Resolution No. 23-13 CITY OF TIGARD, OREGON
TIGARD CITY COUNCIL
RESOLUTION NO. 23-19
A RESOLUTION AMENDING THE CITYWIDE FEES AND CHARGES SCHEDULE WHICH WAS
ADOPTED UNDER RESOLUTION NO 22-12 AND SUBSEQUENT AMENDMENTS.
WHEREAS,the City of Tigard has a Fees and Charges Schedule that was adopted during the last budget hearing
as Resolution 22-12;and
WHEREAS,city staff has reviewed fees and services provided;and
WHEREAS,city staff has proposed new fees and changes to certain fees to recover costs or due to previously
approved annual adjustment formulas;and
WHEREAS,the city's Fees and Charges Schedule include fees and charges set by other agencies;and
WHEREAS,Tigard Municipal Code (TMC) 3.32.050 requires that the City Council review fees and charges
annually
NOW,THEREFORE,BE IT RESOLVED by the Tigard City Council that:
SECTION 1: The fees and charges for the City of Tigard are enumerated and set as shown in the attached
schedule (Exhibit A).
SECTION 2: City staff is authorized to make updates to the Fees and Charges Schedule (Exhibit A)
when fees and charges that are set by other agencies become available.
SECTION 3: This resolution is effective July 1,2023 and implemented as soon as administratively
practicable.
PASSED: This r'Yday of ArLC. 2023.
C11132,(21
Mayor-City of Tigard
ATTEST:
0-041
City Recorder-City of Tigard
RESOLUTION NO. 23-i3
Page 1
Exhibit A
City of Tigard, Oregon
Fees & Charges Schedule
Fiscal Year 2023 - 2024
Revised
June 6,2023
II
I
$
i
,1
TIGARD
Page 1
Department Revenue Source Fee or Charge Effective Date
CITYWIDE
Attorney Time Current attorney billing rate 1999
4GB Flash Drives $11.00 each 7/1/2011
Candidate Nomination Petition Fee $50.00 7/1/2008
DVD/CD $10.00 7/1/2015
Faxes for Public $2.00 /first page 7/1/2007
$1.00 /each additional page
Microfiche Sheet Copies $1.00 /sheet up to 50 sheets plus staff time 7/1/2007
Photocopies
8-1/2 x 11 $0.25 /page 1999
8-1/2 x 14 $0.50 /page 1999
11 x 17 $1.00 /page 7/1/2005
17 x 24 $1.50 /page 7/1/2007
36 x 36 $2.50 /page 7/1/2007
Oversized Copies $2.50 /page 7/1/2011
Photographs Actual Cost 1999
Recording of Documents Actual Cost 1999
Research Fee Staff hourly rate +Citywide Overhead 2/7/2002
Fee+Materials
Staff Hourly Rate for Miscellaneous Billing Staff hourly rate+benefits +paid time off+ 7/1/2015
and Reimbursement Agreements administrative time+department overhead+citywide overhead
as determined by most recent A-87 Indirect Cost Study
Based on the agreement,all,or part,of the components
of the A-87 Indirect Cost Study may be used.
ADMINISTRATIVE SERVICES/RECORDS
Tigard Municipal Code(TMC)(Titles 1-17)or TMC/CDC(Titles 1-18)
Compact Disk(CD) $10.00 7/1/2009
CITY MANAGEMENT
Claims Application Fee(TMC 1.21.050&1.22;Ord.08-09) $1,000.00 /deposit* 6/24/2008
Page 2
Department Revenue Source ."" Fee or C,large Effective Date,
Claim fee shall be actual cost incurred by the city to process claim.
Any funds remaining from the deposit after the claim has been processed will be
refunded to the claimant.Payment of any costs exceeding the amount of the deposit
is required prior to issuance of a final decision by the city on the claim.
CITYWIDE- Parking Permits •names*
PARKING Downtown Parking Permit $ 9 /month ' 7/1/2022
5641 7/1/2023
Construction Parking Permit $7 /day/space in 2-hour zone 7/1/2022
/day/space in 4-hour zone 7/1/2022
$5 7/1/2023
Residential Parking Permit Annual Resident Owned Vehicle
$2 Permit(one permit per vehicle) 7/1/2022
$23 7/1/2023
$0 Guest permit(with purchase of 7/1/2021
resident permits)
$55 7/1/2022
$445 first offense 2/2/2015
$55 7/1/2022
*Adjusted annually in conjunction with the West Consumer Price Index(CPI)-If index is insufficient to increase fee in whole dollar,increase will
compound into the next year. TMC 3.32.050
io
Page 3
Department Revenue Source
$1700040/lepesitA 6/21/2008
MUNICIPAL COURT
Municipal Court Presumptive Fees
Traffic School and Compliance Program Fee
Traffic School See Court Rule O 10/3/2022
Criminal $150.00 5/15/2023
Ju ettile-nes-traf€e $130:00 7/1/2017
Traf€e-Sehool _.., . . : . 8/28/2008
Traffic Safety Education Class(In addition to course fee) 10/3/2022
Class B $200.00
Class C $115.00
Class D $89.00
Civil Compromise $150.00 8428/2008
5/15/2023
Copies $0.25 per page 5/15/2023
License Reinstatement $15.00 8/28/2008
No Fee 7/1/2023
Payment Agreement Administrative Fee $1-5:00 8/28/2008
No Fee 7/1/2023
Collection rate 25% 9/27/2022
Failure to Appear at Arraignment $25.00 9/27/2022
Failure to Appear at Trial $100.00 9/27/2022
Failure to Comply $30.00 9/27/2022
Fix-It Ticket $40.00 9/27/2022
$4-O.00 8/28/2008
Show Cause Hearings-Court Costs 5/15/2023
Page 4
Non-compliance $25.00 84.28/2008
Non-payment-fees paid prior to hearing No Fee 5/15/2023
Warrant Fee $50.00 5/15/2023
Wedding Fee for City Hall $75.00 5/15/2023
.. . . . .
Compact Disk-(CD) $4-0700 ;472009
Presumptive Fine Schedule*
Standard
Class A Violation $440.00 5/15/2023
Class B Violation $265.00 5/15/2023
Class C Violation $165.00 5/15/2023
Class D Violation $115.00 5/15/2023
Traffic Violation in Special Zone
Class A Violation $875.00 5/15/2023
Class B Violation $525.00 5/15/2023
Class C Violation $325.00 5/15/2023
Class D Violation $225.00 5/15/2023
Special Traffic Violations
Speeding 100 mph or greater $1,150.00 5/15/2023
Careless Driving
injury or death of vunerable user Mandatory apperance 5/15/2023
Helmet Violations $25.00 5/15/2023
Tigard Municipal Code
Miscellaneous non-parking violations(IMC 10.32) $265.00 5/15/2023
Abandoned Vehicle(TMC 7.60) $265.00 5/15/2023
Jaywalking(TMC 10.32.235) $115.00 5/15/2023
Parking Violations(1'MC 10.28) $53.00 5/15/2023
Citation dismissal(as permitted in Court Rule 3) $40.00 5/15/2023
*Court may impose reduced fines as outlined in Court Rule 2.
Page 5
Department Revenue Source �+ <•.> Effective Date
FINANCIAL "Fcatz , A SERVICES
Assessment Assumption $50 4/22/1985
Budget or Annual Comprehensive Financial Report Documents
Compact Disk(CD) $10 7/1/2007
Paper $50
Business License
Annual Fee*
0-2 employees $402 /per year 7/1/2022
$110 7/1/2023
3-5 employees $138 /per year 7/1/2022
$149 7/1/2023
6-10 employees $48.3 /per year 7/1/2022
$522 7/1/2023
11-20 employees $792 /per year 7/1/2022
$855 7/1/2023
21-50 employees $908 /per year 7/1/2022
$981 7/1/2023
51-75 employees $990 /per year 7/1/2022
$1,069 7/1/2023
greater than 75 employees $1,310 /per year 7/1/2022
$1,447 7/1/2023
*Adjusted annually in conjunction with the West Consumer Price Index(CPI-U).
Pro-Rated Fee Schedule
Issued January 1 -June 30 See Fee Schedule above
Issued July 1 -December 31 1/2 the annual fee
Temporary License $25 1/1/2008
Duplicate License/Change of Ownership Fee
Change in ownership or name only $10 1/1/2008
Copy/replacement of license $10 1/1/2008
Delinquency Charge
Whenever the business license fee is not paid on or before the delinquent date,a delinquency charge equal to ten percent(10%)of the original business
license fee due and payable shall be added for each calendar month or fraction thereof that the fee remains unpaid. The total amount of the delinquency
penalty for any business license year shall not exceed one hundred percent(100%)of the business license fee due and payable for such year.
_. .. 2/7/2002
Page 6
Department Revenue Source Fee,or Charge > ve Dail
Franchise Fee(for existing franchises)
Electricity** (Owns facility in ROW and provides service to customers , 1/9/2015
within Tigard) witiehever-is-grester
er
5%of gross revenue or a$4,120 minimum fee, 7/1/2023
whichever is greater
Electricity** (Owns facility in ROW and provides no service to customers .. : 7/1/2022
within Tigard) ,
$3.04/linear foot of installation in right-of-way or 7/1/2023
a$4,120 minimum fee,whichever is greater
Electricity (Using a non-owned facility in ROW and provides service to 5%of gross revenue 1/9/2015
customers within Tigard)
Natural Gas** (Owns facility in ROW and provides service to customers : . ,!!! -- - . - - , 1/9/2015
within Tigard) whichever-is-greater
5%of gross revenue or a$4,120 minimum fee, 7/1/2023
whichever is greater
Natural Gas** (Owns facility in ROW and provides no service to customers :. =: 7/1/2022
within Tigard) ,
$3.04/linear foot of installation in tight-of-way or 7/1/2023
a$4,120 minimum fee,whichever is greater
Natural Gas (Using a non-owned facility in ROW and provides service to 5%of gross revenue 1/9/2015
customers within Tigard)
(Owns facility in ROW and provides service to customers ' . : -. !! 1/9/2015
within Tigard) whiehevet-i*grester
Communication 5%of gross revenue or a$4,120 minimum fee,
Services*/** whichever is greater
Telecom** (Owns facility in the ROW and provides no service to 7/1/2022
customers within Tigard) ,
Communication $3.04/linear foot of installation in right-of-way or 7/1/2023
Services*/** a$4,120 minimum fee,whichever is greater
Telecom* (Using a non-owned facility in ROW and provides service to 5%of gross revenue 1/9/2015
customers within Tigard)
Communication
Services*
Stormwater (Owns facility in ROW and provides service to customers 5%of gross revenue or a$4,000 minimum fee, 7/1/2020
within Tigard) whichever is greater
Stormwater** (Provides no service to customers within Tigard) :: :..::: =: 7/1/2022
$3.04/linear foot of installation in right-of-way or 7/1/2023
a$4,120 minimum fee,whichever is greater
Page 7
Department Revenue Source Fee or Charge cive Dl1111
Stormwater (Using a non-owned facility in ROW and provides service to 5%of gross revenue 7/1/2020
customers within Tigard)
Utility Franchise Application Fee** $2;000:00 8/$/2006
$2,060.00 • 7/1/2023
Solid Waste Disposal (See TMC 11.04) 5%of gross revenue 7/1/2013
Wireline Cable TV(See TMC 5.12) 5%of gross revenue 1/26/1999
Application filed with MACC(email mace@maccor.org)
Right of Way Usage Fee(See TMC 15.06)
Electricity'• (Owns facility in ROW and provides service to customers ". : - ! •. 2/5/2019
within Tigard)
5%of gross revenue or a$4,120 minimum fee, 7/1/2023
whichever is greater
Electricity** (Owns facility in ROW and provides no service to customers ' .' . . .. : .. ....:. - 7/1/2022
within Tigard) I!! --•- - .. - - -
$3.04/linear foot of installation in right-of-way or 7/1/2023
$4,120 minimum fee,whichever is greater
Electricity (Using a non-owned facility in ROW and provides service to 5%of gross revenue 2/5/2019
customers within Tigard)
Natural Gas' (Owns facility in ROW and provides service to customers - - - !!! -' • -: - 2/5/2019
within Tigard)
5%of gross revenue or a$4,120 minimum fee, 7/1/2023
whichever is greater
Natural Gas** (Owns facility in ROW and provides no service to customers . :..::: 7/1/2022.
