerators:
Woodstoves: Gas Fireplaces:
Required Items and Reports(Conditions)
Clothes Dryers: Other Mech Units:
Gas Outlets: Other Desc:
Duct Work:
Fire/Smoke Dampers:
This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other
applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of
issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon
Utility Notification Center. Those rules are set
forth in OAR 952-001-0010 through OAR 952-001-0090. You may obtain a copy of the rules
Issued By: 1�j'[„l ^ lot
�� 4 Permittee Signature: MC..Y ���WWW�[ll[ �V�1lj� dQ Z,lla1
Call 503.639.4175 by 7:00 a.m.for the next available inspection date.
This permit card shall be kept in a conspicuous place on the job site until completion of the project.
Approved plans are required on the job site at the time of each inspection.
a
CITY OF TIGARD MECHANICAL PERMIT
COMMUNITY DEVELOPMENT Permit#: MEC2023-00493
TIGARD 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Date Issued: 6/20/2023
Parcel: 2S102AA00600
Jurisdiction: Tigard
Site address: 12045 SW HALL BLVD
Project: 7-11 Subdivision: TIGARD HIGHWAY TRACTS Lot: 12
Project Description: Replace 3 rtu's like for like
Contractor: COOLSYS COMMERCIAL&INDUSTRIAL SOLUTION; Owner: WRB PROPERTIES LLC
145 S STATE COLLEGE BLVD SUITE 200 BY BIRKLAND,WENDELL R
BREA, CA 97222 6432 SW RANGE TER
PORTLAND,OR 97223
PHONE: 714-510-9579 PHONE:
FAX:
FEES
Specifics: Description Date Amount
Type of Use: COM Permit Fee 06/20/2023 $627.11
Class of Work: ALT Type of Const: Plan Review 06/20/2023 $156.78
12%State Surcharge-Mechanical O6/20/2023 $75.25
Occupancy Grp: Occupancy Load:
Stories:
Project Valuation: $21,000.00
Fuel Air Handlers
Fuel Types: Units< 10000 cfm:
Gas Pressure: Units> 10000 cfm:
Furnaces Boilers&Compressors
Furnaces<100K BTU: 0-3 HP:
Furnaces>= 100K BTU: 3-15 HP:
Floor Furnaces: 15-30 HP:
Unit Heaters: 30-50 HP:
Vents w/o Appliances: 50 or Greater HP:
Air Conditioning:
Heat Pump:
Appliances
Vent Fans: Vent Systems: Total S859 14
Hoods: Comm Incinerators:
Required Items and Reports(Conditions)
Woodstoves: Gas Fireplaces:
Clothes Dryers: Other Mech Units:
Gas Outlets: Other Desc:
Duct Work:
Fire/Smoke Dampers:
This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other
applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of
issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the r adopted by the Oregon
Utility Notification Center... ose rules are set forth in OAR 952-001-0010 through OAR 952-001-0090. You ma tam a y the rules
1
Issued By: A� fl A l'
Permittee Signature:
Call 503.639.4175 by 7:00 a.m.for the next available inspection date.
This permit card shall be kept in a conspicuous place on the job site until completion of the project.
Approved plans are required on the job site at the time of each inspection.
4r--
t
- Mechanical Permit Application // FOR OFFICE USE ONLY �/
City of Tigard RDate/B: I Q rtJ/ (� Permit No.:j e „ct.. 3 /r 4q -
• 13125 SW Hall Blvd.,Tigard,OR 97223 Plan Review "c 1 (/ 1 t ILIr V1-t/1 W r
S Phone: 503.718.2439 Fax: 503.598.1960 Other Permit:
Date By:
T I G ARD Inspection Line: 503.639.4175 Date Ready/By: Juris: El See Page 2 for
Internet: www.tigard-or.gov Notified/Method: Supplemental Information
TYPE OF WORK COMMERCIAL FEE* SCHEDULE — USE CHECKLIST
Mechanical permit fees*are based on the value of the work
❑New construction ®Addition/alteration/replacement performed.Indicate the value(rounded to the nearest dollar)of all
0 Demolition 0 Other: mechanical materials,equipment,labor,overhead,and profit.
Value:$ 21,000
CATEGORY OF CONSTRUCTION RESIDENTIAL EQUIPMENT/SYSTEMS FEES*
❑ 1-and 2-family dwelling ®Commercial/industrial ❑Accessory building For special information use checklist.
