Loading...
Permit (54) CITY OF TIGARD MECHANICAL PERMIT COMMUNITY DEVELOPMENT Permit#: MEC2023-00672 Date Issued: 8/17/2023 TIGARD 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Parcel: 2S101 DD00200 Jurisdiction: Tigard Site address: 7051 SW SANDBURG ST 100 Project: De Los Altos Foods Subdivision: None Lot: None Project Description: Walk-in cooler installation. Contractor: A&S CONSTRUCTION CORPORATION Owner: SUMMIT PROPERTIES INC 11401 SW GREENBURG RD 4380 S MACADAM BLVD STE 330 TIGARD, OR 97223 PORTLAND, OR 97239 PHONE: 971-645-6825 PHONE: FAX: FEES Specifics: Description Date Amount Type of Use: COM Permit Fee 08/17/2023 $474.71 Class of Work: ALT Type of Const: VB Plan Review 08/17/2023 $118.68 12%State Surcharge-Mechanical 08/17/2023 $56.97 Occupancy Grp: B Occupancy Load: Info Process/Archiving-Sm$0.50(up to 08/17/2023 $3.00 Stories: 11x17) Project Valuation: $15,000.00 Fuel Air Handlers Fuel Types: Electricity Units< 10000 cfm: Gas Pressure: Units> 10000 cfm: Furnaces Boilers&Compressors Furnaces<100K BTU: 0-3 HP: Furnaces>= 100K BTU: 3-15 HP: Floor Furnaces: 15-30 HP: Unit Heaters: 30-50 HP: Vents w/o Appliances: 50 or Greater HP: Air Conditioning: Heat Pump: Appliances Vent Fans: Vent Systems: Total $653.36 Hoods: Comm Incinerators: Required Items and Reports(Conditions) Woodstoves: Gas Fireplaces: 1 Bolts in Concrete Clothes Dryers: Other Mech Units: Gas Outlets: Other Desc: walk in cooler Duct Work: Fire/Smoke Dampers: This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR 952-001-0010 through OAR 952-001-0090. You may obtain a copy of the rules Issued By: rmittee Signature: SYYLev La-dif--- Call 503.639.4175 by 7:00 a.m.for the next available inspection date. This permit card shall be kept in a conspicuous place on the job site until completion of the project. Approved plans are required on the job site at the time of each inspection. Mechanical Permit Application - City of Tigard Page 2 - Supplemental Information Commercial & Multi-Family Fee Schedule: Total Valuation: Permit Fee: $0.00 to$500.00 Minimum fee$69.06 $500.01 to$5,000.00 $69.06 for the first$500.00 and $3.07 for each additional$100.00 or fraction thereof,to and including $5,000.00. $5,000.01 to$10,000.00 $207.21 for the first$5,000.00 and $2.81 for each additional$100.00 or fraction thereof,to and including $10,000.00. $10,000.01 to$50,000.00 $347.71 for the first$10,000.00 and $2.54 for each additional $100.00 or fraction thereof to and including $50,000.00. $50,000.01 to$100,000.00 $1,363.71 for the first$50,000.00 and $2.49 for each additional $100.00 or fraction thereof, to and including $100,000.00. $100,000.01 and up $2,608.71 for the first$100,000.00 and $2.92 for each additional$100.00 or fraction thereof Note: All new commercial buildings require 2 sets of plans. I:\Building\Permits\MEC_PennitApp_040113.doc 2