within Tigard)
$3.04/linear foot of installation in right-of-way or 7/1/2023
a$4,120 minimum fee,whichever is greater
Natural Gas (Using a non-owned facility in ROW and provides service to 5%of gross revenue 2/5/2019
customers within Tigard)
Telecom** (Owns facility in ROW and provides service to customers - !.. .. 2/5/2019
within Tigard)
Communication 5%of gross revenue or a$4,120 minimum fee, 7/1/2023
Services*/** whichever is greater
Telecom** (Owns facility in the ROW and provides no service to . .. :: 7/1/2022
customers within Tigard) e
Page 8
Department Revenue Source Fee Effective Date
Communication $3.04/linear foot of installation in right-ot
Services*/** a$4,120 minimum fee,whichever is greater
Telecom** (Using a non-owned facility in ROW and provides service to 5%of gross revenue 2/5/2019
customers within Tigard)
Communication
Services*
Small Wireless Facilities*** $7-50.0()per year per installation 7/1/2022
$772.50 7/1/2023
Right-of-Way Application fees**(excluding small cell providers)
Includes five-year license $300:00 7/1/2020
$309.00 7/1/2023
Right-of-Way License Renewal** (excluding small cell providers)
for a five-year license $250:00 7/142020
$257.50 7/1/2023
Small Cell Wireless provider right-of-way application fee:
Includes a five-year license $50:99 7/1/2020
$51.50 7/1/2023
Small Cell Wireless provider right-of-way license renewal $-544:00 7/1/2020
$51.50 7/1/2023
* Communication.Services as defined in TMC 15.06
** Franchise Fees and Right of Way Usage Fees-Linear foot fee,minimum fee,and small cell application and license renewal fees will increase 3%(three percent)annually on July 1,beginning on July 1,
***Small Wireless Facility Fee will escalate annualy by 3%per department policy . .
Lien Search Fee $35.00 2/1/2004
Overhead Fee
Added to charges for property damage/repair 10%of total charge
Returned Check Fee $20.00 10/9/2001
Sewer Reimbursement District Loans
Interest Rate Applicable Federal Rate(AFR),Table,Long-term,semiannual for the
month the loan is approved
System Development Charge Financing(other than Sewer Reimbursement District Loans)
Application Fee $25.00
Interest Rate Prime rate as published in the Wall Street Journal as of the date of the
application plus 4%
Page 9
Department Revenue Source Fee or Charge Effective Date
LIBRARY
Flash Drive $5.00 each 7/1/2013
Headphones $2,50 each 7/1/2020
Library Card Fee(non-residents only) $140.00 per year 8/1/2017
Lost Items Replacement cost 3/1/2019
Overdue Items
Daily Charge No Fee 1/26/2021
(Adult and Young Adult Materials-Not Including Juvenile Materials)
Realia Charge No Fee 1/26/2021
(Wi-Fi Hotspots,potentially other new Library of Things)
Maximum Charge No Fee 1/26/2021
Public Copier and Printer Charges
$0.10 /page for black&white 2001
$0.50 /page for color 7/1/2011
Replacement Library Card Fee No Fee 1/26/2021
Page 10
Department Revenue Source Fee or Charge Effective Date
POLICE
Alarm Permit Fee(Residential&Commercial)
(Government agencies,disabled residents or over the age of 60 are exempt) $25.00 7/1/2009
Late payment of fees/fines (after 60 days) $50.00 7/1/2020
Expired,Reinstatement Fee,Once Revoked(After 90 days past due) $100.00 7/1/2014
Non-permitted or Revoked Alarm Permit $500.00 7/1/2013
False Alarm Fines
1st false alarm No Charge 7/1/2013
2nd false alarm No Charge 7/1/2013
3rd false alarm $100.00 7/1/2013
4th false alarm $150.00 7/1/2013
5th false alarm $200.00 7/1/2013
6 or more false alarms $250.00 7/1,'2013
Fingerprint Card $15.00 per card 7/1/2012
Good Conduct Background/Letter $10.00 7/1/2012
Law Enforcement Officers Safety Act Qualification Fee $25.00 7/1/2006
Liquor License $25.00 7/10/2001
Police Services Fees
(a)i DVD/Audio/VHS/Video/B y Digital Evidence Copies $20.00 or hourly rate,n--,,--•..... _f one half
plus material 7/1/2012
Police Documents/Reports $10.00 /for the first 15 pages and 7/1/2008
$0.30 /page thereafter
$6I-000/CD 7/1/2005
$40:00 ..1! 7/1/2003
Body Worn Camera Footage Per hour rate in excess of one half hour plus material
Materials
Link $20.00 7/1/2022
CD/DVD/Blue Ray $10.00 7/1/2022
$20.00 7/1/2023
4-8 GB Flash Drive $11.00 7/1/2022
Page 11
Department Revenue Source Fee or Charge Effective Date
POLICE
16-32 GB Flash Drive $13.00 7/1/2022
64 GB Flash Drive $18.00 7/1/2022
128 GB Flash Drive $32.00 7/1/2022
External Hard Drive Price varies based on size 7/1/2022
Property Forfeiture for Criminal Activity Varies 5/25/1999
Second Hand Dealers and Transient Merchant License
Occasional $40.00 7/1/2010
Full-Time $100.00 7/1/2010
Reporting Forms $0.80 each 7/1/2010
Social Gaming License
Annual fee due January 1st $100.00 1/1/2014
If a business applies on or after July 1st $50.00 7/1/2014
Vehicle Release Fee $125.00 7/1/2013
Page 12
Department Revenue Source Fee or Charge Effective Date
COMMUNITY DEVELOPMENT-BUILDING
Building Permit Fees
(New Commercial) 10/1;'2009
Total Valuation:
$0.00 to$500.00 $51.09 /minimum
$500.01 to$2,000.00 $51.09 /for the first$500 and
$2.69 /for each additional$100 or fraction thereof.
$2,000.01 to$25,000.00 $91.44 /for the first$2,000 and
$10.76 /for each additional$1,000 or fraction thereof
$25,000.01 to$50,000.00 $338.92 /for the first$25,000 and
$8.06 /for each additional$1,000 or fraction thereof
$50,000.01 to$100,000.00 $540.42 /for the first$50,000 and
$5.38 /for each additional$1,000 or fraction thereof
$100,000.01 and over $809.42 /for the first$100,000 and
$4.49 /for each additional$1,000 or fraction thereof
(New Single Family&Multi-Family) 10/1/2009
Total Valuation:
$0.00 to$2,000.00 $66.25 /minimum
$2,000.01 to$25,000.00 $66.25 /for the first$2,000 and
$11.48 /for each additional$1,000 or fraction thereof
$25,000.01 to$50,000.00 $330.29 /for the first$25,000 and
$8.75 /for each additional$1,000 or fraction thereof
$50,000.01 to$100,000.00 $549.04 /for the first$50,000 and
$6.25 /for each additional$1,000 or fraction thereof
$100,000.01 to$250,000.00 $861.54 /for the first$100,000 and
$4.46 /for each additional$1,000 or fraction thereof
$250,000.01 to$500,000.00 $1,530.54 /for the first$250,000 and
$4.42 /for each additional$1,000 or fraction thereof
$500,000.01 to$1,000,000.00 $2,635.54 /for the first$500,000 and
$4.10 /for each additional$1,000 or fraction thereof
Page 13
Department Revenue Source Fee or Charge Effective Date
$1,000,000.01 to$2,000,000.00 $4,685.54 /for the first$1,000,000 and
$3.33 /for each additional$1,000 or fraction thereof
$2,000,000.01 and over $8,015.54 /for the first$2,000,000 and
$3.18 /for each additional$1,000 or fraction thereof
(Additions,Alterations,and Demolitions for
Single Family,Multi-Family,Commercial,&Industrial) 10/1/2009
Total Valuation:
$0.00 to$500.00 $53.27 /minimum
$500.01 to$2,000.00 $53.27 /for the first$500 and
$3.39 /for each additional$100 or fraction thereof
$2,000.01 to$25,000.00 $104.12 /for the first$2,000 and
$15.21 /for each additional$1,000 or fraction thereof
$25,000.01 to$50,000.00 $453.95 /for the first$25,000 and
$11.02 /for each additional$1,000 or fraction thereof
$50,000.01 to$100,000.00 $729.45 /for the first$50,000 and
$7.53 /for each additional$1,000 or fraction thereof
$100,000.01 to$500,000.00 $1,105.95 /for the first$100,000 and
$6.04 /for each additional$1,000 or fraction thereof
$500,000.01 to$1,000,000.00 $3,521.95 /for the first$500,000 and
$5.09 /for each additional$1,000 or fraction thereof
$1,000,000.01 and over $6,066.95 /for the first$1,000,000 and
$3.39 /for each additional$1,000 or fraction thereof
Building Plan Review Fee 65%of base building permit fee 9/26/2000
Deferred Submittals $200.00 minimum fee 9/24/2002
Plan Review plus 65%of building permit fee based on valuation
of the particular portion or portions of the project.