❑Multi-family 0 Master builder ❑Other: Description Qty. Ea. fotal
JOB SITE INFORMATION AND LOCATION Heating/cooling:
Air conditioning 46.75
Job site address:12045 SW Hall Blvd, Furnace 100,000 BTU(ducts/vents) 46.75
City/State/ZIP:Tigard, OR 97223 Furnace 100,000+BTU(ducts/vents) 54.91
g. P Project7-11 TIGARD "uctwo pump 23.32
Suite/bid !a t.no.: name: Duct work 23.32
Cross street/directions to job site: Hydronic hot water system 23.32
Residential boiler(radiator or
hydronic) 23.32
Unit heaters(fuel-type,not electric),
in-wall,in-duct,suspended,etc. 46.75
Flue/vent for any of above 23.32
Other: 23.32
Subdivision: Lot no.:
Other fuel appliances:
Tax map/parcel no.: Water heater 23.32
DESCRIPTION OF WORK Gas fireplace/insert 33.39
Flue vent for water heater or gas
Install NEW grills and ducting. Replace 2x RTUs (like- fireplace 23.32
for-like change out). Log lighter(gas) 23.32
Wood/pellet stove 33.39
Wood fireplace/insert 23.32
Chimney/liner/flue/vent 23.32
Other: 23.32
❑ PROPERTY OWNER If.TENANT
Environmental exhaust and ventilation:
Name: 7-11 Range hood/other kitchen
12045 SW Hall equipment33.39
Address: Blvd, Clothes
dryer exhaust 33.39
City/State/ZIP:Tigard, OR 97223 Single-duct exhaust(bathrooms,
toilet compartments,utility rooms) 23.32
Phone:( ) Fax:( ) Attic/crawlspace fans 23.32
® APPLICANT 0 CONTACT PERSON Other: 23.32
Business name:COOLSYS C&IS Fuel piping:
$14.15 for first four;$4.03 for each additional
Contact name: DAVID Furnace,etc.
Gas heat pump
Address:8545 SE Mcloughlin Blvd. Wall/suspended/unit heater
City/State/ZIP:Milwaukie, Or 97222 Water heater
Phone:( )5032317717 Fax::( ) Fireplace
Range
E-mail:427permits@coolsys.com Barbecue
CONTRACTOR Clothes dryer(gas)
Business name:**same as above** Other:
MECHANICAL PERMIT FEES*
Address:**same as above** Subtotal
City/State/ZIP:**same as above** Minimum permit fee($90.00)
Plan review(25%of permit fee)
Phone:( )**same as above** Fax:( ) State surcharge(12%of permit fee) If
CCB lie.: 149200 TOTAL PERMIT FEE 6'u'I.
This permit application expires if a permit is not obtained within I80
days after it has been accepted as complete.
Authorized signature: * m Fee methodology set by Tri-County Building Industry Service Board
Printname:DAVID SCHEUERMANN Date: 06-16-23
I:\Bulk'iug\Permits\MEC_PermitApp_040113.doc 440-4617P(I 1/02/COM/WEB)
Mechanical Permit Application - City of Tigard
Page 2 - Supplemental Information
Commercial & Multi-Family Fee Schedule:
Total Valuation: Permit Fee:
$0.00 to$500.00 Minimum fee$69.06
$500.01 to$5,000.00 $69.06 for the first$500.00 and
$3.07 for each additional$100.00 or
fraction thereof,to and including
$5,000.00.
$5,000.01 to$10,000.00 $207.21 for the first$5,000.00 and
$2.81 for each additional$100.00 or
fraction thereof,to and including
$10,000.00.
$10,000.01 to$50,000.00 $347.71 for the first$10,000.00 and
$2.54 for each additional$100.00 or
fraction thereof,to and including
$50,000.00.
