Loading...
Permit (3) CITY OF TIGARD BUILDING PERMIT 111 COMMUNITY DEVELOPMENT Permit#: BUP2023-00085 Date Issued: 7/19/2023 T({;ARD 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Parcel: 2S101 BA00500 Jurisdiction: Tigard Site address: 7600 SW DARTMOUTH ST Project: Walmart Subdivision: HERMOSO PARK Lot: 8 Project Description: Replace 1 existing sign(letters and logo)over the main entrance. Contractor: MEYER SIGN CO OF OREGON Owner: WAL-MART REAL ESTATE BUSINESS TRUST 15205 SW 74TH AVE ATTN PROPERTY TAX DEPT TIGARD, OR 97224 PO BOX 8050 MS 0555 BENTONVILLE,AR 72716 PHONE: 503-620-8200 PHONE: FAX: 503-620-7074 FEES Specifics: Description Date Amount Type of Use: COM Class of Work: ALT Type of Const: VB Permit Fee-Additions,Alterations, 07/13/2023 $1,323.39 Occupancy Grp: U Occupancy Load: Demolition 12%State Surcharge-Building 07/13/2023 $158.81 Dwelling Units: 0 Plan Review 07/13/2023 $860.20 Stories: 0 Height: 0 ft Bedrooms: 0 Bathrooms: 0 Value: $135,138 Floor Areas: Total Area: 0 Accessory Struct: 0 Basement: 0 Carport: 0 Covered Porch: 0 Deck: 0 Garage: 0 Mezzanine: 0 Total $2,342.40 Required: Required Items and Reports(Conditions) Fire Sprinkler: Parapet: Fire Alarm: Protected Corridors: Smoke Detectors: Manual Pull Stations: Accessible Parking: 0 This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 day '(issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility N ' cation Center. Those rules are set forth in OAR 952-001-0010 through OAR 952-001-0090. You may obtain a copy of the rules or direct questions to OUNC by ca g 503.232.1987 or 1.800.332.2344. Issued By: , Permittee Signatur . Call 503.639.4175 by 7:00 a.m.for the next available inspection dal . This permit card shall be kept in a conspicuous place on the job site until com lion of the project. Approved plans are required on the job site at the time of each inspection.