Phased Permitting $200.00 9/24/2002
Plan Review plus 10%of building permit fee based on total project valuation
not to exceed$1,500 for each phase
Page 14
Department Revenue Source Fee or Charge Effective Date
Photovoltaic Solar Panel System $180.00 (includes plan review and administrative fees) 1/1/2011
plus 12%state surcharge of permit fee
Electrical Fees 10/1/2009
New residential,single or multi-family per dwelling unit;service included:
1000 square feet or less $168.54
Each additional 500 square
feet or portion thereof $33.92
Limited energy,residential or multi-family $75.00
(with above sq ft)
Each manufactured home or
modular dwelling service or feeder $67.84
Services or feeders;installation,alterations or relocation:
200 amps or less $100.70
201 amps to 400 amps $133.56
401 amps to 600 amps $200.34
601 amps to 1000 amps $301.04
Over 1000 amps or volts $552.26
Reconnect only $67.84
Temporary services or feeders;installation,alteration or relocation:
200 amps or less $59.36
201 amps to 400 amps $125.08
401 amps to 600 amps $168.54
Branch circuits;new,alteration or extension per panel:
With purchase of service or
feeder-each branch circuit $7.42
Without purchase of service or feeder
First Branch Circuit $56.18
Each addit.Branch circuit $7.42
Miscellaneous(service or feeder not included):
Each pump or irrigation circuit $67.84
Each sign or outline lighting $67.84
Signal circuit(s)or a limited
energy panel,alteration or extension $75.00
Each additional inspection over
the allowable in any of the above
Per Inspection $66.25 /hour(min 1 hour)
Per Hour $66.25 /hour(min 1 hour)
Industrial Plant Inspection $78.18 /hour(min 1 hour)
Page 15
Department Revenue Source Fee or Charge Effective Date
Renewable Energy Electrical Fees:
5 kva or less $100.70 7/1/2012
5.01 to 15 kva $133.56 7/1/2012
15.01 to 25 kva $200.34 7/1/2012
Wind generation systems in excess of 25 kva:
25.01 to 50 kva $301.04 7/1/2012
50.01 to 100 kva $552.26 7/1/2012
>100 kva the permit fee shall be calculated
in accordance with OAR 918-309-0040.
Solar generation systems in excess of 25 kva:
Each additional kva over 25 $7.42 7/1/2012
>100 kva no additional charge
Each additional inspection over allowable in any of the above:
Each additional inspection will be charged $66.25/hr 7/1/2012
at an hourly rate(1 hr minimum)
Misc. fees at an hourly rate(1 hr minimum) $90.00/hr 7/1/2012
Electrical permit plan review fee 25%of the electrical permit fee
Fire Protection Systems 10/1/2009
(Commercial Fire Suppression-Sprinkler,Alarm and Type I-Hood systems based on project valuation)
Total Valuation:
$0.00 to$500.00 $51.09 /minimum
$500.01 to$2,000.00 $51.09 /for the first$500 and
$2.69 /for each additional$100 or fraction thereof
$2,000.01 to$25,000.00 $91.44 /for the first$2,000 and
$10.76 /for each additional$1,000 or fraction thereof
$25,000.01 to$50,000.00 $338.92 /for the first$25,000 and
$8.06 /for each additional$1,000 or fraction thereof
$50,000.01 to$100,000.00 $509.42 /for the first$50,000 and
$5.38 /for each additional$1,000 or fraction thereof
$100,000.01 and over $809.42 /for the first$100,000 and
$4.49 /for each additional$1,000 or fraction thereof
Fire Life Safety Plan Review 40%of base building permit fee 9/26/2000
(Commercial Only)
Page 16
Department Revenue Source Fee or Charge Effective Date
Fire Protection Systems 10/1/2009
(Residential Fire Suppression)
Stand Alone System
Square Footage:
1 to 2,000 $198.75
2,001 to 3,600 $246.45
3601 to 7,200 $310.05
7,201 and over $404.39
Multipurpose or Continuous Loop System
Square Footage:
0 to 2,000 $121.90
2,001 to 3,600 $169.60
3,601 to 7,200 $233.20
7,201 and over $327.54
Manufactured Dwelling Installation $305.50 9/24/2002
(Fee includes placement permit$275.50 and state administration fee$30.00)
Manufactured Dwelling and Mobile Home Per OAR 9/24,'2002
Parks,Recreation Camps,and Organizational Camps
Mechanical Fees 10/1,'2009
(1&2 Family Dwellings for New,Additions,or Alterations)
Heating/Cooling:
Air conditioning $46.75
Furnace 100,000 BTU(ducts/vents) $46.75
Furnace 100,000+BTU(ducts/vents) $54.91
Heat pump $61.06
Duct work $23.32
Hydronic hot water system $23.32
Residential boiler(radiator or hydronic) $23.32
Unit heaters(fuel-type,not electric),
in-wall,in duct,suspended,etc. $46.75
Flue/vent for any of above $23.32
Other $23.32
Page 17
Department Revenue Source Fee or Charge Effective Date
Other fuel appliances:
Water heater $23.32
Gas fireplace $33.39
Flue/vent for water heater or gas fireplace $23.32
Log lighter(gas) $23.32
Wood/pellet stove $33.39
Wood fireplace/insert $23.32
Chimney/liner/flue/vent $23.32
Other $23.32
Environmental exhaust and ventilation:
Range hood/other kitchen equipment $33.39
Clothes dryer exhaust $33.39
Single-duct exhaust(bathrooms,
toilet compartments,utility rooms) $23.32
Attic/crawlspace fans $23.32
Other $23.32
Fuel piping:
First four $14.15
Each additional $4.03
Minimum permit fee $90.00
Mechanical plan review fee 25%of Permit Fee
Mechanical Permit Fees 10/1/2009
(Commercial and Multi-family)
Total Valuation:
$0.00 to$500.00 $69.06 /minimum
$500.01 to$5,000.00 $69.06 /for the first$500 and
$3.07 /for each additional$100 or fraction thereof
$5,000.01 to$10,000.00 $207.21 /for the first$5,000 and
$2.81 /for each additional$100 or fraction thereof
$10,000.01 to$50,000.00 $347.71 /for the first$10,000 and
$2.54 /for each additional$100 or fraction thereof
$50,000.01 to$100,000.00 $1,363.71 /for the first$50,000 and
$2.49 /for each additional$100 or fraction thereof
$100,000.01 and over $2,608.71 /for the first$100,000 and
$2.92 /for each additional$100 or fraction thereof
Plan Review 25%of permit fee 9/24/2002
Page 18
Department Revenue Source Fee or Charge Effective Date
Plumbing Fees 10/1/2009
(Commercial,Industrial,Residential,&Multi-Family)
New One&Two Family Dwellings
1 bath $312.70
2 bath $437.78
3 bath $500.32
Each additional bath/kitchen fixture $25.02
Site Utilities
Catch basin or area drain $18.76
Drywell,leach line,or trench drain $18.76
Footing drain,first 100' $50.03
Each additional 100'or part thereof
(footing drain) $37.52
Manufactured home utilities $50.03
Manholes $18.76
Rain drain connector $18.76
Sanitary sewer,first 100' $62.54
Storm sewer,first 100' $62.54
Water service,first 100' $62.54
Each additional 100'or part thereof
(sanitary,storm,water service) $37.52
Fixture or Item
Backflow preventer $31.27
Backwater valve $12.51
Clothes washer $25.02
Dishwasher $25.02
Drinking fountain $25.02
Ejectors/sump $25.02
Expansion tank $12.51
Fixture/sewer cap $25.02
Floor drain/floor sink/hub $25.02
Garbage disposal $25.02
Hose bib $25.02
Ice maker $12.51
Interceptor/grease trap $25.02
Medical gas(value:$ ) see table
Primer $12.51
Roof drain(commercial) $12.51
Sink/basin/lavatory $25.02
Solar units(potable water) $62.54
Tub/shower/shower pan $12.51
Page 19
Department Revenue Source Fee or Charge Effective Date
Urinal $25.02
Water closet $25.02
Water heater $37.52
Water Piping/DWV $56.29
Other: $25.02
Minimum permit fee $72.50
Plumbing plan review 25%of permit fee
Medical Gas Systems 9/24/2002
Total Valuation:
$1.00 to$5,000.00 $72.50 /minimum
$5,000.01 to$10,000.00 $72.50 /for the first$5,000 and
$1.52 /for each additional$100 or fraction
thereof,to and including$10,000.
$10,000.01 to$25,000.00 $148.50 /for the first$10,000 and
$1.54 /for each additional$100 or fraction
thereof,to and including$25,000.
$25,000.01 to$50,000.00 $379.50 /for the first$25,000 and
$1.45 /for each additional$100 or fraction
thereof,to and including$50,000.
$50,000.01 and over $742.00 /for the first$50,000 and
$1.20 /for each additional$100 or fraction thereof.
Restricted Energy 6/27/2000
Residential Energy Use,for all systems combined $75.00
Commercial Energy Use,for each system $75.00
Sanitary Sewer Inspection Fee 6/6/2000
Residential $35.00
Commercial $45.00
Industrial $75.00
Site Work/Grading Permit Fees 10/1/2009
Based on project valuation-See Building Permit Fees(New Commercial).
Page 20
Department Revenue Source Fee or Charge Effective Date
Miscellaneous Fees
Administrative fee to change issued permits,including but not limited to:
Address change(minimum charge-one-half hour) $90.00 per hour 7/1/2014
Contractor change(minimum charge-one-half hour) $90.00 per hour 7/1/2014
Process and handling fee to mail permits with plans $5.00 7/1/2014
Fee paid inspections for residential structures pursuant to Title 14,Chapter 16 6/27/2000
Single&Two Family Dwellings $100.00
Apartment Houses&Social
Care Facilities $160.00 /plus$7 for each dwelling unit in excess of 3
Hotels $160.00 /plus$5 for each dwelling unit in excess of 5
Information Processing&Archiving(IPA)Fee $2.00 /sheet larger than 11"X 17" 7/1/2010
$0.50 /sheet 11"X 17"and smaller
Investigation Fee $90.00 per hour(average cost) 1/1/2014
(minimum charge: one-half hour)
Phased Occupancy $200.00 6/27/2000
Permit or Plan Review Extension $90.00
Temporary Occupancy $90.00
Other Inspections&Fees:
1. Inspections outside of normal business hours 10/1/2009
(minimum charge-2 hours) $90.00 per hour
2 Reinspection fees $90.00 per hour 10/1/2009
3. Inspections for which no fee is specifically 10/1/2009
indicated(minimum charge:one-half hour) $90.00 per hour
4. Additional plan review required by changes, 10/1/2009
additions or revisions to plans(minimum
charge:one-half hour) $90.00 per hour
Note: A 12%surcharge fee as mandated h}'the State Building Codes Division is applied to all permit fees,investigation fees and inspection fees listed above.