$50,000.01 to$100,000.00 $1,363.71 for the first$50,000.00 and
$2.49 for each additional$100.00 or
fraction thereof,to and including
$100,000.00.
$100,000.01 and up $2,608.71 for the first$100,000.00 and
$2.92 for each additional$100.00 or
fraction thereof.
Note: All new commercial buildings require 2 sets of plans.
1:1Building\Permits\MEC_PermitApp_040113.doc 2
City of Tigard
COMMUNITY DEVELOPMENT DEPARTMENT
ill I
TIGARD Building Permit Review — Commercial - No Land Use
Building Permit #:
Site Address: 1 (S Sul ¢ion. .V v Ot Suite/Bldg#:
Project Name: li,7 d
(Name of commercial business occupying the space. If vacant,enter Spec Space.)
Planning Review
Proposal: IQ`ct,C.,G 'PZO S
Existing Business Activity: SOV e 5 - oriented petto(
Proposed Business Activity:
lLJ Verify site address/suite#exists and active in permit system.
Xi River Terrace Neighborhood: ❑ Yes ,2"-No
,i Zoning: AAV CRA)
Permitted Use: 2'Yes ❑ No ❑ Spec Space
e Confirm no land use required.
Er Business License:
Exists: Z' Yes 0 No, applicant was provided a business license application
Notes: IrS[Ct QGWet Stlff16fAill to obsvre t'lM frxtaV{PAt) fool WNi. ,Dt^R/t rvliu•
Approved by Planning: l/' Date: 67/?_ 1/ J3
Revisions (after Building Submittal only) Reviewer Date
Revision 1: ❑ Approved ❑ Not Approved
Revision 2: .0 Approved ❑ Not Approved
Revision 3: ❑ Approved 0 Not Approved
Building Permit Submittal
Original Submittal Date:
Site Plans: #
Building Plans:
Building Permit#: 0 Enter building permit#above.
Workflow Routing: 0 Planning 0 Permit Coordinator 0 Building
Workflow Sign-off: ❑ Sign-off for Planning(include notes from planning review)
Route Application Documents: ❑ Building: original permit application,site plans,building plans,engineer and
beam calculations and trust details,if applicable, etc.
Notes:
By Permit Technician: Date:
I:\Building Toms\BldgPermitRvw_COM_NoLandUse_09072022.docx
Engineering Review
❑ Slope at building pad:
❑ PFI Permit#:
❑ Conditions "Met"prior to issuance of permit
❑ Easements (encroachments) per engineering conditions of approval and plat (not typical on SDR/CUP)
❑ Water Quality/Quantity Facility:
Assess Water Quality Fee in-lieu: ❑ Yes ❑ No
Assess Water Quantity Fee in-lieu: ❑ Yes ❑ No
LIDA Facility on lot: ❑ Yes ❑ No Add Fee: ❑ Yes ❑ No
❑ NOT Approved by Engineering: Date
Notes:
Approved by Engineering: Date:
Revisions (after Building Submittal only) Reviewer Date
Revision 1: ❑ Approved ❑ Not Approved
Revision 2: ❑ Approved ❑ Not Approved
Revision 3: ❑ Approved ❑ Not Approved
Permit Coordinator Review
❑ Conditions "Met"prior to issuance of permit
❑ Approved,NOT Released: Date:
❑ ENG Revisions Required: Date:
Notes:
❑ SDC Exemption ❑ Applied for ❑ Received ❑ Does not apply
❑ Fees Entered: Wash Co Trans Dev Tax: ❑ Yes ❑ N/A 0 Deferred
Tigard Trans SDC: 0 Yes ❑ N/A ❑ Deferred
Parks SDC: ❑ Yes ❑ N/A 0 Deferred
LIDA Fee: ❑ Yes ❑ N/A
❑ OK to Issue/Approved by Permit Coordinator: Date:
Revisions (after Building Submittal only) Reviewer Date
Revision 1: 0 Approved ❑ Not Approved
Revision 2: ❑ Approved ❑ Not Approved
Revision 3: ❑ Approved ❑ Not Approved
I:\Building\Forms\BldgPermitRvw_COM_NolandUse_08I 62022.docx