Loading...
Permit CITY OF TIGARD MECHANICAL PERMIT " COMMUNITY DEVELOPMENT Permit#: MEC2023-00634 TIGARD 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Date Issued: 8/3/2023 Parcel: 2S113AB01201 Jurisdiction: Tigard Site address: 16250 SW UPPER BOONES FERRY RD Project: NW Regen Subdivision: None Lot: None Project Description: Venting for 4"dryer and modification of ductwork distribution. Contractor: EXCEL HVAC INC Owner: PACIFIC REALTY ASSOCIATES LP PO BOX 1188 ATTN: N PIVEN CANBY, OR 97013 15350 SE SEQUOIA PKWY#300 PORTLAND, OR 97224 PHONE: 971-930-7194 PHONE: FAX: FEES Specifics: Description Date Amount Type of Use: COM Permit Fee 08/03/2023 $322.42 Class of Work: ALT Type of Const: 12%State Surcharge-Mechanical 08/03/2023 $38.69 Occupancy Grp: Occupancy Load: Info Process/Archiving-Lg$2.00(over 08/03/2023 $2.00 11x17) Stories: Plan Review 08/03/2023 $80.61 Project Valuation: $9,100.00 Fuel Air Handlers Fuel Types: Units<10000 cfm: Gas Pressure: Units>10000 cfm: Furnaces Boilers&Compressors Furnaces<100K BTU: 0-3 HP: Furnaces>=100K BTU: 3-15 HP: Floor Furnaces: 15-30 HP: Unit Heaters: 30-50 HP: Vents w/o Appliances: 50 or Greater HP: Air Conditioning: Heat Pump: Aooliances Vent Fans: Vent Systems: Total 5443.72 CommIncinerators:Hoods: Required Items and Reports(Conditions) Woodstoves: Gas Fireplaces: Clothes Dryers: Other Mech Units: Gas Outlets: Other Desc: Duct Work: 1 Fire/Smoke Dampers: This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not sta ed within 180 days of issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to 4-ow the Q ..opted by the Oregon Utility Notification Cente os rules are set forth in OAR 952-001-0010 through OAR 952-001-0090. You ..lain a..2:11!4I h: rules Issued By: �.. +/i�"Ls°� Permittee Signature: L��� r Call 503.639.4175 by 7:00 a.m.for the next available inspection date. This permit card shall be kept in a conspicuous place on the job site until completion of the project. Approved plans are required on the job site at the time of each inspection. Mechanical Permit Application - City of Tigard Page 2 - Supplemental Information Commercial & Multi-Family Fee Schedule: Total Valuation: Permit Fee: $0.00 to$500.00 Minimum fee$69.06 $500.01 to$5,000.00 $69.06 for the first$500.00 and $3.07 for each additional $100.00 or fraction thereof, to and including $5,000.00. $5,000.01 to $10,000.00 $207.21 for the first$5,000.00 and $2.81 for each additional$100.00 or fraction thereof,to and including $10,000.00. $10,000.01 to$50,000.00 $347.71 for the first$10,000.00 and $2.54 for each additional$100.00 or fraction thereof,to and including $50,000.00. S50,000.01 to$100,000.00 $1,363.71 for the first$50,000.00 and $2.49 for each additional $100.00 or fraction thereof, to and including $100,000.00. $100,000.01 and up $2,608.71 for the first$100,000.00 and $2.92 for each additional$100.00 or fraction thereof. Note: All new commercial buildings require 2 sets of plans. i:\Building\Permits\MEC_PermitApp_040113.doc 2