Page 21
Department Revenue Source Fee or Charge Effective Date
COMMUNITY DEVELOPMENT-DEVELOPMENT SERVICES PLANNING
Accessory Dwelling Unit* 4-343 7/1/2022
$356 7/1/2023
Adjustment* $489 7/1/2022
$507 7/1/2023
Annexation(Quasi-Judicial)* $4,600 7/1/2022
$4,771 7/1/2023
Appeal
Type II to Hearings Officer $250 Fee set by state law 7/1/2011
Expedited Review(Deposit) $300 Fee set by state law 7/1/2016
Type III* $1,626 44, ,022
$4,798 7/1/2023
Comprehensive Plan Map Amendment(Quasi-judicial)* $ 86 7/1/2022
• $6,001 7/1/2023
Conditional Use* $9,158 7/1/2022
$9,498 7/1/2023
Development Code Review*
Residential**
Small Form Residential $123 Per dwelling unit 7/1/2022
(includes single detached houses,duplexes,triplexes, $128 7/1/2023
and attached accessory dwelling units)
Detached Accessory Dwelling Unit $123 7/1/2022
$128 7/1/2023
Rowhouse $123 Per dwelling unit 7/1/2022
$128 7/1/2023
Quad $400 Per Quad Development 7/1/2022
$415 7/1/2023
Cottage Cluster $300 ' . 7/1/2022
$311 Plus$78 per dwelling unit 7/1/2023
Courtyard Unit $300 7/1/2022
$311 Plus$78 per dwelling unit 7/1/2023
Accessory structures and additions that do not add dwelling units $123 7/1/2022
$128 7/1/2023
**Residential development code review applies to new construction of,and additions to,dwelling units and structures including, but not limited to,garages,carports,porches,patios,decks,storage
sheds,awnings,steps and ramps
Page 22
Department Revenue Source Fee or Charge Effective Dat4
Non-Residential and Mixed-Use
$507 7/1/2023
Tenant Improvements in Existing Development
Project Valuation under$5,000 $0 7/1/2022
Project Valuation$5,000-$74,999 $1-3 7/1/2022
$128 7/1/2023
Project Valuation$75,000-$149,999 $307 7/1/2022
$318 7/1/2023
Project Valuation$150,000 and more $489 7/1/2022
$507 7/1/2023
Director Determination* $1,004 7/1/2022
$1,041 7/1/2023
Downtown Development Review*
Type I $1-618 7/1/2022
$174 7/1/2023
Type II
Under$1,000,000 $2,31 Plus 0.004 x project valuation 7/1/2022
$2,430 7/1/2023
$1,000,000 and more $7240 , - ,... -. 7/1/2022
$7,509 7/1/2023
Extension*
TypeI $489 7/1/2022
$507 7/1/2023
Type II X004 7/1/2022
$1,041 7/1/2023
Home Occupation Permit*
Type I $19 7/1/2022
$175 7/1/2023
Type II $111 7/1/2022
$426 7/1/2023
Land Partition*
2 Lotsr$5-509 7/1/2022
$5,713 7/1/2023
3 Lots $6,627 7/1/2022
$6,873 7/1/2023
Expedited $7,734 7/1/2022
$8,021 7/1/2023
Final Plat $1,539 7/1/2022
$1,596 7/1/2023
Page 23
Department Revenue Source FeeChaise
Lot Line Adjustment/Lot Consolidation* $1,004 7/1/2022
$1,041 7/1/2023
Marijuana Facility Permit* $9.7-8 7/1/2022
$1,014 7/1/2023
Miscellaneous Land Use Review*
Adequate Public Facilities Exception(inside River Terrace) $1,004 7/1/2022
$1,041 7/1/2023
Historic Resource Designation/Removal of Designation $7,160 7/1/2022
$7,426 7/1/2023
Historic Resource Construction/Alteration/Demolition $1,074 7/1/2022
$1,114 7/1/2023
Transportation Mitigation(inside Tigard Triangle) $1, 04 7/1/2022
$1,041 7/1/2023
Modification*
Type I $414 7/1/2022
$426 7/1/2023
Type II $1,422 7/1/2022
$4,586 7/1/2023
Planned Development*
Consolidated Concept and Detailed Plan $12,738 7/1/2022
$13,211 7/1/2023
With Land Division(in lieu of Subdivision or Land Partition Fee) lis-X104-per lot 7/1/2022
Plus$108 per lot 7/1/2023
Concept Plan $12,738 7/1/2022
$13,211 7/1/2023
Detailed Plan $1,122 7/1/2022
$4,586 7/1/2023
With Land Division(in lieu of Subdivision or Land Partition Fee) Plus$101 per lot 7/1/2022
Plus$108 per lot 7/1/2023
Pre-Application Conference*
Type II $414 7/1/2022
$426 7/1/2023
Type 111 $986 7/1/2022
$1,023 7/1/2023
Project/Plat Name Change* $ 64 7/1/2022
$582 7/1/2023
Sensitive Lands Review*
Type I $1004 7/1/2022
$1,041 7/1/2023
Type II $1,399 7/1/2022
$4,562 7/1/2023
Page 24
Department Revenue Source F
Type III $4,751 7/1/2022
$4,927 7/1/2023
Sign Permit*
New or Modified Sign $2-7-6 7/1/2022
$286 7/1/2023
Temporary Sign $87 7/1/2022
$90 7/1/2023
Site Development Review*
Type I
Under 13 Dwelling Units $489 7/1/2022
$507 7/1/2023
13 Dwelling Units and over $1,004 7/1/2022
$1,041 7/1/2023
Type II
Residential Under 13 Dwelling Units $1,200 7/1/2022
$1,245 7/1/2023
Residential 13 Dwelling Units and over $2;000 7/1/2022
$2,074 7/1/2023
Non-Residential and Mixed Use
Under$1,000,000 $7,769 7/1/2022
$8,057 7/1/2023
$1,000,000 and over $1-0,098 Plus$6 per each$10,000 over$1,000,000 7/1/2022
$10,470 7/1/2023
Subdivision*
Preliminary Plat $12,196 Pitts--$4444-per-ler 7/1/2022
$12,648 Plus$145 per lot 7/1/2023
Expedited Preliminary Plat $10,281 101 per-let 7/1/2022
$10,666 Plus$145 per lot 7/1/2023
Final Plat $3,102 7/1/2022
$3,217 7/1/2023
Sublot Plat*
Preliminary Sublot Plat S63000 Plus--$104-peg-lot 7/1/2022
$6,223 Plus$145 per lot 7/1/2023
Final Sublot Plat $1,500 7/1/2022
$1,556 7/1/2023
Page 25
Department Revenue Source orcharile,,,,,. Effective Date.
Temporary Use Permit*
Type I 16489 7/1/2022
$507 7/1/2023
Special Exemption:Non-Profit Organization $0 7/1/2022
Special Rate: Mixed Use-Central Business District Zone
1st Temporary Use in a Calendar Year 16489 7/1/2022
2nd Through 5th Temporary Use With Substantially the $507 7/1/2023
Same Site Plan Within A Calendar Year 168,7 7/1/2022
$90 7/1/2023
Urban Forestry*
Plan Modification $964 Plus44444-per lot 7/1/2022
$1,000 Plus$145 per lot 7/1/2023
Discretionary Plan Review(with concurrent Type III review) $604 Plus-$101 per-let 7/1/2022
$626 Plus$145 per lot 7/1/2023
Discretionary Plan Review(without concurrent Type III review) $3,721 7/1/2022
$3,859 7/1/2023
Zoning Map Amendment*
Quasi-Judicial 4-57786 7/1/2022
$6,001 7/1/2023
Zoning Analysis Letter(Detailed)* $1,004 7/1/2022
$1,041 7/1/2023
Zoning Inquiry Letter(Simple)* $117 7/1/2022
5152 7/1/2023
Per 03 59,fee If ad/acted yearly based on the Cons/m.1Jon Cost Index for the City of Seattle as published in the April issue of Engineering News Record.
Page 26
Department Revenue Source Fee or Charge INIPNIPMINNWWWWWWIRL, Effective D
COMMUNITY DEVELOPMENT- MISCELLANEOUS FEES&CHARGES
C' n $10 7/1/2011
GIS Maps
8 142"x 11" Nen-Aerial Nen-Aerial3250 7/1/2011
Aerial $4 7/1/2011
11"x 17" Non rial $5 7/1/2011
Aerial 7/1/2011
17"x 22" Non Aerial 314 7/1/2011
$15 7/1/2023
Aerial $15 7/1/2011
$20 7/1/2023
34"x 44" Non Aerial $25 7/1/2011
$35 7/1/2023
Aerial $30 7/1/2011
$41 7/1/2023
Custom Maps Staff Hourly Rate 7/1/2011
Information Processing&Archiving(IPA)Fee
Temporary Sign $5 7/1/2010
Type I Review $18 7/1/2010
Type II Review $175 7/1/2010
Type III Review $200 7/1/2010
Type IV Review $200 7/1/2010
Oversize Load Permit $200 7/1/2005
Planimetrie-Maps
$5 7/1/2011
Maar
7/1/2011
Public Notice Sign 8350 7/1/2018
$7.50 7/1/2023
Renotification for Hearing Postponement* $528 7/1/2022
$548 7/1/2023
Page 27
Department Revenue Source Fee or Charge Effective Date
Retrieval of Materials Confiscated in ROW
Lawn and A-board signs $40 per sign 7/1/2010
Other signs and materials(based on size and value) City Manager's Discretion(per TMC 6.03 Ord 12-02) 7/1/2010
Tigard Comprehensive Plan $75 7/1/2011
Tigard Transportation System Plan $75 7/1/2011
*Per Ard Res 03-59,fee is adjusted yearly based on the Construction Cort Index for the City of Seattle as published in the April issue of-Engineering Near Record.
Page 28
Department Revenue Source Fee or Charge Wed11 Dao
COMMUNITY DEVELOPMENT-MISCELLANEOUS DEVELOPMENT
Fee in Lieu of Sewer Based on actual cost of sewer connection, 1998
if sewer was available
(MU-CBD zone only) the current Washington County Assessor-determined
real market value of the land (not improvements)by 10%
Sanitary Sewer Connection Fee 56,625 /DU or DUE 7/1/2022
(This fee is determined by Clean Water Services. S6,824 7/1/2023
The City of Tigard receives 3.99%of fees collected.)
Water Quality Facility Fee(Fee set by Clean Water Services)111
(City receives 100%of fees collected)
Residential Single Family $288 /unit 7/1/2022
$297 7/1/2023
Commercial&Multi-family $288 /2,640 sq.ft of additional impervious surface 7/1/2022
$29' 7/1/2023
Water Quantity Facility Fee(Fee set by Clean Water Services)111
(City receives 100%of fees collected)
Residential Single Family $36.3 /unit 7/1/2022
$363 7/1/2023
Commercial&Multi-family $353 /2,640 sq.ft of additional impervious surface 7/1/2022
$363 7/1/2023
Metro Construction Excise Tax 7/1/2006
0.12%of building permits for projects
(City will retain 5%for administrative expenses) with a total valuation of$100,001 or more;
(Tax set by Metro,but collected by cities) not to exceed$12,000.
