HomeMy WebLinkAboutCorrespondence Approved plans
shall be on job site.
Karen Abdill 1O-13-cXOO�'J ® �a '""r-,1.
From: Jeff Davis <jeff.davis@pb2ae.com> tulA.V R 2023Sent: Monday, May 8, 2023 8:46 AM
To: Karen Abdill CITY OF TIGARD
Cc: Jeff Davis BUIL DING DIVISION
Subject: RE: Walmart 5935 /7600 Dartmouth St.
You don't often get email from jeff.davis@pb2ae.com.Learn why this is important
Good morning, Karen:
I spoke with the manufacture of the signs and the wall panel system (WPS) and this is how the individual spark
petals/letters attach to the face of the WPS:
- The Spark petals and the word Walmart are attached using Tek Screw Hex Cap 14 x 1"
- The attachment points in the individual sign elements are designed to screw through the .063" aluminum skin
into the supporting aluminum cross-members of the structure and not just into the aluminum skin.
- Attachment hardware will be provided by the manufacturer.
Please let me know if you have any further questions regarding this sign.
Thank you, OFFICE COPY
jeff davis
permit coordinator—exterior paint and signs
pb2 architecture + engineering
2809 ajax avenue suite 100 I rogers arkansas 72758
d: 479.878.3663 1 o: 479.636.35451 f: 479.636.1209
jeff.davis@pb2ae.com www.ab2ae.com
please consider the environment before printing this email
This e-mail(including any attachments)is covered by the Electronic Communications Privacy Act
18 U.S.C.2510-2521.It is confidential and may be legally privileged.If you are not the intended
recipient,you are hereby notified that any retention,dissemination,distribution or copying of this
communication is strictly prohibited.Please reply to the sender that you have received this
message in error,and then delete it.
From:Jeff Davis<jeff.davis@pb2ae.com>
Sent: Friday, May 5, 2023 10:10 AM
To: Karen.abdill@tigard-or.gov
Cc:Jeff Davis<jeff.davis@pb2ae.com>
Subject:Walmart 5935/7600 Dartmouth St.
Good morning, Karen.
I know that we spoke a couple of weeks ago regarding a building permit for the new Walmart sign for store#5935 at
7600 Dartmouth St. During my correspondence with the sign manufacturer I feel that the question that you wanted
. answered got lost among some irrelevant details. Can you confirm that you just needed to know what the attachment
method is that secures the new Walmart sign to the build out attached to the front wall?
1
REFER TO SIGNAGE= NOTE: RECEIVED
GENERAL NOTES FOR 'LOCATE ALL-THREADS PER SIGN
ADDITIONAL REQUIREMENTS J ATTACHMENT TEMPLATE.
P IV 0 8 2023
�/ EXISTING WATERPROOFING
-.. MEMBRANE CITY I OF TIGARD
j SEALANT AT PERIMETER BIT nI�vr Di'J =;vPd
!,. REMOTE PO
REMOTE POWER ri
SUPPLY ENCLOSURE 4 z
- ' K
EXISTONG I:/FS 4
. . REMOTE POWER tr 0
DRILL HOLE AND FEED ;I 4�' SUPPLY�1rNCLOSURE A.
WHIP THROUGH PARAPET " .4
THROUGH WALL 4 �* SEALANT AT PERIMETER x PI
PROTECTION TUBE I`,, AND ANCHORS OF 0
gt
INSTALL PER MFR i. ` ' ENCLOSURE ER SUPPLY a U.
RECOMMENDATIONS
FULL BED OF MULTI- j' M, „z4, IL
COMPONENT SEALANT �. LOW VOLTAGE WIRE Z z O
CONDUAt IT OF � �, �dN"LIQUID TIGHT '�
. g „. FLEXIBLE METAL CONDUIT
... `+gym ' REF REF 2•M FOR ROOF m
m-, i, PENETRATION T)ETAR u
8, re p
4! .,:. 18
ff M' SEALANT AT LO V
4z'
fi VOLTAGE WIRE
;P PERE]RATIONE
N.
INSTALL LETTER BACK 1-_;
PRIOR TO INSTALLATION [ - III' la-.:-
TTACH SIGN TO WALL 1 j i"
PANEL SYSTEM IN PRE-
// 6,'
DRILLED HOLES WI1FI
HARDWARE PROVIDED I.__ ''.` SYSTEM ROOFING
WITH SIGN PER MFR 1'-
RECL?MMENOATIONS, i� 'I - a - _ EXISTING CMU
'hill
INDIVIDUAL PLASTICt
ILLUMIWATED CHANNEL �.
LETTERS I 4;
INSTALL LETTER FACES .€ 4'
W1 SET SCREWS,TYP '
�,
FABRICATED PANEL. - 4'
ASSEMBLY'REF ID•A2.1 I. _-•--- "3-
FOR INSTALLATION ;.;.. . _�.t_..4i
y,l
7
a
ATTACHMENT AT EIFS AND
CMU ABOVE ROOFLUNE
Jeff davis
permit coordinator-exterior paint and signs
pb2 architecture + engineering
2