School District Construction Excise Tax
(City will retain 4%for administrative expenses)
(Tax set by school districts based on ORS 320.170-189 and collected by cities)
Beaverton School District�1 $1.15 /sq. ft.residential construction 7/1/2022
$1.56 7/1/2023
$0:72 /sq. ft.non-residential construction 7/1/2022
$0.78 7/1/2023
$36,100 Non-residential maximum per building permit or 7/1/2022
$39,100.00 per structure,whichever is less 7/1/2023
Tigard-Tualatin School District(TTSD)121 $1.45 /sq. ft.residential construction 7/1/2022
$1.56 7/1/2023
$0.72 /sq.ft.non-residential construction 7/1/2022
Page 29
Department Revenue Source Fee or Cham,, Effective Date
COMMUNITY DEVELOPMENT-MISCELLANEOUS DEVELOPMENT
$0.78 7/1/2023
$36400 Non-residential maximum per building permit or 7/1/2022
$39,100 per structure,whichever is less 7/1/2023
Tigard Affordable Housing Construction Excise Tax* (City will retain 4%for administrative expenses) 1/1/2020
Residential 1% /Permit Valuation
Commercial 1% /Permit Valuation
*Permits of value less than$50,000 and other exemptions may apply per TMC 3.90
Small Wireless Facility Planning Review Fee $150 per application,up to 5 batched applications,then$45 per application over 5 2/5/2019
Type II(Major)Modification Project Valuation Thresholdt3'
$6,371-64 7/1/2022
$65,513 7/1/2023
Urban Forestry131
Hazard Tree Dispute Resolution Fee $2-16 Pl -$61 each additional w_e 7/1/2022
$245 Plus$63 each additional tree 7/1/2023
In Lieu of Planting Fees(Planting&3 Year Maintenance)
Street Tree $768 per tree 7/1/2022
$796 7/1/2023
Open Grown Tree $768 per tree 7/1/2022
$796 7/1/2023
Stand Grown Tree $547 per tree 7/1/2022
$567 7/1/2023
Tree Removal Permit
Simple $0 7/1/2022
Complex[4] $420 per tree 7/1/2022
$436 7/1/2023
Tigard Triangle Distnct Tree Removal Fee $3713 per-ewer-ineh-DBH 7/1/2022
(only applies in TMU Zone when removal approved through an adjustment)
$393 per caliper inch DBH • 7/1/2023
Tree Canopy Fee $2.95 per square foot of tree canopy 3/1/2013
Urban Forest Inventory Fees
Open Grown Tree $ 7/1/2022
$220 Plus$29 each additional tree 7/1/2023
Stand of Trees $279 7/1/2022
$289 Plus$46 each additional stand 7/1/2023
Page 30
Department Revenue Source Fee or ChargaIIIIIIIIMPRIIIMIMIPMIMPIMMIME Effectiv
COMMUNITY DEVELOPMENT-MISCELLANEOUS DEVELOPMENT
Retroactive Tree Removal Permit Penalty $250 Minimum 7/1/2023
Tree Establishment Bond(Planting&Early Establishment)
Open Grown Tree in Land Use
Applications other than Subdivisions or
Land Partitions $6M per tree 7/1/2022
$654 7/1/2023
Stand Grown Tree in Land Use
Applications other than Subdivisions or
Land Partitions $501- per tree 7/1/2022
$520 7/1/2023
Vacation(Streets and Public Access)I31
Deposit $3,712 Plus actual costs 7/1/2022
$3,850 7/1/2023
Vertical Housing Development Zone131
Precertification Fee $1,010 7/1/2022
$1,047 7/1/2023
Final Certification Fee $1,516 7/1/2022
$1,572 7/1/2023
Annual Project Monitoring Fee $379 7/1/2022
$393 7/1/2023
[1] Thu fee is determined by Clean Nater Services.
[2] BSD and TTSD Construction Excise Tax will he set by the school district in June lids. Staff is authorized to update the schedule for the fees and charges set by otherjurirdictions.
Page 31
Department Revenue Source Fee or Charge Effective Date
PUBLIC WORKS-DEVELOPMENT ENGINEERING
Addressing Assignment Fee $50.00 /lot or suite(up to first 20) 8/1/2017
$25.00 /lot or suite(for 21 and greater) 8/1/2017
Early Addressing Request $250.00 Prior to Plat Approval 8/1/2017
Encroachments
Encroachment Permit-Furnishings $25.00 7/1/2020
Encroachment Permit $250.00 7/1/2020
Encroachment Permit Appeal $250.00 11/1/2018
Erosion Control Inspection Fee
With Development
Construction Cost Estimate$0-$25,000 $80.70 7/1/2014
Construction Cost Estimate$25,001-$50,000 $107.60 7/1/2014
Construction Cost Estimate$50,001-$100,000 $161.40 7/1/2014
Construction Cost Estimate over$100,000 $161.40 plus$75 per$100,000 or fraction thereof 7/1/2014
exceeding the first$100,000
Without Development
0-0.99acres $322.80 7/1/2014
lacre or greater $322.80 plus$150 per acre or fraction thereof 7/1/2014
Reinspection Fee $96.84 per hour with a minimum of 1 hour 7/1/2014
Plan Check included in inspection fee 7/1/2014
Plan Resubmittal Review $96.84 per hour with a minimum of one-half hour 7/1/2014
Fee In Lieu of Stormwater Quality(Fee set by Clean Water Services)ltl
$1.00 /per sq.ft.of unmanaged impervious area 8/1/2017
Fee In Lieu Of Hydromodification(Fee set by Clean Water Services)11l
$1.00 /per sq. ft.of unmanaged impervious area 10/1/2019
Fee In Lieu Of Stormwater Quality and Hydromodification(Fee set by Clean Water Services)111
$1.50 /per sq.ft.of unmanaged impervious area 10/1/2019
Page 32
Department Revenue Source Fee or Charge Effective Date
Fee In Lieu Of Undergrounding
Utility Portion(one or more,accumulative):
Electrical $86.00 /linear foot 7/1/2022
Cable $16.00 /linear foot 7/1/2022
Telecommunication $26.00 /linear foot 7/1/2022
Trench Cost(applied only once,per lineal foot) $39.00 /linear foot 7/1/2022
Other Inspections&Fees
1 Inspections outside of normal business
hours (minimum charge-2 hours) 135.00 per hour 7/1/2019
2 Inspections for which no fee is specifically
indicated(minimum charge-one-half
hour) 135.00 per hour 7/1/2019
3 Additional plan review required by
changes,additions or revisions to plans
(minimum charge-one-half hour) 135.00 per hour 7/1/2019
4 Additional 0.5%added to PFI Plan Review
Fee for each additional technical review
after the third PFI plan review 0.5%of estimated cost of public improvements with a$300 minimum 7/1/2022
Public Facility Improvement-LIDA*Permit $300.00 /equivalent dwelling unit(EDU) 8/1/2017
for review and inspection of LIDA on single lots
*-LIDA+Low Impact Development Approaches per Clean Water Services Design and Construction Standards
Public Facility Improvement Permit 2%plan review plus 7/1/2009
5%of estimated cost of public improvement with a$300.00 minimum
Advanced deposit of 10%of the above or minimum of$300.00 7/1/2005
$0.00 Sidewalk repair or replacement up to 20 linear feet 7/1/2021
Regional Stormwater Management Charge(RSMC) (Fee set by Clean Water Services)(I1
RSMC Unit Rate per cubic foot of requiredvolume management 7/1/2022
i 7/1/2023
Residential RSMC=Lot size(sf)x percent impervious design factor x 0.131 cf/sf x RSMC unit rate*
Multi-family&non-residential RSMC =Actual impervious area(sf)x 0.131 cf/sf x RSMC unit rate*
*Percent impervious design factor and RSMC unit rate per Clean Water Services Rates and Charges
Reimbursement District Application Fee $300.00 1/27/1998
Page 33
Department Revenue Source Fee or Charge Effective Date
Reimbursement District Fee Not to Exceed$6,000.00 unless reimbursement fee exceeds$15,000.00. 7/1/2001
Any amount over$15,000.00 shall be reimbursed by the owner;$6,000.00 limit
valid for only 3 years from Council approval of district cost.
Streetlight Energy&Maintenance Fee Based upon PGE Schedule #95 Option"B" for the first two years costs 1/27/2020
Tigard Triangle Mixed Use Zone—Fees and Charges
Transportation Impact Study Actual Cost of Study by City Transportation Consultant 7/1/2018
Transportation Fee in Lieu of Construction
Estimated Cost of Improvements by City Engineer(determination based on
an estimate to construct the required improvements using the average cost
of the most recent capital improvement project itemized bid prices)
7/1/2018
Plan Check Meeting $300.00 /conference 7/1/2018
111 This fee is determined by Clean Water Servicer.
Page 34
Department Revenue Source Fee or Charge Effective Date
PUBLIC WORKS-UTILITIES
Booster Pump Charge
Customer Classification
Single-Family Residential $2.03 /monthly 7/1/2021
Multi-Family Residential,Commercial,Industrial,
Irrigation by Meter Size(diameter inches)
5/8 x 3/4 $1.49 /monthly 7/1/2021
3/4 x 3/4 $2.24 /monthly 7/1/2021
1 $3.74 /monthly 7/1/2021
1.5 $7.47 /monthly 7/1/2021
2 $11.96 /monthly 7/1/2021
3 $23.91 /monthly 7/1/2021
4 $37.36 /monthly 7/1/2021
6 $74.73 /monthly 7/1/2021
8 $119.56 /monthly 7/1/2021
10 $171.87 /monthly 7/1/2021
12 $252.21 /monthly 7/1/2021
Customer Charge
(Basic fee charged to customers to have the
City deliver water.)
Customer Classification
Single-Family Residential S32.31 fly 7/1/2022
$32.95 /monthly 7/1/2023
$33.61 /monthly 7/1/2024
$33.95 /monthly 7/1/2025
Multi-Family Residential,Commercial,Industrial,
Irrigation by Meter Size (diameter inches)
5/8 x 3/4 832.31 4-monthly
$32.95 /monthly 7/1/2023
$33.61 /monthly 7/1/2024
$33.95 /monthly 7/1/2025
3/4 x 3/4 7/1/2022
$47.47 /monthly 7/1/2023
$48.42 /monthly 7/1/2024
Page 35
$48.90 /monthly 7/1/2025
1 $72.98 w 7/1/2022
$73.93 /monthly 7/1/2023
$75.41 /monthly 7/1/2024
$76.16 /monthly 7/1/2025
1.5 $191.41 -l+►tr>oltly 7/1/2022
$195.24 /monthly 7/1/2023
$199.15 /monthly 7/1/2024
$201.14 /monthly 7/1/2025
2 $310.57 l 7/1/2022
$316.78 /monthly 7/1/2023
$323.12 /monthly 7/1/2024
$326.35 /monthly 7/1/2025
3 $611.31 -,' til =4-44-='i i•'
$623.54 /monthly 7/1/2023
$636.01 /monthly 7/1/2024
$642.37 /monthly 7/1/2025
4 51,161.21 fly 7/1/2022
$1,184.44 /monthly 7/1/2023
$1,208.13 /monthly 7/1/2024
$1,220.21 /monthly 7/1/2025
6 $1,302.02 -Ftientl-Ay 7/1/2022
$1,328.06 /monthly 7/1/2023
$1,354.62 /monthly 7/1/2024
$1,368.17 /monthly 7/1/2025
8 $2,033.50,/--efit v 7/1/2022
$2,074.17 /monthly 7/1/2023
$2,115.66 /monthly 7/1/2024
$2,136.81 /monthly 7/1/2025
Page 36
Department Revenue Source Fee or Charge., M.. Effective D,
10 $3,752.311eci 7/1/2022
$3,827.36 /monthly 7/1/2023
$3,903.90 /monthly 7/1/2024
$3,942.94 /monthly 7/1/2025
12 $5,309.274-monthly 7/1/2022
$5,415.45 /monthly 7/1/2023
$5,523.76 /monthly 7/1/2024
$5,579.00 /monthly 7/1/2025
Final Notification Process Fee $10.00 /per instance 10/19/2016
Fire Hydrant Flow Test $400.00 /test 7/1/2018
Fire Hydrant Usage-Temporary
3"hydrant meter deposit* $650.00 9/1/2002
*Deposit is refundable if returned in good condition
Hook-up service $50.00 2/27/2001
Continued use $50.00 /month 2/27/2001
Consumption 00 cubic feet of wate_ 7/1/2022
$14.11 /100 cubic feet of water 7/1/2023
$16.51 /100 cubic feet of water 7/1/2024
$19.32 /100 cubic feet of water 7/1/2025
Fire Rates (Sprinklers)
6" or smaller -'1/2022
$30.91 /monthly 7/1/2023
$36.17 /monthly 7/1/2024
$42.31 /monthly 7/1/2025
8"or larger $31.95-/moothly 7/1/2022
$40.89 /monthly 7/1/2023
$47.84 /monthly 7/1/2024
$55.97 /monthly 7/1/2025
Fire Service Connection* /+ 12%fee based on construction costs. 7/1/2022
Z I', 7/1/2023
*Updated annually based on Seattle CCI per Apri122,2013 consultant study.
Page 37
Department Revenue Source Fee or Charge Effective Date
Meter Disconnection Actual labor and material costs+ 10% 9/1/2002
Meter Installation Fees
5/8"x 3/4"Meter $405.00 7/1/2018
3/4"x 3/4"Meter $463.00 7/1/2018
1"Meter $636.00 7/1/2018
1 1/2"Meter $983.00 7/1/2018
2"Meter $1,272.00 7/1/2018
3"or more Meter Actual labor&materials + 10% 9/1/2011
Meter Out-of-Order Test Meter calibration cost+actual labor 9/1/2002
and material costs+ 10%
Sanitary Sewer Service(Fee set by Clean Water Services)
(City receives 20%of fees collected)
Base Charge $34.36 /dwelling unit/month 7/1/2022
$35.73 7/1/2023
Use Charge $2.27 /100 cubic feet/month for 7/1/2022
$2.36 individual customer winter average 7/1/2023
Tigard Sewer Surcharge* $2.95 /dwelling unit/month 7/1/2022
*Updated annually based on Seattle CCI. $3.06 7/1/2023
Service Installation Fees
Single Trench-Single Residential Service $3,815.00 includes labor&materials 7/1/2018
1 1/2"Meter and greater Actual labor and material costs + 10"/o 10/1/2011
Storm and Surface Water(Fee set by Clean Water Services)
(City retains 75%of Service Charge fees collected)
(City retains 100%of its Surcharge fees collected)
Service Charge /ESU/month 7/1/2022
Sin ;=, 7/1/2023
Tigard Stormwater Surcharge $5.50 /ESU/month 1/1/2021
Water After Hours Emergency Turn On Service* $65.00 7/1/2017
*Service Hours Outside of Monday through Friday 8:00 am-5:00 pm
Water Bacteriological Quality Testing
Cost per test $80.00 7/1/2018
Water Disconnection Charge for Non-payment
During business hours $50.00 2/27/2001
Page 38
Department Revenue Source Fee or Charge Effective Date
Water Line Construction-New Development 12%of Actual Cost 2/27/2001
Water Main Extension
Designed and installed by others 12%of Actual Cost 9/1/2002
Water Usage Charges
Residential
Tier 1 -fin 1-t re.- U/2022
$4.59 /100 cubic feet of water 7/1/2023
$4.68 /100 cubic feet of water 7/1/2024
$4.77 /100 cubic feet of water 7/1/2025
Tier 2 $66 /100 cubic feet of water 7/1/2022
$6.69 /100 cubic feet of water 7/1/2023
$6.83 /100 cubic feet of water 7/1/2024
$6.97 /100 cubic feet of water 7/1/2025
Tier 3 $7.52 /100 cubic feet of water
$7.67 /100 cubic feet of water 7/1/2023
$7.82 /100 cubic feet of water 7/1/2024
$7.98 /100 cubic feet of water 7/1/2025
Multi-Family
Uniform Rate :4§9 /100 cubic feet of a, 7/1/2022
$4.82 /100 cubic feet of water 7/1/2023
$5.01 /100 cubic feet of water 7/1/2024
$5.21 /100 cubic feet of water 7/1/2025
Commercial
Tier I $4.53 " -* -- - - 7/1/2022
$4.59 /100 cubic feet of water 7/1/2023
$4.66 /100 cubic feet of water 7/1/2024
$4.71 /100 cubic feet of water 7/1/2025
Tier 2 $6,(44 /100 cubic feet of water
$6.70 /100 cubic feet of water 7/1/2023
$6.80 /100 cubic feet of water 7/1/2024
$6.86 /100 cubic feet of water 7/1/2025
Tier 3 $7.54 00 cubic f et ofwate_ 7/1/2022
$7.65 /100 cubic feet of water 7/1/2023
$7.77 /100 cubic feet of water 7/1/2024
$7.85 /100 cubic feet of water 7/1/2025
Page 39
Department Revenue Source Fee or Charge Effective Date
Industrial Uniform Rate $6.21 /monthly 1/1/2021
Irrigation Uniform Rate $8.81 /monthly 1/1/2021
Tiered Rate Structure Thresholds(100 cubic feet of water)
Customer Classification
Single-Family Residential Tier 1 6 ci 7/1/2021
Tier 2 15 ci 7/1/2021
Tier 3 over 15 c 7/1/2021
Multi-Family Residential,Commercial,Industrial,
Irrigation by Meter Size(diameter inches)
5/8 x 3/4 Tier 1 6 ccf
Tier 2 15 ccf
Tier 3 over 15 ccf
3/4 x 3/4 Tier 1 9 ccf
Tier 2 22 ccf
Tier 3 over 22 ccf
1 Tier 1 16 ccf
Tier 2 40 ccf
Tier 3 over 40 ccf
1.5 Tier 1 48 ccf
Tier 2 120 ccf
Tier 3 over 120 ccf
2 Tier 1 78 ccf
Tier 2 195 ccf
Tier 3 over 195 ccf
3 Tier 1 137 ccf
Tier 2 344 ccf
Tier 3 over 344 ccf
4 Tier 1 282 ccf
Tier 2 705 ccf
Tier 3 over 705 ccf
6 Tier 1 300 ccf
Page 40
Department Revenue Source Fee or Charge Effective Date
Tier 2 750 ccf
Tier 3 over 750 ccf
8 Tier 1 480 ccf
Tier 2 1,200 ccf
Tier 3 over 1,200 ccf
10 Tier 1 938 ccf
Tier 2 2,345 ccf
Tier 3 over 2,345 ccf
12 Tier 1 1,350 ccf
Tier 2 3,376 ccf
Tier 3 over 3,376 ccf
Street Maintenance Fee (TMC 15.20)*
Monthly Residential Rate-Single and Multi-Family 16-7% /unit 7/1/2022
$8.52 7/1/2023
Monthly Non-Residential Rate $2r6-l- /per min required parking space 7/1/2022
$2.79 7/1/2023
Staff Review No Charge
City Council Written Appeal Filing Fee $300.00
*Street Maintenance Fee is adjusted by a 2.-year rolling average of 85%Seattle Construction Cost Index and 15%Oregon Monthly Asphalt Cement Material Price Index. However based on the TMC,a floor of two
percent and a ceiling of seven percent will be applied.
Tigard Transportation Utility Fee(River Terrace) $5.00 /month 10/1/2016
Meter Maintenance Fee(TMC 12.01) $50.00 per required service 7/1/2018
Page 41
��6i V i'_ ,si,.�`"i v � 'A: ,'1� a1,C. ", a"w , :.,,�,,,r '�t ,71,:3,,.,,, x, vm!V!dh0, 4 y0,ia i i.,.?# ; -'. ii ':",
PUBLIC WORKS-PARKS&RECREATION
Community Garden Plot Rental
Large(>120 sq.ft.) $60.00 /year 8/1/2017
Medium(60-119 sq.ft.) $40.00 /year 7/1/2018
Small(<60 sq.ft.) $30.00 /year 8/1/2017
Non-resident fee(additional Metzger School Park) $5.00 /plot/year 8/1/2017
Park Reservation Fees
Application Fee Resident $25.00 /per event 7/1/2010
Non-Resident $50.00 /per event 7/1/2010
Rental Change Fee $15.00 /per event 7/1/2011
Organized Group Event Processing Fee $50.00 /per event 7/1/2012
Event Monitor $15.00 /hour 7/1/2012
Special Use/Alcohol Permit Fee (Fee assessed at time of reservation) $25.00 /per event 7/1/2010
Shelter Rental Fees(2 hour minimum)
Shelter#2 Resident $35.00 /hour 7/1/2012
Non-Resident $70.00 /hour 7/1/2012
Shelter#1,#3,#4,Bishop/Scheckla
Pavilion,&Summerlake Resident $25.00 /hour 7/1/2012
Non-Resident $50.00 /hour 7/1/2012
Soccer/Ball Field Rental Fee(2 hour minimum)
Resident $10.00 /hour 7/1/2010
Non-Resident $20.00 /hour 7/1/2010
Court(Sports)Rental Fee Resident $10.00 /hour 7/1/2019
Non-Resident $20.00 /hour 7/1/2019
Fanno Creek House Rental Resident $55.00 /hour 8/1/2017
Non-Resident $95.00 /hour 8/1/2017
Resident $385.00 /day 7/1/2018
Non-Resident $665.00 /day 7/1/2018
Dirksen Nature Park
Meeting Room Resident $45.00 /hour 8/1/2017
Non-Resident $75.00 /hour 8/1/2017
Resident $315.00 /day 7/1/2018
Non-Resident $525.00 /day 7/1/2018
Page 42
iii, ........,,,... zK,_n,r , . ._a , Witi,tea t.:m..., —,.a .W—,.,,,�
Classroom Resident $40.00 /hour 8/1/2017
Non-Resident $70.00 /hour 8/1/2017
Resident $280.00 /day 7/1/2018
No m $500.00 a 8/1/2017
Non-Resident $490.00 /day 7/1/2018
(If this is 2nd Room-50%discount)
Room Rental Monitor For Hours Outside City Business Hours $15.00 /hour 8/1/2017
Refundable Security/Cleaning Deposit May be required for some events to mitigate Not to exceed$500 7/1/2018
possible cleanup and/or damages.
Special Event Permits
Special Event Permit Fee First 3 hours $25.00 0 to 25 people 11/12/2019
$75.00 26 to 100 people 11/12/2019
$175.00 101 to 200 people 11/12/2019
$275.00 201 to 500 people 11/12/2019
$475.00 501 to 2,000 people 11/12/2019
$1,000.00 2,001 and more 11/12/2019
Each Additional Hour $10.00 0 to 25 people 11/12/2019
$25.00 26 to 100 people 11/12/2019
$55.00 101 to 200 people 11/12/2019
$90.00 201 to 500 people 11/12/2019
$155.00 501 to 2000 people 11/12/2019
$330.00 2,001 and more 11/12/2019
Special Event Permit Appeal $100.00 8/13/2019
Downtown Special Events Permits
Downtown Special Event Application Fee $50.00 0 to 500 people 7/1/2023
$150.00 501 people or more 7/1/2023
Hourly Fee:2-hour minimum-maximum 6-hour block
Universal Plaza Resident private event(no public invite) $150.00 /hour 7/1/2023
Non-resident private event(no public invite) $300.00 /hour 7/1/2023
Resident public event $300.00 /hour 7/1/2023
Non-resident public event $600.00 /hour 7/1/2023
Rotrary Plaza Resident private event(np public invite) $100.00 /hour 7/1/2023
Non-resident private event(no public invite) $200.00 /hour 7/1/2023
Page 43
Department Revenue Source s; v, :;;. _ 17ww hr Effectiv
Resident public event $200.00 /hour 7/1/2023
Non-resident public event $400.00 /hour 7/1/2023
Liberty Park
Resident private event(no public invite) $75.00 /hour 7/1/2023
Non-resident private event(no public invite) $150.00 /hour 7/1/2023
Resident public event $150.00 /hour 7/1/2023
Non-resident public event $300.00 /hour 7/1/2023
Daily Fee:Public events over 10 hours
Universal Plaza Resident public event $3,000.00 /day 7/1/2023
Non-resident public event $6,000.00 /day 7/1/2023
Rotary Plaza Resident public event $1,000.00 /day 7/1/2023
Non-resident public event $2,000.00 /day 7/1/2023
Liberty Park Resident public event $750.00 /day 7/1/2023
Non-resident public event $1,500.00 /day 7/1/2023
Refundable Security/Cleaning Deposit May be required for some events to mitigate possible cleanup and/or
damages per application
Universal Plaza Not to exceed$250 7/1/2023
Rotary Plaza Not to exceed$250 7/1/2023
Liberty Park Not to exceed$250 7/1/2023
Downtown District Event (does not include required deposits for parks if included in Not to exceed$1,500 7/1/2023
the event)
Special Use/Alcohol Permit Fee (Fee assessed at time of reservation) $25.00 /per event 7/1/2023
Road Closure Fee
Intersection closure or restriction per intersection $175.00 /day 7/1/2023
three or more intersections $525.00 /day 7/1/2023
Page 44
Department Revenue Source Fee or Charge via
PUBLIC WORKS-PARKS
Parks&Recreation Fee(TMC 3.75)
Monthly Residential Rate-Single and Multi-Family /equivalent dwelling unit 7/1/2022
5,B.G 3 7/1/2023
Monthly Non-Residential Rate /equivalent dwelling unit 7/1/2022
S8.6; 7/1/2023
Reduction for Qualified Low Income Single Family 50% 4/1/2016
Notes:
1 Commercial EDU Calculation(rounded to nearest whole EDU):
(Billed Parking Stalls from Street Maintenance Fee*0.76 Jobs Per Stall)/15 EDU Factor =EDUs
2 Industrial EDU Calculation(rounded to nearest whole EDU):
(Billed Parking Stalls from Street Maintenance Fee* 1.19 Jobs Per Stall)/15 EDU Factor =EDUs
Calculation of the annual Park Maintenance Fee Index(from FCS Group report"Tigard Parks Maintenance Fee:
Report to Council for January 12,2016 Public Hearing"
Cost Center Annual Rate Weight
Personnel 4.80% 0.60
Services/Utilities 3.00% 0.25
Materials/Internal Services 4.20% 0.15
Annual Index(Weighted Average) 4.26%
TMC 3.75.050.D authorizes the establishment of a program to reduce the Park Maintenance Fee for low income individuals
responsible for paying the utility bill.
The reduction will last for 12 billing cycles after which the fee reduction will end or the responsible party can reapply
To Qualify for the reduction,the responsible party:
1 Must be the individual(s)on the utility bill
2 Provide documented proof of income such as most recent tax statement or W-2.
3 Have an income at,or below,50%of the Median Income for Oregon as set by the US Department of Housing
and Urban Development(HUD).
Page 45
Revenue Source Fee or Charge Effective Date
Solid Waste Collection Rates
Residential Cart Collections
Recycling only(carts&food waste and yard debris cart) 1/1/2022
$15.33 1/1/2023
(recycling cart only) 3 102
$8.03 1/1/2023
(food waste and yard debris only) $6.95 1/1/2022
$7.30 1/1/2023
Mini cart(20 gal)with food waste and yard debris $30.14 1/1/2022
$30.79 1/1/2023
Food waste and yard debris exempt $27.75 1/1/2022
$27.75 1/1/2023
Cart(32 gal)with food waste and yard debris $33.79 1/1/2022
$34.14 1/1/2023
Food waste and yard debris exempt $30.98 1/1/2022
$30.98 1/1/2023
Cart(60 gal)with food waste and yard debris $39.16
$39.51 1/1/2023
Cart(90 gal)with food waste and yard debris $44.04 1/1/2022
$44.39 1/1/2023
Recycle Plus Program(Per month) $2.50 5/1/2023
Recycle plus program(Per pick up) $9.25 5/1/2023
On-call service(mixed waste,recycling cart,food waste and yard debris) 1/1/20/-
$14.13
/1/20'$14.13 1/1/2023
Overload Fee(Small Extra Bag) '2
$2.32 1/1/2023
Commercial Cart Collections
20 gallon $30.11 1/1/2022
$30.44 1/1/2023
32 gallon $33.79 1/1/2022
$33.79 1/1/2023
Page 46
60 gallon $39.16 111/2022
$39.16 1/1/2023
90 gallon $4444 1/1/2022
$44.04 1/1/2023
Weekly Collection Frequency
Every other
Week One Two Three Four Five
One yard $75.33 $1-2,341- $232.04 $336,24 $440.40 $511.81 1/1/2022
$75.33 $123.81 $232.04 $336.21 $440.40 $544.84 1/1/2023
Each additional $78.55 $151.51 $221.31 $297.13 $370.11 1/1/2022
$78.55 $151.51 $224.31 $297.13 $370.11 1/1/2023
One and 1/2 yards $89.30 $149.88 $296.02 $432.04 $568,08 $701.24 1/1/2022
$89.30 $159.88 $296.02 $432.04 $568.08 $704.24 1/1/2023
Each additional $108.78 $211.14 $311.08 $116.69 $519.37 1/1/2022
$108.78 $211.44 $314.08 $416.69 $519.37 1/1/2023
Two yards $105.17 $192.20 $3007 $527.94 $695.79 $863664 1/1/2022
$105.17 $192.20 $360.07 $527.94 $695.79 $863.64 1/1/2023
Each additional $1.39.08 $271.45 $403.87 $536.30 $668,64 1/1/2022
$139.08 $271.45 $403.87 $536.30 $668.64 1/1/2023
Three yards $1-3700 $2 $188.15 $719.57 $951.02 $1,182.56 1/1/2022
$137.00 $256.63 $488.15 $719.57 $951.02 $1,182.56 1/1/2023
Each additional $199.41 $3940 $583.34 $775.29 $967.26 1/1/2022
$199.44 $391.40 $583.34 $775.29 $967.26 1/1/2023
Four yards S168.85 $321.08 $M-6.1 $911 28 $1,206.25 $4,5034 1/1/2022
$168.85 $321.08 $616.31 $911.28 $1,206.25 $1,505.34 1/1/2023
Each additional $260.50 $511.15 $762.87 $1,011.32 $1,265.91 1/1/2022
$260.50 $511.45 $762.87 $1,014.32 $1,265.91 1/1/2023
Five yards $200.55 $385.59 $744.25 $1,102.91 $1,161.56 $1,820.23 1/1/2022
$200.55 $385.59 $744.25 $1,102.91 $1,461.56 $1,820.23 1/1/2023
Each additional $320.30 $631.30 $942.33 $1,253.39 $1564-38 1/1/2022
$320.30 $631.30 $942.33 $1,253.39 $1,564.38 1/1/2023
Six yards $232.11 $449.71 $872.09 $1,291.29 $1,716.50 $2,138.83 1/1/2022
$232.41 $449.74 $872.09 $1,294.29 $1,716.50 $2,138.83 1/1/2023
Page 47
Each additional $380:40 $7-54.00 $1,121.52 $1,192.10 $1,862.71 1/1/2022
$380.40 $751.00 $1,121.52 $1,492.10 $1,862.71 1/1/2023
Eight yards $295.96 $579.71 $1,129.17 $1,678.61 $2.228.07 $2,777.54 1/1/2022
$295.96 $579.74 $1,129.17 $1,678.64 $2,228.07 $2,777.54 1/1/2023
Each additional $502.29 $991.88 $1,481.56 $1,971.23 $2,460.83 1/1/2022
$502.29 $991.88 $1,481.56 $1,971.23 $2,460.83 1/1/2023
Weekly Collection Frequency
One Two Three Four Five
1 yard compacted $2-7•96O , U�
$279.60 $524.13 $759.54 $993.77 $1,230.98 1/1/2023
2 yard compacted $134.18 0 $1,193.95 $1,573.66 $1,953.39 1/1/2022
$434.48 $814.20 $1,193.95 $1,573.66 $1,953.39 1/1/2023
3 yard compacted $580.45 $1,104.42 $47628439 -.90 $46.75,9441/1/2022
$580.45 $1,104.42 $1,628.09 $2,151.90 $2,675.90 1/1/2023
4 yard compacted $750 $1,391.81 $2,062.55 $2,730.28 $3,107.27 1/1/2022
$726.50 $1,394.81 $2,062.55 $2,730.28 $3,407.27 1/1/2023
Drop Box Collections
10 Cubic Yard Container $171.71 1/1/2022
$174.74 1/1/2023
20 Cubic Yard Container $171.74 1/1/2022
$174.74 1/1/2023
30 Cubic Yard Container $171.74 • 244.,
$174.74 1/1/2023
40 Cubic Yard Container $171.71 1/1/2022
$174.74 1/1/2023
All Compactors $182.02 1/1/2022
$182.02 1/1/2023
Delivery $84.48
normal business hours,Monday-Friday $81.48 1/1/2023
Special Drop Box Service(added to delivery fee) $50.00 1/1/2021
Page 48
Revenue Source Fee or cne Effective Date
Saturday delivery or collection, 4-day notification required $50.00 1/1/2023
Demurrage
20 Cubic Yard Container $5.99 ! ! . t . - . :. 1/1/2022
$5.99 10/20 Yard Box after 48 hours 1/1/2023
30 Cubic Yard Container $7.91 30 Yard Bo..a fter-18 hour, 2
$7.91 30 Yard Box after 48 hours 1/1/2023
40 Cubic Yard Container $7.91 10 Yard Box after 18 hours 1/1/2022
$7.91 40 Yard Box after 48 hours 1/1/2023
All Compactors
Delivery $9.59 l orn-ooith hidgy rid 1/1/2022
Service Fee plus actual disposal cost and franchise fee $9.59 Drop Box with Lid 1/1/2023
Medical Waste Collections**
On-Site Pick-up Charge 7(. 1/1/2022
$37.76 1/1/2023
Disposal Cost per up to 17 gallon unit sp2- 2 Z 1/1/2022
$24.27 1/1/2023
Disposal Cost per 23 gallon unit ti,2{6-42 1/1/2022
$26.42 1/1/2023
Disposal Cost per 31 gallon unit ,,;26-42 1/1/2022
$26.42 1/1/2023
Disposal Cost per 43 gallon unit *44. 't 1/1/2022
$33.46 1/1/2023
**Rate is the on-site collection charge plus the disposal cost per medical container unit.
Miscellaneous Service Rates
Extra mixed waste per cart-overload fee(based on 32 gallon capacity) $479 cc 1/1/2022
$4.79 /occurrence 1/1/2023
Extra yard debris(manual up to 32 gallon) $340 7Leeeufrenee 1/1/2022
$3.60 /occurrence 1/1/2023
Additional yard debris service(second 60 gallon cart) $1.20 /occurrence 1/1/2022
$4.20 /occurrence 1/1/2023
Page 49
Revenue Source Fee or Charge Effective Date
Call back/return for pick up of inaccessible cart per service call $11.38 /occurrence 4-
$14.38 /occurrence 1/1/2023
Yard service rate-extra distance away from curb after first 5 feet $4.79 i-eeenffefiee 1/1/2022
$4.79 /occurrence 1/1/2023
Special service fees $86.28 4hettif 1/1/2022
$86.28 /hour 1/1/2023
Account reinstatement fee $30.00 /occurrence 7/1/2014
NSF check fee $35.00 /occurrence 7/1/2014
Tire disposal Hourly Rate+disposal fee
Page 50
Revenue Source Fee or,Charge 111111111.1111.11111M.6 11111
COMMUNITY DEVELOPMENT-DEVELOPMENT SERVICES PLANNING
Residential Park System Development Charge(SDC)111
Single Family Detached Dwelling-Reimbursement $1,88-7 7/1/2022
$2,046 7/1/2023
Single Family Detached Dwelling-Improvement $6,812 7/1/2022
$7,384 7/1/2023
Single Family Detached Dwelling-Improvement for Neighborhood Parks
Outside River Terrace $2,526 7/1/2022
$2,738 7/1/2023
Inside River Terrace $3,131 7/1/2022
$3,394 7/1/2023
Other Residential Dwelling-Reimbursement $1,207 7/1/2022
$1,308 7/1/2023
Other Residential Dwelling-Improvement $5,129 7/1/2022
$5,560 7/1/2023
Other Residential Dwelling-Improvement for Neighborhood Parks
Outside River Terrace $1904- 7/1/2022
$2,061 7/1/2023
Inside River Terrace $2,357 7/1/2022
$2,555 7/1/2023
Non-Residential Park System Development Charge(SDC)f�1
Charge per employee-Reimbursement $1-07 7/1/2022
$116 7/1/2023
Charge per employee-Improvement $588 7/1/2022
$637 7/1/2023
[1] See methodology report used to calculate the charges.
The Park System Development Charge(Park SDC)is a City of Tigard charge that is assessed on new development to support
the acquisition and development of parks,greenways,and paved trails,all of which are used by residents of Tigard and by
those who work here. The Park SDC is a one-time fee charged to new development to help pay a portion of the costs
associated with building additional parks and trails to meet the needs created by both residential and commercial/industrial
growth. The SDC revenues can only be used on capacity-increasing capital improvements and cannot be used to repair
existing park facilities.
Page 51
Revenue Source Fee or Charge Effective Date
Park SDCs are assessed on new residential development on a per-unit basis and against commercial and industrial
development on a per-employee basis.
The amount of the charge for each land use category is adjusted each year,effective July 1st,in relation to two
indices,one reflecting changes in development/construction costs and one reflecting changes in land acquisition
costs.
For more detailed/updated information on calculating Park SDC's see"Parks&Recreation System Development
Charge Methodology Report,"by FCS Group,May 19,2015. Adopted by Ord. 15-09.
Page 52
Department Revenue Source Fee offClarge
Datel
PUBLIC WORKS-WATER
Water System Development Charge(SDC)*
/6 x s/4' Mehr $10,853 7/1/2022
5/8"x 3/4"Meter $5,973 7/1/2023
3/1"x 3/1"Meter $15,631 7/1/2022
3/4"x 3/4"Meter $8,603 7/1/2023
l"Meter X8,952 7/1/2022
1" Meter $15,934 7/1/2023
' '',—,7 "�-- ter
$864404 7/1/2022
1 1/2"Meter $47,774 7/1/2023
2"Meter $110,955 7/1/2022
2"Meter $77,576 7/1/2023
3"Meter $248,567 7/1/2022
3"Meter $136,802 7/1/2023
4" Meter $509,780 7/1/2022
4"Meter $280,564 7/1/2023
6"Meter $512,659 7/1/2022
6"Meter $298,659 7/1/2023
8o"Meter $868,251 7/1/2022
8"Meter $477,853 7/1/2023
Water system connections greater than 8 inch diameter,City will forecast the demands on an average-day,peak-day,and peak-hour basis to determine SDC fees.
*As per ORS 223.304(8)Res. 10-76,the City will use ENR Seattle CCI for the month of April prior to the budget year imposed.
Res. 22-29 updated the Water SDC methodology effective 7/1/2023.
Page 53
Department Revenue Source Fee or „,,•, ctive„„
COMMUNITY DEVELOPMENT-DEVELOPMENT SERVICES PLANNING
Residential Transportation System Development Charge(SDC)111
Single Family Detached Dwelling-Reimbursement $448 7/1/2022
$457 7/1/2023
Single Family Detached Dwelling-Improvement $760 7/1/2022
$7,917 7/1/2023
Single Family Detached Dwelling-River Terrace Overlay121 $3,796 7/1/2022
$3,873 7/1/2023
Other Residential Dwelling-Reimbursement $261 7/1/2022
$266 7/1/2023
Other Residential Dwelling-Improvement $4,527 7/1/2022
$4,618 7/1/2023
Other Residential Dwelling-River Terrace Overlay $2,214 7/1/2022
$2,259 7/1/2023
Non-Residential Transportation System Development Charge(SDC)131141
Charge per PHVT-Reimbursement $596 7/1/2022
$608 7/1/2023
Charge per PHVT-Improvement $1 7/1/2022
$10,539 7/1/2023
Charge per PHVT-River Terrace1�1 $1,273 7/1/2022
$1,299 7/1/2023
[1]See Adopted Methodology Report used to calculate the charges.
[2]Based on 50%Credit Policy for the"local” elements of River Terrace Blvd.
[3]Non-residential SDCs will be based on average charges by Peak Hour Vehicle Trips (PHVT)and shall
vary by land use type using procedures established in the Tigard SDC Administrative Procedures Guide.
[4]Non-residential SDCs charged to customers will not exceed 80%of the Transportation
Development Tax(TDT)charged as set by Washington County. When the calculated
amount does exceed 80%of TDT,the non-residential TSDC charged will be 80%of TDT.
For more detailed and updated information on calculating Transportation SDC's see"Transportation System Development
Charge Methodology Report,"by FCS Group,April 28,2015.
Transportation SDC Annual Adjustment 7/1/2015
Transportation SDC fees shall be adjusted annually on July 1st of each year beginning in 2016. The index to be used for
adjusting transportation SDCs will based on the weighted average of the year over year escalation for two measurements:90
percent multiplied by the Engineering News Record Construction Cost Index for the Seattle Area percent change plus 10
percent multiplied by the Oregon Department of Transportation monthly asphalt price (annualized)percent change.
Page 54
Department Revenue Source Fee or Charge Effective Date
Transit Oriented Development Potential Discount
Level Potential Reduction
1 10%
2 17%
3 20%
4 25%
For full details of the TSDC Discount Criteria,sec the adopted System Development Charge Administrative Procedures Guide.
Page 55
Department Revenue Source Fee or Charge Effective Date
COMMUNITY DEVELOPMENT-DEVELOPMENT SERVICES ENGINEERING
Countywide Transportation Development Tax(TDT)-(Example Land Uses and Charges*)
Single Family Detached y'),996 /per dwelling unit 7/1/2022
$10,599 7/1/2023
Apartment $54 /per dwelling unit -/1/2022
$6,935 7/1/2023
Residential Condominium/Townhouse $5,981 /per dwelling unit 7/1/2022
$6,340 7/1/2023
General Office Building $10,14 (per TSFGGA**) 7/1/2022
$11,125 7/1/2023
Shopping Center $13,731 (per TSFGGA**) 7/1/2022
$14,556 7/1/2023
Transportation Development Tax Financing 7/1/2023
Application Fee $25.00
Interest Rate Prime rate as published in the Wall Street Journal as of the date of the
application plus 4%
The Countywide Transportation Development Tax(FDT)is a Washington County Tax approved by the voters in November,2008,that is
administered and collected by the City of Tigard. It went into effect on July 1,2009,replacing the Traffic Impact Fee(TIF)program.
Like TIF,TDT is assessed on new development to help provide funds for the increased capacity transportation improvements needed to
accommodate the additional vehicle traffic and demand for transit facilities generated by that development. It provides funds for these capacity
improvements to county and city arterials,certain collectors,and certain state and transit facilities as listed in the County's Capital Improvements
Project List. The TDT is categorized as an Improvement Fee:revenue must be dedicated to capital improvements that expand capacity and may
not be used for maintenance,repair,or other non-capital improvements.
TDTs are assessed on new development on a per-unit basis. For residential uses the units are dwelling units,bedrooms,etc. For commercial and
industrial uses the units are the square footage of the use or units unique to the use such as lanes,fueling positions,etc.
For information about the TDT regarding a specific project contact the City's Permits/Projects Coordinator at(503)718-2426.
* For more detailed information on calculating TDT charges and a detailed list of Land Uses and TDT charges through 6/30/2013 see Appendix B
to Washington County Engrossed Ordinance 691,August 29,2008 and the Washington County Countywide Transportation Development Tax
Manual.
** TSFGFA =thousand square feet gross floor area;TSFGLA=thousand square feet gross leasable area.
Page 56